• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

New private sidings in 2023 or 2024

Status
Not open for further replies.

railfan99

Established Member
Joined
14 Jun 2020
Messages
1,961
Location
Victoria, Australia
Private sidings are not cheap to construct.

In many Western nations, the trend has been fewer are actively used, partly because of the dominance of road transport.

Some businesses that might be a candidate for using rail freight lack properties next to rail lines.

Logistics managers sometimes prefer to minimise 'lifts' of containers: they view it as easier to place a container on a truck with no use of rail given the 'first' and 'last' mile(s) must occur by road anyway.

Have any new private sidings come into operation in calendar 2023, or 2024 thus far?

Were they completely funded by private enterprise or did government (either through Network Rail or some other way) contribute?

Are these new private sidings being used?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,691
Location
Hope Valley
Hillhead Quarry, south of Buxton, opened on 28 July 2023 (a long-derelict and removed older connection). Has been busy sending out many thousands of tonnes of aggregate, mainly for HS2, since then.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,528
Location
Preston Lancs
Hillhead Quarry, south of Buxton, opened on 28 July 2023 (a long-derelict and removed older connection). Has been busy sending out many thousands of tonnes of aggregate, mainly for HS2, since then.
Thanks I did not know that.

Great idea for a thread btw.
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,914
Fox Group aggregates sidings at Leyland just sneak in. First train 9th Jan 2023. A rebuild of the disused Leyland Motors sidings. Co-incidentally, one of the sending quarries is Hillhead!

Horton in Ribblesdale quarry siding currently being constructed

Does the new Royal Mail siding at DIRFT qualify, despite being in the running for one of the shortest lived sidings around?
 
Last edited:

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,194
Hillhead Quarry, south of Buxton, opened on 28 July 2023 (a long-derelict and removed older connection). Has been busy sending out many thousands of tonnes of aggregate, mainly for HS2, since then.
Does Hillhead have its own railhead then? I can’t see it on google maps.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,691
Location
Hope Valley
Does Hillhead have its own railhead then? I can’t see it on google maps.
Definitely. I’ve been there. Quite a few photos in the railway press.
Relatively unusual these days because it’s access is via a key token release ground frame - so minimum signalling changes.

Another ‘coming’ one is the Northampton Gateway Strategic Rail Freight Interchange, with full main line signalling and electrification of the WCML, but not sure that it will open in 2024.

I suppose that the new Royal Mail depot ‘within’ Daventry/DIRFT is another one (no new main line connection) but closure already announced as mentioned above.
 

mcmad

Member
Joined
11 Mar 2015
Messages
1,076
When did the highland spring terminal open? Funded by the company with some funding from whatever section 8 grants are called these days. Norboard at Inverness are also planning to install sidings, the main line connection was completed as part of the Dalcross station works.
 

matchmaker

Established Member
Joined
8 Mar 2009
Messages
1,884
Location
Central Scotland
When did the highland spring terminal open? Funded by the company with some funding from whatever section 8 grants are called these days. Norboard at Inverness are also planning to install sidings, the main line connection was completed as part of the Dalcross station works.
September 2022 for Highland Spring.
 

IanH440

Member
Joined
11 Oct 2017
Messages
38
Ashville Aggregates on the West Drayton Branch..... just opening new yard... served by GBRF i believe
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
The new HS2 siding on the Up side just north of West Ruislip opened last year, specifically for rail-borne delivery of tunnel segments.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,716
The new HS2 siding on the Up side just north of West Ruislip opened last year, specifically for rail-borne delivery of tunnel segments.
Id argue that wasn't technically "new", the sidings were always there.
 

ayubdaud

Member
Joined
11 Mar 2020
Messages
82
Location
Bolton
I was under the impression that Hillhead Quarry got mothballed? Not sure when the last time a train ran out of there.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,691
Location
Hope Valley
Great. More freight for the Settle-Carlisle line.
I thought that the Horton scheme was just displacing the road shuttle to the Ribblehead siding. Obviously more environmentally friendly but the trains will still go forward to Blea Moor to run round.
(Happy to be corrected on this.)
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,914
I thought that the Horton scheme was just displacing the road shuttle to the Ribblehead siding. Obviously more environmentally friendly but the trains will still go forward to Blea Moor to run round.
(Happy to be corrected on this.)
Correct in the sense that, to save money, no Xover is being provided at Horton and the run round will be done further north.

I think, again I stand to be corrected, that Ribblehead also serves another quarry in the Ingleton direction.
Needs the bridge completing and the level crossing removed first.
Would these be at Horton station to provide wheelchair access for those wishing to venture onto the moors?
 

MisterSheeps

Member
Joined
12 Jun 2022
Messages
316
Location
Kendal, England
Ribblehead also serves another quarry in the Ingleton direction
Yes, the one on the left (north) side of the road from White Scar cave to Chapel le Dale; erroneously termed 'Ingleton Granite', but actually Cambrian slate. In a bygone age the quarry had a line down the valley above the road, round below Crina Bottom, and a rope worked incline to the Ingleton line
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Would these be at Horton station to provide wheelchair access for those wishing to venture onto the moors?
When I did the three peaks I wouldn’t have appreciated having to clamber up a footbridge at the end!
It was pretty good looking down on the long coal trains crawling over the Ribblehead Viaduct though.

Does the renewed Hartlepool docks line for the HS2 tunnel segment factory count as a ‘new’ private siding?
 

Grumpy Git

On Moderation
Joined
13 Oct 2019
Messages
2,255
Location
Liverpool
Does Hillhead have its own railhead then? I can’t see it on google maps.

