• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Ideas for improving the CrossCountry timetable

Status
Not open for further replies.

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,330
The four InterCity routes would be:

Newcastle to Reading (via Doncaster)
York to Bristol Temple Meads (via Leeds)
Manchester to Plymouth
Manchester to Bournemouth
So Newcastle to Leeds goes down from 3 tph pre-pandemic (Liverpool, Manchester Airport, Plymouth) to just the Liverpool services?

I know compromises have to be made – ideally, I'd do all phases of HS2, plus a new Birmingham–Bristol–Cardiff line – but between existing cuts and Edinburgh to Leeds and Sheffield being ~68,000 passengers per year, that seems like a bad deal for the North East.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Tayway

Member
Joined
17 May 2021
Messages
211
Location
Scotland
So Newcastle to Leeds goes down from 3 tph pre-pandemic (Liverpool, Manchester Airport, Plymouth) to just the Liverpool services?

I know compromises have to be made – ideally, I'd do all phases of HS2, plus a new Birmingham–Bristol–Cardiff line – but between existing cuts and Edinburgh to Leeds and Sheffield being ~68,000 passengers per year, that seems like a bad deal for the North East.
My proposed Edinburgh to Nottingham service would make 2tph from Newcastle to Leeds when combined with the TPE.
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,330
My proposed Edinburgh to Nottingham service would make 2tph from Newcastle to Leeds when combined with the TPE.
Ah. Losing direct services to Cheltenham and beyond would still be slightly annoying, but as long as Birmingham isn't cut and with 2 tph for Leeds that's more understandable (and Newcastle to Nottingham's far less time-competitive via London than Newcastle to Bristol / Devon).
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,641
For History I'd recommend http://www.1s76.com/.

However, back on topic, reintroducing services to Kent and Sussex would be a clear detriment to XC's ability to offer reliable trains of an appropriate length as they'd have stock tied up between stopping trains on intensely worked routes.
This site is incredible - thanks for sharing.
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
255
So Newcastle to Leeds goes down from 3 tph pre-pandemic (Liverpool, Manchester Airport, Plymouth) to just the Liverpool services?

I know compromises have to be made – ideally, I'd do all phases of HS2, plus a new Birmingham–Bristol–Cardiff line – but between existing cuts and Edinburgh to Leeds and Sheffield being ~68,000 passengers per year, that seems like a bad deal for the North East.
Here's another thought, Bristol-Newcastle could be just over 4 hours if it went via Doncaster, which is the ideal journey time for long distance.
Maybe a stop at Meadowhall or the new Rotherham station would provide connections to Leeds? Also, if the Reading service terminates at York maybe a York-Newcastle local could be run, enabling TPE to cut stops? So, here's an idea:

CrossCountry
1tph Bristol TM, Parkway, Cheltenham, New St, Derby, Sheffield, maybe Meadowhall/Rotherham, Doncaster, York, Darlington, Newcastle, Berwick, Edinburgh
1tph Reading, Oxford, Banbury, Leamington, (Coventry, International), New St, Tamworth/Burton-upon-Trent, Derby, Sheffield, Wakefield, Leeds, York

Transpennine
1tph Liverpool Lime St, stations to Leeds then York, Darlington, Durham, Newcastle, Morpeth/Alnmouth, Berwick, Dunbar, Edinburgh
1tph Manchester Picc, stations to Leeds then York, Darlington, Durham, Newcastle

Either Transpennine or Northern
1tph Thirsk, Northallerton, Darlington, Durham, Chester-le-Street, Newcastle
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,687
Here's another thought, Bristol-Newcastle could be just over 4 hours if it went via Doncaster, which is the ideal journey time for long distance.
Maybe a stop at Meadowhall or the new Rotherham station would provide connections to Leeds? Also, if the Reading service terminates at York maybe a York-Newcastle local could be run, enabling TPE to cut stops? So, here's an idea:

1tph Bristol TM, Parkway, Cheltenham, New St, Derby, Sheffield, maybe Meadowhall/Rotherham, Doncaster, York, Darlington, Newcastle, Berwick, Edinburgh
1tph Reading, Oxford, Banbury, Leamington, (Coventry, International), New St, Burton-upon-Trent, Derby, Sheffield, Wakefield, Leeds, York
For Leeds-Newcastle/Edinburgh
1tph Liverpool Lime St, stations to Leeds then York, Darlington, Durham, Newcastle, Morpeth/Alnmouth, Berwick, Dunbar, Edinburgh
1tph Manchester Picc, stations to Leeds then York, Darlington, Durham, Newcastle
Then:
1tph Thirsk, Northallerton, Darlington, Durham, Chester-le-Street, Newcastle
Tamworth and Chesterfield lose their long distance XC services completely? The SW to NE needs to be Leeds, not Reading Newcastle.
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
255
Is it possible for the intercity services to become more like the other long-distance operators, namely LNER and Avanti West Coast where trains do more skip-stop running? The services I have in mind are the Manchester, North East and Nottingham ones. Also, how could reductions in journey times be achieved with the current infrastructure and rolling stock?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,687
Is it possible for the intercity services to become more like the other long-distance operators, namely LNER and Avanti West Coast where trains do more skip-stop running? The services I have in mind are the Manchester, North East and Nottingham ones. Also, how could reductions in journey times be achieved with the current infrastructure and rolling stock?
Not to a great extent, XC interacts with so many routes that any time you save just ends up at a major station or hanging about somewhere.
 

Mogz

On Moderation
Joined
20 May 2019
Messages
636
How about reconnecting a few major destinations to the XC network?

Swapping a couple of Bournemouth-Manchester trains to terminate at Liverpool with the quid pro quo that some Birmingham-Liverpool LNWR trains go to Manchester instead, for example?
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,330
How about reconnecting a few major destinations to the XC network?

Swapping a couple of Bournemouth-Manchester trains to terminate at Liverpool with the quid pro quo that some Birmingham-Liverpool LNWR trains go to Manchester instead, for example?
I think that would have been best done with HS2 or with four through platforms at Piccadilly and some services going Dorset / Devon – Birmingham – Stoke – Manchester – Liverpool. I think it's better to have a regular pattern, so with current infrastructure prioritising connections at Stafford / Wolverhampton. It's only really the extremities of very long distance services (e.g. Edinburgh – Aberdeen and Plymouth – Penzance on CrossCountry and London services) that I can see the benefit of alternating destinations.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,641
One thing occasionally mentioned is extending / connecting a Euston-Birmingham (pendo) into a Liverpool or a Manchester path. Does anything line up well?

Liverpool would be preferable, as those start at New St and ideally would run through. But wired options are very limited (e.g. Leicester might work ok, if wired) - and if you get back to say, Northampton - you're into the LNWR merger territory again, which was too delay prone. Or International can try do 1tph, Coventry doesn't have the platforms.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,687
One thing occasionally mentioned is extending / connecting a Euston-Birmingham (pendo) into a Liverpool or a Manchester path. Does anything line up well?

Liverpool would be preferable, as those start at New St and ideally would run through. But wired options are very limited (e.g. Leicester might work ok, if wired) - and if you get back to say, Northampton - you're into the LNWR merger territory again, which was too delay prone. Or International can try do 1tph, Coventry doesn't have the platforms.
You aren't stopping a Pendo at the likes of Penkridge etc though. Birmingham International isnt that flush with platforms with three terminators an hour either.
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
255
Maybe there needs to be a general rethink of where XC should serve and how it should serve those places? If there was more electrification then maybe the New St-Edinburgh via WCML service could be transferred to XC? However, obviously there's a lot more than just electrification. How fast were the trains/journey times under Virgin CrossCountry? Surely there must've been an effort to speed up journeys when the Voyagers were introduced?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,274
Also, if the Reading service terminates at York maybe a York-Newcastle local could be run, enabling TPE to cut stops? So, here's an idea:
The reason given, (as per the ECML Dec 2024 discussion), for some of the June 2025 reinstated Reading to Newcastle services being cut back to York is that there is no track capacity available for them north of York. If that’s correct, and there’s no reason to doubt it, there‘ll presumably also be no room for a stopper, which will get in the way of the faster services anyway. They were trying for ages to run a Middlesborough to Newcastle service via Darlington and Durham, even that couldn’t be pathed amongst the current services so has to run via Sunderland.

