Hello all. I've been struggling to keep track of the current state of the fleet changes and tenders out for the various TOCs, and thought it might be useful to have a master thread (in the same vein as the new stations thread) to keep a track of the current and expected tenders, with links to all the various threads. I am not envisaging this to become a long discussion thread in and of itself, and instead to become more of a reference point.
Please also let me know if I have anything wrong, and I'll try and keep it as up to date as possible
NOTE 1:
There was an announcement in July 2025 of a potential combined order of units to replace the BR era units at Chiltern, GWR and SWR, although I have not added that to the table until further information has been released.
NOTE 2:
We now know that the HS2 units will be classified as number 895. However, due to the swirling uncertainty surrounding HS2, up to and including how it interacts with the existing WCML services, these will not be included in the table until such time as we have a definitive number of trains on order, an outline specification, and/or some degree of certainty of how the HS2 services will be run. The HS2 page has an announcement that the 895 specification will be previewed at Derby.
For posterity, I am quoting post 24 here, which outlines the status of the Chiltern tenders
"Chiltern actually have four potential tenders underway, though there's no guarantee of all (or any) of them going ahead:
Please also let me know if I have anything wrong, and I'll try and keep it as up to date as possible
| TRAIN OPERATING COMPANY | FLEET TENDER OR EXPECTED CHANGE | STATUS | NOTES |
| Avanti West Coast | All 805/807s in service | - | Discussion here |
| C2C | All 720s in service | - | Discussion here |
| Chiltern Railways | There are currently three tenders issued for new or converted multiple units, totalling between 20 and 70 units See note below | Three tenders issued, expected award date of early 2025 and delivery from late 2028 | Discussion here At least one tender has been awarded, but no notice of the awardee has been published yet. |
| The full mk.5 fleet is going to Chiltern. | Units gradually entering service. | Discussion here | |
| The mk.3 fleet is gone, with a separate tender issued for 25 to 70 existing vehicles their replacement due into service early 2025 | It appears the award for this tender was the mk.5 fleet, although it is unconfirmed whether future tenders will also replace the mk.5 fleet | Discussion here | |
| 6 class 196s will transfer from WMR to Chiltern to work Cambridge - Milton Keynes EWR services from 2025 | Discussion appears to be here | ||
| CrossCountry | All units transferred from Avanti have now run in revenue service | - | Main discussion appears to be here |
| East Midlands Railway | 33 class 810s are currently on order from Hitachi | Some units in service, first unit accepted August 2025 | Discussion here |
| GTR (encompassing Great Northern, Southern and Thameslink) | 30 class 379s have joined Great Northern, causing a fleet cascade through GTR (387s) to SouthEastern (377s) | - | Discussion here |
| Grand Central | 9 class 820 five-car tri-mode units (battery, diesel, OHLE) have been ordered from Hitachi | Delivery expected from 2028 | Discussion here |
| Greater Anglia | All 720s in service | - | Discussion here |
| Great Western Railway (encompassing Heathrow Express via management contract) | A strategy for enhancement/replacement of 15x and 16x fleets has been published, but no tender has been issued as of April 2024 | - | Discussion here |
| The 175s are on their way to GWR land, to be based out of Plymouth Laira depot for work around Plymouth and Exeter. First unit introduced December 2025 | All 70 coaches? have been leased, units are being introduced and cycled through refurbishment at Wolverton | Discussion here | |
| 3 class 230s have been purchased from what was formerly VivaRail, this project is now run in-house by GWR | One of these units runs on the Greenford branch, and is being used to test battery and fast charging technology At least one of these units is in service (230 001) Two appear to be stored in Reading Depot | Discussion here | |
| Hull Trains | See Lumo | - | - |
| London Northeastern Railway | 10 class 897s are currently on order from CAF, to replace the remaining mk.4 sets These ten car sets will be tri-mode (battery, diesel, OHLE) | Order placed November 2023, delivery expected from | Discussion here |
| London North Western Railway | See West Midlands Trains | ||
| Lumo (encompassing Grand Union Trains, Lumo West Coast, and any future OA business ventures under First) | The amalgam of First OA operations have agreed to collectively order 14 five car units, number 808, from Hitachi, with options for 13 more, in various power configurations These will be used to lengthen trains on the Kings Cross - Hull/Edinburgh routes, and to be used on any future routes ( | Delivery expected from 2027 | Discussion here |
| 5 class 222s are being transferred from EMR to Lumo West Coast | 2 units to begin driver training runs from October 2025. First unit transferred to Polmadie w/b 20/10/2025. 5 units to be delivered in total, to make six car units, full service expected 2026 | Discussion here | |
