Very long term absentees 67017 and 67010 should be heading back to TfW in the Next day or two after testing. 010 is planned to be on HD06 whilst it undergoes an exam and 017 should head to Canton to act as recovery loco. In the meantime, 67023 will be hired from Colas and used as the recovery loco and based in the Shrewsbury area to cover both ends of the network.
Set wise, HD05 is now back from Crewe ETD after tyre turning and is undergoing final testing and finishing before heading back out as the final 5 car. HD06 is now in for its heavy exam and should be the final set to have its SV mods with improved ventilation and air con in the kitchen vehicle. As 06 and 05 are now both on exam at Crewe, until 05 is released, HD02 is now temporarily stored at Holyhead.
As HD02 is now stored, 1V91 from Holyhead will be a unit tomorrow with 67014+HD01 planned to pick up the diagram from the 10:52 Cardiff to Manchester
Edit- it will now work the 08:49 from Cardiff replacing 67020+HD04 which failed earlier with low power caused by a faulty traction motor.