I suggest the idea of using stoppers to enable faster long distance services to skip calls is probably impossible on the two track railway between Northallerton and Edinburgh.
 

Jason White

Member
Joined
31 Oct 2023
Messages
10
Location
Worcester
XC have repeatedly stated a preference to run all their Bournemouth and Reading services via Coventry to target the airport market.

The proposal (consulted on a few years ago) to run more trains to Exeter required the extensions to Paignton to be dropped.

AIUI from previous discussions XC had made it clear they had no intention of calling long distance services at Worcester Parkway.

XC have repeatedly stated a preference to run all their Bournemouth and Reading services via Coventry to target the airport market.

The proposal (consulted on a few years ago) to run more trains to Exeter required the extensions to Paignton to be dropped.

AIUI from previous discussions XC had made it clear they had no intention of calling long distance services at Worcester Parkway.

== Doublepost prevention - post automatically merged: ==

Long distance voyagers stopping at Worcestershire Parkway from May 2025.
 

Attachments

  • Screenshot_20240623_064039_Email.jpg
    Screenshot_20240623_064039_Email.jpg
    54.2 KB · Views: 64
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,140
Location
West Wiltshire
I think that would have been best done with HS2 or with four through platforms at Piccadilly and some services going Dorset / Devon – Birmingham – Stoke – Manchester – Liverpool. I think it's better to have a regular pattern, so with current infrastructure prioritising connections at Stafford / Wolverhampton. It's only really the extremities of very long distance services (e.g. Edinburgh – Aberdeen and Plymouth – Penzance on CrossCountry and London services) that I can see the benefit of alternating destinations.
If going to alternate destinations then XC would be able to sort out the mess that is the Birmingham-Cheltenham core section, where all trains going to South Wales are those from Nottingham and East etc, and those to South West tend to be to/from North East.

Anyone trying to do other combination eg SouthWales to North East has lousy connections and No through trains. Clearly customer convenience (which XC through journeys used to be about), comes second to operational (keeping 170 and 22x fleet separate)

But then in logical world HS2 would have had its eastern section to Toton and onwards towards Yorkshire, a south western spur would have been built alongside M42 and M5 towards Cheltenham. The third or 4th track (the WW2 quadrupling) would have been reinstated towards Gloucester/Stonehouse, and XC would operate a proper high speed X shaped network.
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
255
If going to alternate destinations then XC would be able to sort out the mess that is the Birmingham-Cheltenham core section, where all trains going to South Wales are those from Nottingham and East etc, and those to South West tend to be to/from North East.

Anyone trying to do other combination eg SouthWales to North East has lousy connections and No through trains. Clearly customer convenience (which XC through journeys used to be about), comes second to operational (keeping 170 and 22x fleet separate)

But then in logical world HS2 would have had its eastern section to Toton and onwards towards Yorkshire, a south western spur would have been built alongside M42 and M5 towards Cheltenham. The third or 4th track (the WW2 quadrupling) would have been reinstated towards Gloucester/Stonehouse, and XC would operate a proper high speed X shaped network.
That's a good point, didn't think about that. Maybe if XC acquired the 222s then all services on the Birmingham-Derby-Sheffield/Nottingham corridor could be run by 22x while all the 170s could be concentrated on the Leicester services? Alternatively, instead of the Nottingham services picking up all stops between Birmingham and Derby, how about a fast and slow service from Birmingham to Nottingham and a fast and slow service from Birmingham to Leeds? I think XC shouldn't be the Cinderella of the intercity routes anymore
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,687

== Doublepost prevention - post automatically merged: ==

Long distance voyagers stopping at Worcestershire Parkway from May 2025.
Its a few Bristol Manchesters, not all of them and no SW NE services as far as I know.
 

