Assume they may mean the secondary route via Honiton but that’s hardly Main Line!
Some of us would beg to differ.
Pragmatically, I see that route as more suitable for a dual voltage solution.
Assume they may mean the secondary route via Honiton but that’s hardly Main Line!
When that 379 was rigged up with battery that limit applied (a 379 being an electrostar of the same family as 377 so was relevant).I thought I had read that battery for Uckfield had been rejected because there was not sufficient time to recharge?
Has this now changed with advances in technology?
you'd probably order new BEMUs for southern for that purpose, rather than adapt existing units. In practice, it would make sense to bundle this with a new order for 3rd rail stock for the same operator, for training and maintenance ease (and to avoid microfleets). So next time Southern is in need of a new fleet of EMUs would make sense.If, as stated in posts 10 & 13, the battery technology is proven and available, why is no-one demanding its implementation on one of these lines? Why don't we just experiment and judge the results? For example, how many train sets would need to be converted for the Marshlink line?
That is good to hear!Good point. Incidentally, I was at West Ealing Station a few weeks ago and one of the experimental trains was in the bay platform. I asked a member of the team if the results so far were encouraging and he replied "very."
If you're fully electrifying the West of England Line, you'd presumably pick a place suitable for changeover within the current third-rail section, and go OHLE from there. From what I understand, you want the dual-voltage section to be as short as possible, so ideally a station at which every service stops (and reversing and terminating services is possible)Some of us would beg to differ.
Pragmatically, I see that route as more suitable for a dual voltage solution.
Southern in total has 47 diesel vehicles across 17 units (from Wikipedia). It's a tiny proportion of both the Southern fleet and diesel fleet in general (around 2,800 vehicles from last ORR release). Marshlink is 3 diagrams so really you'd want to switch both Marshlink and Uckfield away at the same time. There are bigger wins for decarbonisation elsewhere including battery trials for branch lines and avoiding ordering new diesel only trains.If, as stated in posts 10 & 13, the battery technology is proven and available, why is no-one demanding its implementation on one of these lines? Why don't we just experiment and judge the results? For example, how many train sets would need to be converted for the Marshlink line?
Just as long as those batteries aren't attached to a 777. To be fair, the non battery ones are dire as well.There’s no need to electrify these with third rail. Batteries are the answer.
Considering the amount of graffiti around London, there must be a lot of trespass. Yet electrocution incidents are quite rare. The most recent incident I can think of is the people that got hit by a train near Brixton. But that could have happened anywhere. Not sure how accurate this list is but the majority of railway incidents involving graffiti artists have been collision with a train.Hopefully as said above the new government will change there mind, surely the bakerloo extension will face the same challenge. I just can't understand how the ORR is so incapable of anything, if I was standing in a position to electrify myself on a 3rd rail, I'd also be standing in a position where I could get hit buy a train, no matter what power it uses, but unfortunately the people that were in power didn't seem to get that
you'd probably order new BEMUs for southern for that purpose, rather than adapt existing units. In practice, it would make sense to bundle this with a new order for 3rd rail stock for the same operator, for training and maintenance ease (and to avoid microfleets). So next time Southern is in need of a new fleet of EMUs would make sense.
That is good to hear!
== Doublepost prevention - post automatically merged: ==
If you're fully electrifying the West of England Line, you'd presumably pick a place suitable for changeover within the current third-rail section, and go OHLE from there. From what I understand, you want the dual-voltage section to be as short as possible, so ideally a station at which every service stops (and reversing and terminating services is possible)
There is already a section of third rail on the down Salisbury line. Unfortunately, it is outwith the braking distance of a wrongly routed train travelling at line speed.I'd third rail to the west of the junction at Basingstoke and changeover there.
There is already a section of third rail on the down Salisbury line. Unfortunately, it is outwith the braking distance of a wrongly routed train travelling at line speed.
Considering the amount of graffiti around London, there must be a lot of trespass. Yet electrocution incidents are quite rare. The most recent incident I can think of is the people that got hit by a train near Brixton.
Oh i hope its not another Strood scenario.There are several incidents of trespassers being electrocuted each year, this year being no exception. Network Rail is likely to find itself in court about at least one of the recent incidents.
Surprised that there aren't news items about them. I typed a few likely phrases into Google and every result was at least a year old.There are several incidents of trespassers being electrocuted each year, this year being no exception. Network Rail is likely to find itself in court about at least one of the recent incidents.
Bakerloo Extension is either entirely within tunnels (planned extension to Lewisham), or taking over an existing 3rd rail route (proposed extension from Lewisham to Hayes) where conversion to a 4th rail system doesn't add any new risk compared to the existing 3rd rail system.Hopefully as said above the new government will change there mind, surely the bakerloo extension will face the same challenge. I just can't understand how the ORR is so incapable of anything, if I was standing in a position to electrify myself on a 3rd rail, I'd also be standing in a position where I could get hit buy a train, no matter what power it uses, but unfortunately the people that were in power didn't seem to get that
There’s no need to electrify these with third rail. Batteries are the answer.
