coppercapped
Established Member
In my post #222 in the thread 'Elizabeth Line Platform Gaps - BBC News' in the 'Infrastructure & Stations' sub-Forum I suggested that the Crossrail/Elizabeth line needed its own segregated tracks.
I knew my suggestion that TfL should broaden the GW route out of Paddington (see what I did there…!) would provoke some reaction… But my analysis of the situation shows that the GW is not wide enough. This discussion more properly belongs in Speculative Discussions so I have added some background explaining more fully why I reached the conclusion that I did.
I originally wrote about this concept some six years ago, but then it didn’t cause even a ripple because Crossrail had still not been completed and so it was purely theoretical issue. Elizabeth line trains are now running and this time people noticed!
Firstly, to all those who say that the existing traffic does not require the extra tracks and ask ‘why add more?’. You are, of course, quite right; the current infrastructure can just about handle the current train service so there is clearly no need. But…
…now there are many, many more trains running than during my childhood in Reading seventy years ago: they are all longer and faster and the freight trains are much heavier and there are still only four sets of rails between Paddington and Didcot. This has had four effects:
It is instructive to compare the GW and WCML routes out of London. Both have fast long distance trains as well as semi-fast and more local trains serving a similar mix of dormitory, market and industrial towns. By repute the WCML services are now more reliable than those on the GW.
On the West Coast slow lines there are three stations at which passenger trains can call between Watford and Euston: Harrow and Wealdstone; Wembley Central and Queens Park although as far as I know the outer suburban/semi-fast trains call only at Harrow. It also has the DC Electric line as far as Watford Junction with a dozen intermediate stops supporting a metro frequency train service.
Between Paddington and Slough (chosen because it is about the same distance from Paddington as Watford Junction is from Euston and because both towns have similar hinterland) there are nine stations (Langley to Acton Main Line inclusive) on the Reliefs. This will increase to ten when Old Oak Common opens.
TfL is talking about running metro-frequencies on the GW Relief lines — 10 tph to West Drayton has been mentioned quite apart from the Heathrow services. At these frequencies Crossrail becomes essentially the Central Line on steroids. To work properly it needs a separate set of tracks so its timekeeping through the central section is not affected by the late departure of a Cross Country train at Oxford causing knock-on delays to a outer-suburban service from Didcot which in turn causes a Crossrail train from Maidenhead to miss its path so creating a gap in the service at Tottenham Court Road. The western end of Crossrail is the modern equivalent of the Bakerloo and the DC electric service from Euston to Harrow and Watford and ideally the GW track arrangements should reflect this state of affairs.
Various documents have been published by Network Rail and other interested parties on infrastructure enhancements needed if some long proposed additional stations were finally built. For example two or three new stations have been suggested on the stretch between Didcot and Swindon: Grove/Wantage and one or two stations at either or both of Shrivenham, on the busy A420 Swindon-Oxford road, and near Stratton on the A419 by-pass running from the M4 round the eastern and northern sides of Swindon, The latter would be near to or at the point the A419 crosses the A420. Further west towards Bristol stations at Wootton Bassett and Corsham have also been proposed which would feed in to the concept of a semi-fast service between London and Bristol.
The trouble is that there is no capacity on the line into Paddington for the extra two trains per hour in each direction that would be needed. So the stations remain unbuilt and the inhabitants continue to drive.
There are similar suggestions for intensifying services on the Berks and Hants line and that to Oxford both requiring through running to and from London. Again — not possible.
If Crossrail/Elizabeth line used segregated tracks in the same way as the Bakerloo and DC Electric lines on the WCML then it would be much easier to path the GW outer-suburban trains — essentially the services to Newbury, Didcot and Oxford — and speed them up by reducing waiting times as well as an increase in frequency. A semi-fast service at least as far as Swindon, would make using the train a viable alternative for the first time for two generations.
Getting the all-stations Crossrail trains off the Reliefs east of Slough would also:
(a) make it possible to path some or all of the non-stop HEx trains from the airport to Paddington - either terminating there or, more likely, continuing through the central Crossrail tunnels - on the Relief lines. Taking HEx off the Mains would make space for additional long distance trains to Devon and Cornwall, the Bristol area and the Cotswolds.
(b) open up space for additional freight paths. It is not true that there is little freight on the GW, it is in fact one of the busiest freight corridors in the country
(c) ease the pathing of the increase in trains needed for the putative Western Rail Access to Heathrow. This proposal is still on the back burner (although currently not funded) as Heathrow’s passenger numbers have returned to pre-COVID levels.
In my original post I didn’t go into detail on how the additional tracks would be built. Although I gave an example of the German railways adding a pair of tracks alongside the Munich - Augsburg line it is clear that this approach would not work well for the GW route because of the very built-up nature of the area. It may well be that much will have to be in tunnel and if this is the case there is no reason why the route should not deviate from the GW alignment and serve areas which are not so well rail connected.
Alternatively adding (tunnelled) Main Lines may be feasible with the current Main Lines taking over the rôle of the current Reliefs. Whatever — the current infrastructure is not future-proof and, one could argue, it is not even present-proof.
