HSTEd
Veteran Member
- Joined
- 14 Jul 2011
- Messages
- 20,351
Modern high speed trains are capable of accelerating and decellerating extremely rapidly by the standards of the past. An N700S trainset has acceleration limited by wheelspin up to about 65mph! (And that has virtually all, or all axles motored).I'll address your first point here:
Let me give an example to show you that quicker intermediate stops on longer runs using spurs are possible. So westbound HSR trains stopping at Reading would leave the mainline at Winnersh Interchange on the M4, and follow a HSL standard spur on the A329(M)/A3290 to the mainline at Suttons Seeds/west end of Thames Valley Park, then into Reading station.
Approx. 4.84 miles of the 6.07 miles from the main HS3 line at Winnersh Interchange will be on HSL, leaving a mile and a quarter into the station. Is this going to have a massive impact on deceleration?
It's also worth noting that pointwork will place limits on the diverging route's speed due to its design and construction. The precise value is not easily available to me at this time but it is much lower than the typical linepseed of a high speed line.
Yes, because almost all non-all-stop journeys on this high speed line will be well under an hour - because we will run out of country at that point.I admit the first section of the route west out of Reading would be lower speed, with the 60 limit at Southcote Junction, then 100 up to the westbound spur at the M4 overpass near Calcot and Theale. It would be approx. 5 miles from Reading station back up to the HS3 mainline at the approaches for M4 J12.
Reading to Theale station currently takes 6 mins on a Class 387, with the superior acceleration and slightly shorter distance to the HS3 mainline, this could be cut to 5 mins. Is around 15 mins for the stop at Reading and return to the HS3 mainline really a massive issue?
There is only ~210-250km to Cardiff.
For comparison, the first rural "beet station" on the LGV Sud-Est (Le Creusot TGV) would end up somewhere west of Cardiff.
15 minutes is rather a lot in that environment.
1500 coach passengers is not nothing, but its about 1.5 train loads per day.As to your second point, I think it is prudent to point out that current passenger volumes to more far flung destinations are suppressed by price and time taken to reach key destinations.
For example, Bristol currently has an average of 55 coaches a day to London (according to Trainline), and even half of that total coach capacity would be an extra 1500 passengers a day. The Annual Average Daily Traffic (AADT) for sections of the M4 east of Bristol is around 30k a day, a large portion of that will be heading east towards the Thames Valley and London.
Viability of a HSR line has to rest on significant abstraction from other sources, and this would be no exception.
And even 30k cars per day is going to be about 3 trains per hour, assuming they all switch. And obviously, they won't all switch.
It's a significant chunk, sure, but compared to the capacity of a modern high speed line, it's not that much.
The line is not going to be anything close to full on that basis, we have to get more traffic.
Firstly, the Chiltern Main line is a terrible substitute for a high speed connection at Oxford, it is inherently slow and connected to a tiny, crowded and poorly positioned london terminus.A HSR line through both Reading and Oxford towards the West Country and South Wales is impossible without taking an long detour. If you want additional capacity towards Oxford, the obvious and cheaper thing to do (as well as HS3 along the M4 corridor) would be reinstatement of 4 track, speed upgrades and electrification of the entire Chiltern Main Line, and the branch from Bicester to Oxford.
Marylebone has appalling onward connections and I am skeptical it can truly take more trains. In any case, if a classic rail connecton is built for a high speed line at Reading - noone will want to run via Chiltern.
Secondly, the "long detour" I propose (Reading-Oxford-Swindon, as opposed to Reading-Swindon) nets out at about
EDIT: to correct the distance for the Oxford detour.
Last edited:
