Spotted this poster in Manchester Victoria (on Platform 4), first non-digital publicity I've seen about the closure.
Changes to train times
From Sunday 2 June until late 2024*
Ince station will be TEMPORARILY CLOSED
- no trains will stop
This is due to major electrification upgrade works on the bridge adjacent to Ince station
Planning your journey
During this time, customers are advised to travel via Wigan Wallgate or Hindley stations
Purchasing a ticket
If you need to purchase a ticket, you can do so online or via the Northern app, as the ticket vending machine at Ince station will also be temporarily unavaliable.
3 QR codes are visible which would open the walking route from Wigan/Hindley to Ince, and one for the local bus service.
This may not be news for locals, but there is a length of earth wire up on the westbound line east of Wigan Stn Jn.
There are also 49 masts up towards Hindley, all with cantilevers attached.
Then after Crow Nest Jn there are 41 bases before Westhoughton, and another 21 before Lostock Jn.
Didn't get to see the eastbound line.
Great progress!
This may not be news for locals, but there is a length of earth wire up on the westbound line east of Wigan Stn Jn.
There are also 49 masts up towards Hindley, all with cantilevers attached.
Then after Crow Nest Jn there are 41 bases before Westhoughton, and another 21 before Lostock Jn.
Didn't get to see the eastbound line.
Great progress!
Went through on Friday, and whilst I didn't count the numbers, there appears to be similar progress on the eastbound. The masts have had their cantilevers attached quite recently.
No masts or piles in the vicinity of Ince station for probably 150 yards either side of the station, and no severe cutting back of the undergrowth around there (unlike the near razing of the undergrowth from by the west side of the A577 up to and well past Crow Nest). This is not surprising considering the reconstruction of the road bridge over Ince station. Construction of temporary footbridge over the line at Ince station seemed well advanced and was being worked on as I went past.
This may not be news for locals, but there is a length of earth wire up on the westbound line east of Wigan Stn Jn.
There are also 49 masts up towards Hindley, all with cantilevers attached.
Then after Crow Nest Jn there are 41 bases before Westhoughton, and another 21 before Lostock Jn.
Didn't get to see the eastbound line.
Great progress!
It was mentioned in a recent Branch Line Society newsletter that it is necessary to replace both the road overbridge and the footbridge (the only access points to Ince station) before electrification work can begin, hence the temporary closure
What's going on with that red footbridge near Hindley? Also Westhoughton station needs work done to it aswell. Unless a station closure there is happening too?
What's going on with that red footbridge near Hindley? Also Westhoughton station needs work done to it aswell. Unless a station closure there is happening too?
Deep Pit Footbridge (AKA Hindley Ironbridge) was scheduled to be removed but was made a grade 2 listed structure, so it will survive albeit with some modifications.. to be jacked up & raised by 1mtr etc.
It would appear though that NR are looking to completely remove the original south lattice approach ramp & replace it with a brand new one despite it being listed & also an extensive part of the original structure.
On the northern side it would appear that NR also plan to add & include a non matching non sympathetic approach ramp (links to planning permission applications/technical drawings & proposals etc)..
== Doublepost prevention - post automatically merged: ==
Also there's an update on Higher Barn Lane overbridge (at Crow Nest Junction) that I saw today (06/05/24) there's a couple of sheets of paper fixed to a fence adjacent to the bridge giving notice relating to a temporary closure & diversion of the footpath (& I'm presuming closure of the road also?).
I think that the footpath diversion goes from the A58 (Castle Hill Road) via Hindley Mill Lane, through the tunnel under the railway that's alongside Borsdane Brook, then taking a sharp right to get back to the footpath via Higher Barn Farm to connect with the footpath on the northern side of the bridge.
The closure to commence on the 28th May 2024 for a period of approximately six months to enable works to be carried out etc etc etc.
If I get chance to get to back up there I'll try & get some photos etc.
Incredibly proud of the team. At 0014 on Tuesday 7th May seen the SPL Team succesfully Section Proved the OLE Tie in at Wigan on the Wigan to Bolton Electrification scheme. 3no Contact/Catenary runs, 5no PES’s, 2no SI’s and associated works, all works completed on time and most importantly no...
www.linkedin.com
The Tie-In area near Wigan NW has been installed and section-proved.