I knew my suggestion that TfL should broaden the GW route out of Paddington (see what I did there…!) would provoke some reaction… But my analysis of the situation shows that the GW is not wide enough. This discussion more properly belongs in Speculative Discussions so I have added some background explaining more fully why I reached the conclusion that I did.
I originally wrote about this concept some six years ago, but then it didn’t cause even a ripple because Crossrail had still not been completed and so it was purely theoretical issue. Elizabeth line trains are now running and this time people noticed!
Firstly, to all those who say that the existing traffic does not require the extra tracks and ask ‘why add more?’. You are, of course, quite right; the current infrastructure can just about handle the current train service so there is clearly no need. But…
…now there are many, many more trains running than during my childhood in Reading seventy years ago: they are all longer and faster and the freight trains are much heavier and there are still only four sets of rails between Paddington and Didcot. This has had four effects:
- if any disturbance occurs now it delays many more trains and affects many more people than it used to do
- the limitations in the infrastructure mean that it is more difficult to recover the service quickly
- adding extra trains to intensify existing services is nearly impossible
- adding extra trains for new routes and stations is impossible.
It is instructive to compare the GW and WCML routes out of London. Both have fast long distance trains as well as semi-fast and more local trains serving a similar mix of dormitory, market and industrial towns. By repute the WCML services are now more reliable than those on the GW.
On the West Coast slow lines there are three stations at which passenger trains can call between Watford and Euston: Harrow and Wealdstone; Wembley Central and Queens Park although as far as I know the outer suburban/semi-fast trains call only at Harrow. It also has the DC Electric line as far as Watford Junction with a dozen intermediate stops supporting a metro frequency train service.
Between Paddington and Slough (chosen because it is about the same distance from Paddington as Watford Junction is from Euston and because both towns have similar hinterland) there are nine stations (Langley to Acton Main Line inclusive) on the Reliefs. This will increase to ten when Old Oak Common opens.
TfL is talking about running metro-frequencies on the GW Relief lines — 10 tph to West Drayton has been mentioned quite apart from the Heathrow services. At these frequencies Crossrail becomes essentially the Central Line on steroids. To work properly it needs a separate set of tracks so its timekeeping through the central section is not affected by the late departure of a Cross Country train at Oxford causing knock-on delays to a outer-suburban service from Didcot which in turn causes a Crossrail train from Maidenhead to miss its path so creating a gap in the service at Tottenham Court Road. The western end of Crossrail is the modern equivalent of the Bakerloo and the DC electric service from Euston to Harrow and Watford and ideally the GW track arrangements should reflect this state of affairs.
Various documents have been published by Network Rail and other interested parties on infrastructure enhancements needed if some long proposed additional stations were finally built. For example two or three new stations have been suggested on the stretch between Didcot and Swindon: Grove/Wantage and one or two stations at either or both of Shrivenham, on the busy A420 Swindon-Oxford road, and near Stratton on the A419 by-pass running from the M4 round the eastern and northern sides of Swindon, The latter would be near to or at the point the A419 crosses the A420. Further west towards Bristol stations at Wootton Bassett and Corsham have also been proposed which would feed in to the concept of a semi-fast service between London and Bristol.
The trouble is that there is no capacity on the line into Paddington for the extra two trains per hour in each direction that would be needed. So the stations remain unbuilt and the inhabitants continue to drive.
There are similar suggestions for intensifying services on the Berks and Hants line and that to Oxford both requiring through running to and from London. Again — not possible.
If Crossrail/Elizabeth line used segregated tracks in the same way as the Bakerloo and DC Electric lines on the WCML then it would be much easier to path the GW outer-suburban trains — essentially the services to Newbury, Didcot and Oxford — and speed them up by reducing waiting times as well as an increase in frequency. A semi-fast service at least as far as Swindon, would make using the train a viable alternative for the first time for two generations.
Getting the all-stations Crossrail trains off the Reliefs east of Slough would also:
(a) make it possible to path some or all of the non-stop HEx trains from the airport to Paddington - either terminating there or, more likely, continuing through the central Crossrail tunnels - on the Relief lines. Taking HEx off the Mains would make space for additional long distance trains to Devon and Cornwall, the Bristol area and the Cotswolds.
(b) open up space for additional freight paths. It is not true that there is little freight on the GW, it is in fact one of the busiest freight corridors in the country
(c) ease the pathing of the increase in trains needed for the putative Western Rail Access to Heathrow. This proposal is still on the back burner (although currently not funded) as Heathrow’s passenger numbers have returned to pre-COVID levels.
In my original post I didn’t go into detail on how the additional tracks would be built. Although I gave an example of the German railways adding a pair of tracks alongside the Munich - Augsburg line it is clear that this approach would not work well for the GW route because of the very built-up nature of the area. It may well be that much will have to be in tunnel and if this is the case there is no reason why the route should not deviate from the GW alignment and serve areas which are not so well rail connected.
Alternatively adding (tunnelled) Main Lines may be feasible with the current Main Lines taking over the rôle of the current Reliefs. Whatever — the current infrastructure is not future-proof and, one could argue, it is not even present-proof.
