There‘s one diagram that is going back to Eastleigh this afternoon which 701 is it please

5Q86 15+39 Long Marston To Eastleigh Depot departed 129 late with 69010/701518/701524.

Train terminated at Worcester at 1835 - 135 late with an unknown fault on the train which prevented it travelling any further.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

mansonlo49

Member
Joined
11 Dec 2023
Messages
1,019
Location
uk
701518/24 Reported elsewhere

HTH
thanks

== Doublepost prevention - post automatically merged: ==

5Q86 15+39 Long Marston To Eastleigh Depot departed 129 late with 69010/701518/701524.

Train terminated at Worcester at 1835 - 135 late with an unknown fault on the train which prevented it travelling any further.
some fault perhaps the loco?
 
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
Some quite big news, SWR social media confirms phased introduction (aka the proper rollout) to start late summer/early autumn, the first written timeframe since 2022! (to my knowledge)
453654147_122188597544083619_5874570309236503650_n.jpg

(https://x.com/robertkwild/status/1818984007872160185)
 

Lockwood

Established Member
Joined
4 Apr 2013
Messages
1,249
And the usual reply to that? All together now... "They didn't say which summer/autumn"
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,285
They're waiting for the temperatures to drop outside, before bringing in the cool airconditioned trains...
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,278
Location
West Wiltshire
And the usual reply to that? All together now... "They didn't say which summer/autumn"
Good comment based on previous form

On a serious note Autumn 2024 officially runs from 22nd Sept to 21st Dec, so if take early autumn as first half, could be as late as first week of November.

Of course a from date, gives no indication of completion of introduction date.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,230
Good comment based on previous form

On a serious note Autumn 2024 officially runs from 22nd Sept to 21st Dec, so if take early autumn as first half, could be as late as first week of November.

Of course a from date, gives no indication of completion of introduction date.
Would make sense given that new stock introductions elsewhere have generally been around three months after the start of training.

== Doublepost prevention - post automatically merged: ==

They're waiting for the temperatures to drop outside, before bringing in the cool airconditioned trains...
Assuming it's still Windsor first they'll be replacing existing air-conditioned trains. :D
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,892
Good comment based on previous form

On a serious note Autumn 2024 officially runs from 22nd Sept to 21st Dec, so if take early autumn as first half, could be as late as first week of November.

Of course a from date, gives no indication of completion of introduction date.
Informed Sources‘ Third Law applies… “Always mistrust schedule based on the seasons.”
 
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
When this rollout does begin, I wonder how many diagrams they'll be able to begin from the get-go? Training started this week, with the course being 10 days. I've got no clue as to how many drivers can go on one course, although I did read 9 somewhere a long time ago - may no longer be accurate with the changes that have occurred over the past few months. I'm assuming multiple courses can't run at once. The current timeframe we have at the moment is late summer/early autumn, so it depends on how many they can train up before that date comes around

Other factors to consider include rolling stock availability - an awful lot of 701s are parked up in sidings across the country, some haven't been under their own power in years.

I'm aware there's a minimum amount of drivers required for each diagram in case of one is unavailable, although not sure what this number is. Obviously there are enough of the current lot to run 1 diagram at once with the current setup.
 
Last edited:

73128

Member
Joined
8 Dec 2019
Messages
471
Location
Reading
I thought Labours idea of GBR and operator of last resort (nationalisation in all but name) is to do it free of cost and liabilities.

Why would they want to take on 455 lease payments in May 2025 if they have to pick up class 701 lease payments. There is likely to be a cost to novate any leases (and I thought based on what they have said that they don't intend to spend to take over an operator).

Would have thought this would be good incentive to not use any 455s after May 2025, especially if that is date leases expire, and lease co could charge hefty extension fee.
since the 455s will go for scrap, any extension at the current leasing rate is better than nothing to the leasing company even for a short period. I can't imagine that either side would want to have the trouble of negotiating anything else.
 
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
For those whining about no air conditioning on SW suburban…
I'll add though that the AC fails on 450s a lot. Often it's a case where one unit of the pair doesn't have it so you have to move to the other one. Happened to me twice in the past week.

== Doublepost prevention - post automatically merged: ==

-
New article from the RAIL magazine further confirming that Driver Training has begun. Interestingly they mention 8 days for the course instead of the widely known 10, I assume a misunderstanding on their part.
 
Last edited:

Bigfoot

Established Member
Joined
2 Dec 2013
Messages
1,425
New article from the RAIL magazine further confirming that Driver Training has begun. Interestingly they mention 8 days for the course instead of the widely known 10, I assume a misunderstanding on their part.
The article also states SWR are running 455/6 to fill in for the delayed Arterio. A 456 hasn't run on SWR for over 2 and a half years.
SWR has continued to operate a mixed suburban fleet of Class 455/6 and Class 458 trains to fill the timetable where the Arterios had been planned.
Mr Clifton needs to pay a little more attention:lol:
 

mansonlo49

Member
Joined
11 Dec 2023
Messages
1,019
Location
uk
The article also states SWR are running 455/6 to fill in for the delayed Arterio. A 456 hasn't run on SWR for over 2 and a half years.

Mr Clifton needs to pay a little more attention:lol:
sadly all 456 scrapped
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,403
I'll add though that the AC fails on 450s a lot. Often it's a case where one unit of the pair doesn't have it so you have to move to the other one. Happened to me twice in the past week.