So basically, marrying 1973 vintage WCML north of Weaver Junction electrification to the Wigan-Bolton section even though that is not complete just yet.
Likely Avanti as the project includes 390 gauge clearance. Of course, an improvement on the Preston route as a diversion for Avanti as Wigan NW can still be served
Likely Avanti as the project includes 390 gauge clearance. Of course, an improvement on the Preston route as a diversion for Avanti as Wigan NW can still be served
Clearance is one thing, route knowledge is another. Although Wigan NW can still be served (which it could via Chat Moss anyway), the connection is extremely restricted capacity so only a skeleton service could use it. I'd be surprised if Avanti did maintain regular knowledge.
Clearance is one thing, route knowledge is another. Although Wigan NW can still be served (which it could via Chat Moss anyway), the connection is extremely restricted capacity so only a skeleton service could use it. I'd be surprised if Avanti did maintain regular knowledge.
I have a photo taken in Hindley on a Sunday in April 2004. It's not a photo of the railway per se (so I'd rather not post it) but the line is clearly visible and there's a Virgin Voyager on it.
I have a photo taken in Hindley on a Sunday in April 2004. It's not a photo of the railway per se (so I'd rather not post it) but the line is clearly visible and there's a Virgin Voyager on it.
I have a photo taken in Hindley on a Sunday in April 2004. It's not a photo of the railway per se (so I'd rather not post it) but the line is clearly visible and there's a Virgin Voyager on it.
Virgin (West Coast) did sign Wigan-Crow Nest-Lostock Jn. They used to have an evening 'drag' for competence with a Class 57 and 390 from Preston to Longsight.
These are the best photos I managed to get of the crane.
I don't think the size of it comes across easily on the photos, since there's not too much to compare it with.
View attachment 157910View attachment 157911
These are the best photos I managed to get of the crane.
I don't think the size of it comes across easily on the photos, since there's not too much to compare it with.
Here are a couple of examples of previous TPE once-a-day route retention services between Wigan & Bolton which appeared in public timetables.
They didn't seem to run them at times of day conducive to gathering a photographic record.
May 2007: TPE had a Mon-Sat 06:13 Wigan NW to Manchester Airport via Bolton. This one had advertised stops at Hindley & Westhoughton, so bleary-eyed commuters could indulge in a First Class seat if they chose.
There did not seem to any TPE train advertised in the opposite direction - maybe they ran something ECS in the Down direction.
May 2012: TPE trains in each direction, both in the evenings:
20:08 SX Barrow-in-Furness - Manchester Airport (21:48 at Wigan NW)
22:00 Manchester Airport - Barrow-in-Furness (22:48 SX at Wigan NW, SO direct Bolton to Preston)
[EDIT] Apologies - just realised this post is a bit OT for an 'Electrification construction updates" thread.
Network Rail is raising the height of a Grade II listed bridge to allow for the electrification of the Wigan to Bolton line.
www.networkrailmediacentre.co.uk
Network Rail is raising the height of a Grade II listed bridge to allow for the electrification of the Wigan to Bolton line.
The £100+m electrification project will improve travel across the North West by allowing greener, cleaner and quieter electric trains to run on the line.
Road and foot bridges across the route need to be raised so the 25,000 volt electric wires can be safely installed above the railway, with plenty of safe distance from motorists and pedestrians.
Deep Pit bridge is a recently Grade II listed footbridge on the border of Hindley and Ince, Wigan.
The raising of Deep Pit bridge will see two new ramps installed, giving the bridge complete step-free access for the first time in its 150-year life.
Once the bridge is raised, the project team can prepare to install the electric wires between Hindley and Ince.
Work to the bridge is due to start in summer 2024. The work will be complete in early 2025.
Sarah Bull, Sponsor at Network Rail, said: “I am grateful to Wigan Council for their collaboration, and the local community for their contribution to the public consultation on the work at Deep Pit bridge.
“This Grade II listed structure will now be future-proofed for years to come as we raise the bridge’s height and add new ramps. This will make way for electric overhead lines as part of the Wigan to Bolton electrification project.”
Network Rail has consulted with the local community on the work required to the bridge.
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.