• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

PPM

Status
Not open for further replies.

Jrocks

Member
Joined
27 Apr 2021
Messages
167
Location
Torbay
A short thread this one. I'm just curious, is PPM (Public Performance Measure) based off of the Working Timetable or the Public timetable?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
28 Feb 2009
Messages
241
A short thread this one. I'm just curious, is PPM based off of the Working Timetable or the Public GBTT?
Pretty sure it’s the public timetable. I remember as a Controller trains arriving 10’ late, only to be hailed a PPM success due to a two minute differential at destination.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,992
Location
London
PPM itself doesnt exist anymore.

Tell that to daily performance reports I read! It may not be a truly "official" figure but it is still very much used in the industry. Even the ORR report refers to PPM https://dataportal.orr.gov.uk/statistics/performance/passenger-rail-performance/

  • Using the Public Performance Measure (PPM), 86.8% of trains were punctual (early or less than 5/10 minutes after the scheduled arrival time) at their final destination in the latest quarter.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,764
A short thread this one. I'm just curious, is PPM based off of the Working Timetable or the Public GBTT?

Public


PPM itself doesnt exist anymore.

Oh it definitely exists. But it is not, now, a measure by which the ORR or DfT holds the rail industry to account for.

That’s except for the Elizabeth Line, where TfL do measure MTREL on PPM and incentivise them accordingly.
 
Last edited:
Status
Not open for further replies.

Top