Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
This starts at post 1815 in this thread which refers to statement at a TFN board meeting that 805s will be running on diesel north of Crewe due to power limitations on the WCML preventing 807s running on overhead power.
I assume that there is a difference between what test trains are allowed to do and regular hourly scheduled services.
== Doublepost prevention - post automatically merged: ==
Extract from Minutes of TfN Board Meeting on 20/3/24
4.17 On paragraph 5.8 of the report relating to the second service to Liverpool operating in diesel mode between Crewe to Liverpool, Cllr Corcoran asked what is being done to address restore the power supply issues between Crewe and Liverpool, which trains will be used to provide the second Liverpool service and where they will originate from. Additionally, he sought reassurance that there will be no restrictions on the Crewe to Chester route.
4.18 In response to Members’ questions and comments, Mr Montgomery addressed a number of issues. Regarding the second Liverpool service he stated he is aware of the impact on the economy of current poor performance and believes that services will improve in the area. He recognised the importance of rectifying the issues with the current hourly service before considering a second train. He said the new trains to be used are “bi modes” (a mix of diesel and electric) with the diesel element used in areas where the lines are not electrified/power supply is limited.
There aren't really, it will result in delays restarting a full North Wales service or short formations on these (though remember 5.805 has substantially more capacity than 5.221 despite the higher comfort level).
And if it takes as long as the one that they're supposed to be doing north of Newcastle, then these new trains will be ready for midlife refurbishment by the time it's actually switched on
And if it takes as long as the one that they're supposed to be doing north of Newcastle, then these new trains will be ready for midlife refurbishment by the time it's actually switched on
There aren't really, it will result in delays restarting a full North Wales service or short formations on these (though remember 5.805 has substantially more capacity than 5.221 despite the higher comfort level).
One service per day (1D83 0902 London Euston to Holyhead and the return service 1A62 1448 Holyhead to London Euston) is normally 5+5 all the way (today was an exception as it was cancelled between Euston and Crewe and ran as a single unit).
One service per day (1D83 0902 London Euston to Holyhead and the return service 1A62 1448 Holyhead to London Euston) is normally 5+5 all the way (today was an exception as it was cancelled between Euston and Crewe and ran as a single unit).
A double set works ECS from Central Rivers to form the 0920 Chester-Euston.
The early Holyhead-Euston (0732 from Chester) doubles up there with the Wrexham portion.
Wonder if they might run some 807s Euston - Crewe and Some 805 shuttles from Crewe to North Wales, Liverpool, Blackpool ?
Other possibility is some if the Scottish semi fasts that currently run Euston - Birmingham - Scotland. I think historically done of these were separate trains which connected in West Midlands. Might use 807s for the southern part of some of the services. Might release some pendolino capacity for Liverpool but I think the Scottish ones are nearly all 11 car Pendolino so a 7 car 807 would have significantly less capacity.
I don't think these options are likely but are possible. Best action would be to focus on getting the power upgraded.
( Could also hold onto some of the Voyagers but I can imagine there are a load of contractual liabilities involved with that and supporting an additional train type for an extended period could be complex operationally.)
Don't the North Wales services mostly only stop in Crewe, Stafford and Euston south of Crewe? It should fit at all three of those - exactly at Stafford, more spaciously at Crewe and Euston
an 805+807 is 312 metres long, so any station with platforms at least that length should fit the combination
Don't the North Wales services mostly only stop in Crewe, Stafford and Euston south of Crewe? It should fit at all three of those - exactly at Stafford, more spaciously at Crewe and Euston
an 805+807 is 312 metres long, so any station with platforms at least that length should fit the combination
There are not plans to run them this way and no 12 car stop markers have been measured because like I said hardly any stations can accommodate the length of train including most platforms at Euston.
Don't the North Wales services mostly only stop in Crewe, Stafford and Euston south of Crewe? It should fit at all three of those - exactly at Stafford, more spaciously at Crewe and Euston
an 805+807 is 312 metres long, so any station with platforms at least that length should fit the combination
Just checked on RTT and - for example - Monday to Friday two of the five Euston->Holyhead services stop at Tamworth and Lichfield.
Neither of them are 312m, I make them about 295m (Tamworth) and 270m (Lichfield) maximum from Google Earth, so the official usable length is probably a bit less.
Just checked on RTT and - for example - Monday to Friday two of the five Euston->Holyhead services stop at Tamworth and Lichfield.
Neither of them are 312m, I make them about 295m (Tamworth) and 270m (Lichfield) maximum from Google Earth, so the official usable length is probably a bit less.
A double set works ECS from Central Rivers to form the 0920 Chester-Euston.
The early Holyhead-Euston (0732 from Chester) doubles up there with the Wrexham portion.
With these new trains going to Oxley it would handy to have the link to the northbound WCML electrified…..
I know the 805s can use diesel but the 807s can’t if they need to get between Oxley and Liverpool.
I find it frankly shambolic that a set of 10 electric trains were ordered partly for the second Liverpool service, and yet because of the need for a power upgrade they won't be going north of Crewe.
The 805s won't have enough capacity, without running double, and they're needed for North Wales services
So what I assume this means is that there will be a surplus of 807s for the Birmingham semi-fast services and no extra Pendolinos for the second Liverpool service, which is almost like the worst of both worlds.
1D83 0902 Euston-Holyhead on June 12 seems to be pathed as 80x (2x805 until Crewe), the AWC website seat map has 805 graphics and no Advance are available tickets as well.
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.