MontyP

Member
Joined
18 Nov 2015
Messages
538
My proposed Edinburgh to Nottingham service would make 2tph from Newcastle to Leeds when combined with the TPE.
I do like the idea of a Nottingham-Sheffield-Leeds-Newcastle-Edinburgh service, would obviously need new stock such as 8xx bi-modes. Extend it to Glasgow and run it hourly, it would provide a lot of direct links that are constantly proposed on this forum. If it partly replaced the XC north of Newcastle, the only big direct flows that would be lost would be between Edinburgh and points south of Birmingham i.e. Bristol, Exeter and Plymouth.

I'm not sure why you are proposing terminating the NE/SW at Bristol and extending the Manc-Bristol to Plymouth instead? There has been a largely hourly service from Leeds to Plymouth for 30 years, and even back in the less frequent days of the 70s/80s, more Plymouth services originated in the NE than NW. I don't know whether this is based on volume of flows or operational convenience.
 

Jason White

Member
Joined
31 Oct 2023
Messages
10
Location
Worcester
It's a shame, as Cheltenham Spa to Worcestershire Parkway is a very annoying component of a SW to Cotswolds journey.
I agree. Let's hope that whoever gets into Government has the intelligence to give people what they actually want. But don't hold your breath on that!
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,833
Location
Cambridge
It seems like dividing/attaching units mid-route isn't effective, so here is my revised idea:

Manchester-Bournemouth
Keep the hourly service, but run via Solihull (except for 3tpd), as Avanti already has links from Birmingham Intl/Coventry to Manchester calling at all of XC's stations, apart from Macclesfield.
That’s the most incorrect statement I’ve seen on this forum in a long time. Wolverhampton and Stafford are the only two destinations that Avanti shares with CrossCountry’s Manchester Bournemouth route from Birmingham. Birmingham International and Coventry would lose all services to Stoke, Stockport, Manchester, Banbury, Oxford, Reading, Basingstoke, Winchester, Southampton and Bournemouth.
 

greataj

Member
Joined
22 Jul 2024
Messages
53
Location
Essex
As further to one of the point earlier in this thread to increasing Birmingham-Peterborough services. Could an extension to the Birmingham-Leicester service warrent this, whilst moving the Melton Mowbray, Oakham and Stamford calls to that service rather than Cambridge/Stansted trains. A few benefits I could see to this:
- Birmingham, Nuneaton and Leicester to Peterborough increase from 1 to 2 tph.
- Faster journey times from Birmingham, Nuneaton and Leicester to Peterborough, Ely and Cambridge/Stansted on the existing service (with Melton Mowbray, Oakham and Stamford stops moved to a Birmingham-Leicester service Peterborough extension).
- Better regional connectivity across the East Midlands with Melton Mowbray, Oakham and Stamford as direct links from Hinckley, Narborough and South Wigston without the need to change at Leicester. Will also give the latter three stations a regular, faster direct link to the ECML.

I suspect you could acheive this broadly in line with the current timetable. Given the approx. 7-8 minute saving you get on Leicester-Nuneaton services by omitting the South Wigston, Narborough and Hinckley calls along that route, you theoretically should acheive a similar saving on the Leicester-Peterborough section by omitting the three station calls there on the existing service.

Collectively you'd close a gap of about 15 minutes between a Birmingham-Peterborough all stations service and what would be a semi-fast Birmingham-Peterborough calling only at Coleshill, Nuneaton and Leicester before continuing as now to Cambridge/Stansted. If you kept the current timetable at Birmingham that would still allow Melton Mowbray, Oakham and Stamford passengers to easily change at Peterborough with an approx. 10-15 minute connection time to the Cambridge/Stansted service and vice versa. The only issue you'd have as far as I could see is a terminating XC Class 170 at Peterborough with potentially a fairly reasonable layover time and how that would fit around the EMR Norwich services.
 