Nice article and great video here (from July 2023, but still a great watch):

https://www.agg-net.com/news/first-train-for-new-tarmac-peak-district-rail-link

TARMAC have reopened a Peak District rail connection to expand the supply of aggregates to their customers via freight trains. Thanks to the development of new internal rail sidings, Hillhead Quarry, which operates on the High Peak Junction line, near Buxton, in Derbyshire, has been connected to the rail network to meet the current demands of the construction sector and other nationally important major infrastructure projects.

The sidings provide Tarmac with the capability to haul large quantities of bulk limestone aggregate each day, with rail transport also reducing carbon emissions. With the first train having departed from Hillhead Quarry earlier this month, the rail link is expected to increase to at least five trains per week over time.
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
798
Location
Doncaster
I'd say it's a rare (or at least infrequent) event to get a brand new private siding connection to the network installed, with associated resignalling and expense. A high-profile example that springs to mind (albeit from a few years ago) was the opening of the "East Midlands Gateway" (EMG) container terminal in 2020, on a large site near East Midlands Airport. It currently handles four trains a day from the ports (3 from Felixstowe, 1 from Southampton). It's classed as a "Strategic Railfreight Interchange." I think the general idea is that this type of infrastructure would be self-funding from the large amount of warehousing involved, although government probably pay for things like associated local road improvements. Providing rail facilities will be a key factor in getting planning permission in the first place. The containers on the trains will be eligible for "modal shift revenue support" from the government, in the form of a payment per container to offset the higher cost of moving them by rail. Freight Facilities grants for terminal infrastructure are available in Wales and Scotland but not England.
https://www.maritimetransport.com/n...ands-gateway-terminal-on-track-for-completion
https://www.slp-emg.com/
The terminal seems to be a success and has expanded slightly in a "phase 2" project which involved a couple more sidings and a second concrete pad for container loading and storage.
https://www.winvic.co.uk/case-studi...-east-midlands-gateway-rail-terminal-phase-2/
(The above link about phase 2 at EMG also links to further information on similar projects at "DIRFT III" and the Northampton project mentioned above).

Almost adjacent to the East Midlands Gateway site is its evil twin, the East Midlands Distribution Centre at Castle Donington, completed at the end of 2011. Despite including "a rail freight terminal with two 450m sidings, plus installation of a rail connection, signalling, rail track and ballast as well as construction of a dedicated rail off-loading zone complete with 2km of new rail track" I don't think it has ever seen a revenue-earning freight train conveying any products to or from the associated warehousing (most notably for M&S).
https://www.winvic.co.uk/case-studies/east-midlands-distribution-centre-castle-donington/
It's often used as an example of a situation where a rail terminal is built to secure planning permission, without there necessarily being firm plans to use it. However, in a further plot twist, the rail connection into Castle Donington has not been entirely wasted. The rail connection from EMG joins the main line facing west, and the run round loop at the entrance to Castle Donington is used to enable trains from EMG to run round and head east towards Felixstowe, avoiding the need to detour via Birmingham (providing the trains are gauge-cleared for the route via Loughborough - 2 out of the 3 Felixstowe services go this way currently).

While brand new private siding connections tend to be reserved for larger projects, a more common scenario is the re-use of existing connections into disused sidings, which do not require signalling alterations. In this way new terminals can be created with minimal outlay on new infrastructure. Unless a press release is sent out, these may not attract much attention. For example, a new terminal opened at Langley for Brett Aggregates last year:

In West London, a new Brett rail siding at Langley has been open and running since May 2023. It services customers for sand and gravel with material railed in from our marine wharves. There is room to expand on the site and we are keen to broaden the scope of the operations there. (Brett Aggregates Newsletter April 2024)

The Langley aggregate terminal is on the site of a former oil terminal which used to receive trains of aviation fuel from Lindsey Refinery (Humberside) for Heathrow Airport. Langley oil terminal was replaced by a facility at Colnbrook which is still rail-served, currently from the Isle of Grain. Langley sidings were later used as a base for loading contractors materials onto engineers trains during the electrification of the Great Western Main Line, but it's good to see them back in use as a rail freight terminal. Capital Concrete (joint venture between Brett Aggregates and Breedon) have also secured planning permission for a concrete batching plant on the site which will take in aggregate by rail and is probably in use by now. The terminal is served by trains of sea-dredged aggregates from both Cliffe and Newhaven.

Another terminal opened fairly recently (although perhaps slightly earlier than 2023) was the facility serving "Quattro" within Acton Yard (aggregate supply and a concrete plant). This is a second stone terminal in the yard, in addition to the existing Foster Yeoman (now Aggregate Industries) hopper discharge facility. The new Quattro terminal involved minor track alterations to sidings in the yard, but I don't think it required any changes to signalling.

Freight terminals are recognised to be strategic assets, and closed terminals in useful locations are often retained for possible future re-use. With the exception of larger projects, any company looking to set up a new railfreight terminal would probably consider existing sites first (planning permission would be easier for a start). These are some Network Rail documents detailing freight terminals of various types, both active and inactive:
https://www.networkrail.co.uk/wp-content/uploads/2016/12/Intermodal-rail-sites.pdf
https://www.networkrail.co.uk/wp-co...work-Rail-freight-map-construction-sector.pdf
https://www.networkrail.co.uk/wp-content/uploads/2022/02/Network-Rail-freight-map-other-sectors.pdf

This "Target 26" document gives some interesting detail on proposed enhancements to allow longer 26-wagon trains of construction materials in London, giving some idea of the work involved even for fairly minor changes to sidings: https://www.networkrail.co.uk/wp-content/uploads/2022/02/Target-26.pdf
 
Status
Not open for further replies.

Top