Possibly on some short sections of railway with just an hourly service to limit the requirement for rolling stock with batteries including Uckfield and a reopened Totton-Hythe line for an hourly Southampton Central to Hythe train service but in that case the hourly London Bridge to Uckfield service should be switched to battery trains now. Diesel trains currently run hourly between Uckfield and London Bridge and clearly must be adding to air pollution in South London. It does require special trains with batteries so the abundant standard third rail electric rolling stock cannot be used. The Reading to Gatwick Airport half hourly service really needs a lot of high capacity trains and is currently stuck with hopelessly inadequate diesel trains so the two unelectrified sections of the North Downs Line should have infill third rail electrification so the Reading to Gatwick Airport service can be run half hourly with high capacity third rail electric rolling stock. Looking at the following record of rail electrification datesThe technology was there a decade ago. It’s cheaper now.
No need to wait for that. Battery trains are in service in this country, and in many other countries around the world. Range isnt an issue - fit a bigger battery!
some third rail electrification including the lines Poole to Weymouth and Eastleigh and Southampton to Portsmouth was installed as recently as around 1990 so if the effective ban on extending third rail electrification had been in place then the current very important London Waterloo to Weymouth, London Waterloo to Portsmouth via Eastleigh and Portsmouth to Southampton electric train services would have been impossible.
There are several incidents of trespassers being electrocuted each year, this year being no exception. Network Rail is likely to find itself in court about at least one of the recent incidents.
One can only hope that the courts resist the temptation to engage in judicial activism.
I'd third rail to the west of the junction at Basingstoke and changeover there.
There isn't an effective ban, various health and safety legislation requires the minimisation of risk. Proposers of new third rail electrification need to show they have considered alternatives and that those alternatives are grossly disproportionate. For new electrification there are often other options including battery technology, where new tracks are added to existing routes or short chords between them the lack of viable alternatives makes the case easier to justify.Possibly on some short sections of railway with just an hourly service to limit the requirement for rolling stock with batteries including Uckfield and a reopened Totton-Hythe line for an hourly Southampton Central to Hythe train service but in that case the hourly London Bridge to Uckfield service should be switched to battery trains now. Diesel trains currently run hourly between Uckfield and London Bridge and clearly must be adding to air pollution in South London. It does require special trains with batteries so the abundant standard third rail electric rolling stock cannot be used. The Reading to Gatwick Airport half hourly service really needs a lot of high capacity trains and is currently stuck with hopelessly inadequate diesel trains so the two unelectrified sections of the North Downs Line should have infill third rail electrification so the Reading to Gatwick Airport service can be run half hourly with high capacity third rail electric rolling stock. Looking at the following record of rail electrification dates
some third rail electrification including the lines Poole to Weymouth and Eastleigh and Southampton to Portsmouth was installed as recently as around 1990 so if the effective ban on extending third rail electrification had been in place then the current very important London Waterloo to Weymouth, London Waterloo to Portsmouth via Eastleigh and Portsmouth to Southampton electric train services would have been impossible.
Whatever the legal issues there is no logic to this effective ban on third rail electrification infill. It is impossible to close down the very extensive third rail network South of London and it is financially impossible to convert it all to 25 kV AC overhead so risks need to be managed and if necessary the law should be changed to make third rail infill possible in places where it is needed. Third rail infill of the two unelectrified sections of the North Downs Line would be a very small percentage increase in the total length of third rail electrified railway line.
If you trespass, you trespass at your own risk. If you trespass near an exposed electric rail you increase that risk. On your head be it.One can only hope that the courts resist the temptation to engage in judicial activism.
The West of England Line Basingstoke-Salisbury-Exeter is a very important route to the West Country especially for rail passengers in the South of England with an hourly SWR service London Waterloo to Salisbury and an hourly SWR service London Waterloo to Exeter with a connection at Salisbury to the hourly GWR service Cardiff Central to Portsmouth Harbour. Too much of the line between Salisbury and Exeter is single track and some restoration of single track sections to double track is needed to improve train services. The Basingstoke to Salisbury line is also part of the Basingstoke to Southampton via Laverstock Junction freight route so is a candidate for 25kV AC overhead electrification for freight trains. The West of England Line has an important role to play in growing the railway and running more train services so longer term it would be useful have 25 kV AC overhead electrification on the whole of the route from Basingstoke to Exeter and run services from London Waterloo to Salisbury and Exeter with dual voltage electric trains.Assume they may mean the secondary route via Honiton but that’s hardly Main Line!
That's not how the legal framework in the UK worksIf you trespass, you trespass at your own risk. If you trespass near an exposed electric rail you increase that risk. On your head be it.
I wouldn't say 1990 is exactly recent in UK railway terms - a LOT has changed in the way the railway is controlled since then! Privatisation and the entire way the railway is regulated, for example.
I could see an argument for electrifying to Uckfield with 25kV, as there would only be one interface to the third rail. Also the signalling there is SSI, which should already be AC immune, or easily made so. And it could use bimode AC/DC trains, as already used on Thameslink (perhaps even make Uckfield a Thameslink route?)