Manutd1999

Member
Joined
21 Feb 2021
Messages
549
Location
UK
As further to one of the point earlier in this thread to increasing Birmingham-Peterborough services. Could an extension to the Birmingham-Leicester service warrent this, whilst moving the Melton Mowbray, Oakham and Stamford calls to that service rather than Cambridge/Stansted trains. A few benefits I could see to this:
- Birmingham, Nuneaton and Leicester to Peterborough increase from 1 to 2 tph.
- Faster journey times from Birmingham, Nuneaton and Leicester to Peterborough, Ely and Cambridge/Stansted on the existing service (with Melton Mowbray, Oakham and Stamford stops moved to a Birmingham-Leicester service Peterborough extension).
- Better regional connectivity across the East Midlands with Melton Mowbray, Oakham and Stamford as direct links from Hinckley, Narborough and South Wigston without the need to change at Leicester. Will also give the latter three stations a regular, faster direct link to the ECML.

I suspect you could acheive this broadly in line with the current timetable. Given the approx. 7-8 minute saving you get on Leicester-Nuneaton services by omitting the South Wigston, Narborough and Hinckley calls along that route, you theoretically should acheive a similar saving on the Leicester-Peterborough section by omitting the three station calls there on the existing service.

Collectively you'd close a gap of about 15 minutes between a Birmingham-Peterborough all stations service and what would be a semi-fast Birmingham-Peterborough calling only at Coleshill, Nuneaton and Leicester before continuing as now to Cambridge/Stansted. If you kept the current timetable at Birmingham that would still allow Melton Mowbray, Oakham and Stamford passengers to easily change at Peterborough with an approx. 10-15 minute connection time to the Cambridge/Stansted service and vice versa. The only issue you'd have as far as I could see is a terminating XC Class 170 at Peterborough with potentially a fairly reasonable layover time and how that would fit around the EMR Norwich services.
2ph to Peterborough seems like an obvious extension, not sure why it's not been done tbh. My plan would be 2ph Birmingham-Peterborough, with one extending to Stanstead and the other to Norwich.I believe that did used to happen back in history?

Not sure a semi-fast/stopper combination is preferable, maybe it's best to share the stops between both services, allowing some intermediate calls to get 2ph and providing a similar journey time every 30 mins?
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,390
Location
Somerset
It's a shame, as Cheltenham Spa to Worcestershire Parkway is a very annoying component of a SW to Cotswolds journey.
There are lots of potential journeys along that corridor that are torpedoed by the lack of a Bristol - Birmingham “Regional Express” service, which would also help free up space on XC for “real” long distance passengers.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,333
My plan would be 2ph Birmingham-Peterborough, with one extending to Stanstead and the other to Norwich.I believe that did used to happen back in history?
Some Birmingham trains used to go to Norwich and some Manchester trains used to go to Cambridge, but Birmingham to Peterborough was never 2tph to achieve that.
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
255
There are lots of potential journeys along that corridor that are torpedoed by the lack of a Bristol - Birmingham “Regional Express” service, which would also help free up space on XC for “real” long distance passengers.
Could mean Edinburgh to Plymouth and possibly Manchester to Bristol services could skip Cheltenham and Worcestershire Parkway? How about making the Cardiff-Plymouth more frequent and enable XC to lose a few other stops like Tiv Parkway and Totnes?
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,870
Location
East Anglia
Some Birmingham trains used to go to Norwich and some Manchester trains used to go to Cambridge, but Birmingham to Peterborough was never 2tph to achieve that.
During the middle of the day at the launch of the 1988 Express timetable Norwich-Birmingham services only called Thetford, Ely, Peterborough, Leicester & Nuneaton. Stamford, Oakham & Melton had 2-hourly calls by Ipswich/Cambridge services.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,867
Being able to run their full timetable would be a good start, never mind extensions. They're introducing a temporary timetable from the 10th of August so they don't have so many cancellations on the day.
This is resulting in things like Oxford to Banbury has nothing from XC between 16:40 and 18:12. So peak commuting time is left to GWR's Turbos that stop everywhere.
 
Status
Not open for further replies.

Top