Project Oval: TfL win DfT contract to expand contactless system to 233 rail stations by May 2024, Railcards coming to contactless payment cards

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,176
Location
Ashford Middx
What an absolute clown show. Ridiculous it takes this long - I guess they are already benefiting from the increased revenue so no rush to introduce the customer convenience aspect of the project.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,277
Location
Bolton
What an absolute clown show. Ridiculous it takes this long - I guess they are already benefiting from the increased revenue so no rush to introduce the customer convenience aspect of the project.
I wouldn't be too shocked to find it delayed again beyond September to be honest.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,650
Good question, thread title implies will happen no later than 4 days time (by end of May 2024)
That was referring to the original scheduled completion of phase two, but phase one hasn't been implemented yet. I think there was originally intended to be around 18 months between the two phases, so it's still a long way off.
 

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,455
Location
London
With the Election having been called, there's unlikely to be an announcement from DfT - and likely the same for TfL - due to purdah rules.
 

MikeWh

Established Member
Associate Staff
Senior Fares Advisor
Joined
15 Jun 2010
Messages
8,567
Location
Crayford
If data has been set up in the system ready for Sunday week then it'll happen anyway, unless every change being made gets canned.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,330
If data has been set up in the system ready for Sunday week then it'll happen anyway, unless every change being made gets canned.
Do you think there is a possibility it has been set up in the system?
 

MikeWh

Established Member
Associate Staff
Senior Fares Advisor
Joined
15 Jun 2010
Messages
8,567
Location
Crayford
Do you think it has been set up in the system?
I don't know. Cubic's lead time is longer than 2.5 weeks. The DfT are famed for not announcing things until the week before. I guess there could be an instruction not to switch on any of the validators, unless they are already used for TOC smartcards?

There were some fares changes left in the system for a couple of years when the Liz line opening was shelved at the last minute.
 

Fazaar1889

Member
Joined
5 Oct 2022
Messages
629
Location
South East
What actually makes it super difficult to roll out? In Guildford, there's the yellow pads. Can't you just like...add Guildford to the list. The yellow pads detect cards surely...
 

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,455
Location
London
What actually makes it super difficult to roll out? In Guildford, there's the yellow pads. Can't you just like...add Guildford to the list. The yellow pads detect cards surely...
At a guess, some sort of issue between the railway fares database and TfL and/or Cubic.

This is purely based on the presumed PAYG fares having started to appear on BRFares (which I appreciate isn't an official source) in June last year.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,650
Today's the day! Fingers crossed.
You can uncross your fingers, as nothing will be happening today. Post #867 on this thread states that implementation of phase 1 is delayed until summer 2024 at the earliest.
 

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,128
Location
Selhurst
You can uncross your fingers, as nothing will be happening today. Post #867 on this thread states that implementation of phase 1 is delayed until summer 2024 at the earliest.
Maybe tomorrow then :lol:
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,650
Maybe tomorrow then :lol:
No, and I am comfortable in asserting not in the next month. The thread title having a date is meaningless as the thread has noted several times that the date would be drifting.
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,500
Ticketing and Revenue Update 152 (April 2024) extracts below.

Page 5:
We still await final confirmation of the implementation of the phase 1 of Project Oval, which will see the extension of contactless payment for PAYG journeys to around 51 [sic] stations beyond the current zonal area. The first phase was originally scheduled to be delivered in December 2023, but has been delayed and now cannot be implemented before the June Fares Revision.
Said fares revision is scheduled for 9 June, on which some Oval work (quoted below) will also take place.

Page 3:
In preparation for delivery of the second and third stages of Project Oval later this year, Cubic will be adding base data for a further batch of stations planned to be covered within Phases 2A and 2B of the project.
So it appears Phase 2 will be split as noted above, though which stations go where is unknown. Not a surprise in light of how quick the implementation of Phase 1 hasn't been to date, but do they seriously believe all 233 (at present) stations will be sorted before next year? I can't see it.
 

etr221

Established Member
Joined
10 Mar 2018
Messages
1,596
So it appears Phase 2 will be split as noted above, though which stations go where is unknown. Not a surprise in light of how quick the implementation of Phase 1 hasn't been to date, but do they seriously believe all 233 (at present) stations will be sorted before next year? I can't see it.
Has a list of the 233 been published somewhere, that I have missed, and which someone could point me to?
 

MrJeeves

Established Member
Associate Staff
Senior Fares Advisor
Joined
28 Aug 2015
Messages
4,671
Location
Burgess Hill
Has a list of the 233 been published somewhere, that I have missed, and which someone could point me to?
I put an overlay onto a Project Mapping map earlier in this thread in post 743.


Blue is existing PAYG network, with green being Phase 1 and yellow being Phase 2. I don't think a list or map split into 2a/2b has been released.

Seeing the "missed areas" is interesting. I note that the bits between Wivelsfield/Brighton and Lewes aren't included, while this is a permitted route from some stations within the zone to Brighton. Likewise, when the BML is closed and GTR run services to London via Littlehampton, things could prove interesting. Then again, these same issues already exist in the current PAYG system, such as Gatwick to Reading which could be made via the North Downs Line, but PAYG is only possible via London at present. I imagine that, in reality, staff will (hopefully) react with pragmatism. Either way, equalising PAYG and normal ticket prices within Oval should mean this isn't a huge problem.
 