== Doublepost prevention - post automatically merged: ==

-
New article from the RAIL magazine further confirming that Driver Training has begun. Interestingly they mention 8 days for the course instead of the widely known 10, I assume a misunderstanding on their part.
If they have said 8 days, I presume that is either that the press release to them said, or what they have been told by a source at SWR.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
810
Location
London
When this rollout does begin, I wonder how many diagrams they'll be able to begin from the get-go? Training started this week, with the course being 10 days. I've got no clue as to how many drivers can go on one course, although I did read 9 somewhere a long time ago - may no longer be accurate with the changes that have occurred over the past few months. I'm assuming multiple courses can't run at once. The current timeframe we have at the moment is late summer/early autumn, so it depends on how many they can train up before that date comes around

Other factors to consider include rolling stock availability - an awful lot of 701s are parked up in sidings across the country, some haven't been under their own power in years.

I'm aware there's a minimum amount of drivers required for each diagram in case of one is unavailable, although not sure what this number is. Obviously there are enough of the current lot to run 1 diagram at once with the current setup.
To introduce more diagrams at once requires more staff trained and will take longer to get to that level. Most rollouts are very gradual, it keeps the gap between unit and training rollout smaller, helps ensure drivers trained earlier don't need to do refreshes and avoids large stock reshuffles when diagrams change over. At a guess the first step might be between 1 and 3 diagrams on the Windsor line. Early autumn is only a couple of months so relatively few drivers will be trained which will limit what is possible.

The current setup gives 1 diagram with 10 hours outside depots, it's possibly inefficient as the crews might only work those services in the shift and not reduce the required crew diagrams in the main pool by the same amount. If that was the case, a priority might be to get regular drivers to take over to allow the current crews to cover regular shifts and free up more drivers for training. If it wouldn't make much difference could keep as is and look to take on further diagrams instead.

From an outsider perspective on the other Windsor line unit diagrams, one looks to go from Feltham Depot stables at Wimbledon Park Depot Sidings between peaks and comes out again returning to Feltham Depot at end of day. Another starts and ends at Feltham Depot working only Windsor line services. Those seem reasonable candidates as allows stock to rotate around and Feltham has fewer trains starting at weekends. Weekend workings often start much later as diagrams change more frequently and less flexibility to get a trained driver to work a specific crew diagram. The other two seem more complex in the permanent timetable as one starts at Windsor itself and ends up Staines C.H.S with another unit doing the reverse making unit rotation harder plus a need to be in service at weekends. It's possible with some alterations they could switch over smoothly and which ones make more sense crew wise is hard to tell without knowing the crew diagrams.
 
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
To introduce more diagrams at once requires more staff trained and will take longer to get to that level. Most rollouts are very gradual, it keeps the gap between unit and training rollout smaller, helps ensure drivers trained earlier don't need to do refreshes and avoids large stock reshuffles when diagrams change over. At a guess the first step might be between 1 and 3 diagrams on the Windsor line. Early autumn is only a couple of months so relatively few drivers will be trained which will limit what is possible.

The current setup gives 1 diagram with 10 hours outside depots, it's possibly inefficient as the crews might only work those services in the shift and not reduce the required crew diagrams in the main pool by the same amount. If that was the case, a priority might be to get regular drivers to take over to allow the current crews to cover regular shifts and free up more drivers for training. If it wouldn't make much difference could keep as is and look to take on further diagrams instead.

From an outsider perspective on the other Windsor line unit diagrams, one looks to go from Feltham Depot stables at Wimbledon Park Depot Sidings between peaks and comes out again returning to Feltham Depot at end of day. Another starts and ends at Feltham Depot working only Windsor line services. Those seem reasonable candidates as allows stock to rotate around and Feltham has fewer trains starting at weekends. Weekend workings often start much later as diagrams change more frequently and less flexibility to get a trained driver to work a specific crew diagram. The other two seem more complex in the permanent timetable as one starts at Windsor itself and ends up Staines C.H.S with another unit doing the reverse making unit rotation harder plus a need to be in service at weekends. It's possible with some alterations they could switch over smoothly and which ones make more sense crew wise is hard to tell without knowing the crew diagrams.
Thanks for the insight
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,230
To introduce more diagrams at once requires more staff trained and will take longer to get to that level. Most rollouts are very gradual, it keeps the gap between unit and training rollout smaller, helps ensure drivers trained earlier don't need to do refreshes and avoids large stock reshuffles when diagrams change over. At a guess the first step might be between 1 and 3 diagrams on the Windsor line. Early autumn is only a couple of months so relatively few drivers will be trained which will limit what is possible.

The current setup gives 1 diagram with 10 hours outside depots, it's possibly inefficient as the crews might only work those services in the shift and not reduce the required crew diagrams in the main pool by the same amount. If that was the case, a priority might be to get regular drivers to take over to allow the current crews to cover regular shifts and free up more drivers for training. If it wouldn't make much difference could keep as is and look to take on further diagrams instead.

From an outsider perspective on the other Windsor line unit diagrams, one looks to go from Feltham Depot stables at Wimbledon Park Depot Sidings between peaks and comes out again returning to Feltham Depot at end of day. Another starts and ends at Feltham Depot working only Windsor line services. Those seem reasonable candidates as allows stock to rotate around and Feltham has fewer trains starting at weekends. Weekend workings often start much later as diagrams change more frequently and less flexibility to get a trained driver to work a specific crew diagram. The other two seem more complex in the permanent timetable as one starts at Windsor itself and ends up Staines C.H.S with another unit doing the reverse making unit rotation harder plus a need to be in service at weekends. It's possible with some alterations they could switch over smoothly and which ones make more sense crew wise is hard to tell without knowing the crew diagrams.
Very interesting, thanks. And makes perfect sense recalling how other new stock roll-outs have gone.
 

mansonlo49

Member
Joined
11 Dec 2023
Messages
1,019
Location
uk
Hello, is there anyone know which one is this thanks
 

Attachments

  • IMG_9126.png
    IMG_9126.png