Agreed that short infills on the North Downs with 25kV would not make sense (and could have some technical challenges too!). However, the line currently runs with diesel stock that would need replacing if the gaps were electrified, as AFAIAA there aren't sufficient spare electric stock standing around idle that could be drafted in. So if the diesel stock would need replacing, why not replace it with battery/3rd rail bimodes? This would save having to do any electrification work. Okay, the stock wouldn't be interchangeable with stock running on the other lines, but then the existing stock isn't.
Are you suggesting a lower voltage AC standard? I don’t think the voltage is a major cost element, the pylons are.If the overriding priority is to retire diesel-powered trains, then you could take a view that only providing sufficient electrical power to match the diesel performance is OK - after all, existing 3rd rail trains are power-limited below what is possible on 25kV overhead, so no particular reason why you couldn't have a lower 'diesel performance equivalent' power limit if you wanted (and if it reduced the electrification cost).
That's not how the legal framework in the UK works
On top of that, injuries and fatalities aren't just from tresspassers, unfortunately railway staff get hurt (and die) too. And then there are rare incidents of people ending up in a place where they shouldn't be unintentionally (e.g. falling of a platform).
3rd rail is much more dangerous than OHLE or batteries, so it is entirely reasonable to ban new 3rd rail, and use battery or OHLE to electrify the remaining routes instead.
TfL has an exemption, apparently because they came up with a set of working practices that significantly reduced risk to their staff, and reduced the likelihood of tresspass, and that's why TfL can still extend their 4th rail system where it makes sense to do so
25kV AC overhead electrification is also dangerous. Diesel engine exhaust emissions are also toxic. As a rail passenger I have never been at risk from 750V DC third rail or 25kV AC overhead electrification but I have been forced to breath in diesel engine exhaust emissions from trains waiting at the platform.That's not how the legal framework in the UK works
On top of that, injuries and fatalities aren't just from tresspassers, unfortunately railway staff get hurt (and die) too. And then there are rare incidents of people ending up in a place where they shouldn't be unintentionally (e.g. falling of a platform).
3rd rail is much more dangerous than OHLE or batteries, so it is entirely reasonable to ban new 3rd rail, and use battery or OHLE to electrify the remaining routes instead.
TfL has an exemption, apparently because they came up with a set of working practices that significantly reduced risk to their staff, and reduced the likelihood of tresspass, and that's why TfL can still extend their 4th rail system where it makes sense to do so
![]()
Northamptonshire pupils taught about new overhead electric wires
Network Rail says 25,000 volts would soon be running through 22 miles of newly-installed wiring.www.bbc.co.uk
![]()
Harrison Ballantyne: Mum of electrocuted boy in railway danger plea
Harrison Ballantyne died six years ago after he went into a freight terminal to get a football.www.bbc.co.uk
Not easily, there isn't a blanket exemption for TfL and each case needs to be assessed individually on its own merits. The lack of live working potentially could be replicated by NR. The separation from members of the public is much harder, even after closing the numerous footpath/level crossings access is much easier than underground tunnels.Couldn't NR come up with similar working practices ?
Not easily, there isn't a blanket exemption for TfL and each case needs to be assessed individually on its own merits. The lack of live working potentially could be replicated by NR. The separation from members of the public is much harder, even after closing the numerous footpath/level crossings access is much easier than underground tunnels.
There was a period when the 313s switched voltage at least twice between Richmond and North Woolwich. Didn't seem to cause a problem. Admittedly Reading to Redhill would be four switches. Regarding EMUs, there will soon be lots of spare 350s. Not sure if they are dual voltage already but a cascade involving 350/1 or 387s might be an option.I could see an argument for electrifying to Uckfield with 25kV, as there would only be one interface to the third rail. Also the signalling there is SSI, which should already be AC immune, or easily made so. And it could use bimode AC/DC trains, as already used on Thameslink (perhaps even make Uckfield a Thameslink route?)
Agreed that short infills on the North Downs with 25kV would not make sense (and could have some technical challenges too!). However, the line currently runs with diesel stock that would need replacing if the gaps were electrified, as AFAIAA there aren't sufficient spare electric stock standing around idle that could be drafted in.
No, just the train's traction control system limiting the maximum current/power drawn from the OHLE, as already happens in 3rd rail land with modern dual-voltage trains e.g. see this thread - https://www.railforums.co.uk/threads/current-limit-index.238610/Are you suggesting a lower voltage AC standard? I don’t think the voltage is a major cost element, the pylons are.
Sure, I'd imagine no level crossings and the network being fully fenced to a good standard would be the main ones. London Underground is lower voltage (420V and -210V on the return) though it can be argued that 420V vs 750V doesn't matter as both would kill you.Couldn't NR come up with similar working practices ?
Quite - even 'domestic' 230V AC mains (that's a peak voltage of 325V - 230V is the 'RMS' voltage) is quite capable of killing people.London Underground is lower voltage (420V and -210V on the return) though it can be argued that 420V vs 750V doesn't matter as both would kill you.