| Merseyrail | All 777s in service | - | Discussion here |
| Northern Trains | Tender issued for up to 450 new units | Tender issued August 2023, shortlist issued Jan 2025. | Speculative discussion here and non-speculative discussion here Shortlist discussion here Tender |
| All 323s in service | - | Main discussion appears to be here | |
| All 323s will be withdrawn and replaced by 350/2s | First 350/2 expected in service in 2027 | Discussion here | |
| ScotRail | A tender was issued in July 2025 for a combined order of BEMUs and EMUs. | Tender outlines an order for "approximately 69 units, potentially comprising around 41 EMUs and 28 BEMUs." | Discussion here |
| Still no news on the replacement of the remaining BR era DMUs | Information regarding the DMU replacement was expected late 2024, outlining a new (presumably hydrogen or BEMU) fleet for rural lines not currently expected to be electrified | - | |
| The 22 remaining 222s not going to Lumo are now officially headed to ScotRail. | Training manuals, administrative route clearance and maintenance training have begun | Discussion here | |
| SouthEastern | The GTR to SouthEastern internal cascade of 397s, 387s and 377s has taken place | See also GTR | Discussion here |
| Tender issued for between 350 and 570 vehicles, with an option for an additional 70 vehicles | Expected award date of December 2024, delivery from 2027 | Discussion here Tender | |
| South Western Railway | 90 class 701s are being introduced | All ten car 701s units have been accepted, and half the five car units have been delivered from storage | Discussion here |
| The 458s are being withdrawn as the 701 introduction continues | 14/28 of the 458/4s withdrawn, last unit off lease expected by August 2026 All 458/5s withdrawn | Discussion here | |
| All 455s withdrawn | - | ||
| TransPennine Express | 29 five car BEMUs have been ordered from Alstom, designated as the Adessia platform | Production from 2028, assembly in Derby, delivery from 2034 | Discussion here |
| Transport for London (Encompassing the Elizabeth Line and Overground) | 10 additional 345s for the Elizabeth Line have been ordered to support the extension from Paddington to Old Oak Common. | Contract awarded Summer 2024, building underway from mid-2025 | Discussion here |
| 43 CAF B23 stock for the DLR have been ordered | First units entered service September 2025 | Discussion here | |
| Building of the Siemens 24 Stock for the Deep Level Lines (Bakerloo, Central, Piccadilly and Waterloo & City lines) has begun | Delivery and testing underway as of Summer 2025, in service expected 2027 | Discussion here | |
| Transport for Wales | 77 class 197s are currently being introduced | 76 units accepted for service: 50/51 two car units and 26/26 three car units | Discussion here |
| 5 class 230s have been accepted for the Borderlands Line | 4 units in service, one stored out of use for spares (230 006) | Discussion here | |
| All 756s in service | - | Discussion here | |
| All 231s in service | - | See above | |
| 36 class 398s (tram-trains) being introduced for the Valley Lines | First unit introduced June 2026 | Discussion here | |
| Tyne and Wear Metro | 46 class 555s are being introduced | 36? units accepted for service, some units temporarily withdrawn pending investigations into suspension issues | Discussion here |
| It is likely that there will need to be a follow on order of class 555s to cover the increased workload from the reopening of the Washington line, as announced in the Spending Review, June 2025 | |||
| West Midlands Trains (encompassing London Northwestern Railway) | All 730/0s in service | All units accepted for service | Discussion here |
| 36 class 730/2s are are being introduced for LNWR long-distance services | 32 units accepted for service | See above | |
| All 196s in service | - | Discussion here | |
| All 350/2s withdrawn | - | Discussion here |
NOTE 1:
There was an announcement in July 2025 of a potential combined order of units to replace the BR era units at Chiltern, GWR and SWR, although I have not added that to the table until further information has been released.
NOTE 2:
We now know that the HS2 units will be classified as number 895. However, due to the swirling uncertainty surrounding HS2, up to and including how it interacts with the existing WCML services, these will not be included in the table until such time as we have a definitive number of trains on order, an outline specification, and/or some degree of certainty of how the HS2 services will be run. The HS2 page has an announcement that the 895 specification will be previewed at Derby.
For posterity, I am quoting post 24 here, which outlines the status of the Chiltern tenders
"Chiltern actually have four potential tenders underway, though there's no guarantee of all (or any) of them going ahead:
- 25 to 70 existing vehicles - This is the Mk3 replacement contract, and theoretically due into service in 2025. - Tender notice: https://www.find-tender.service.gov.uk/Notice/037814-2023
- 30 to 70 new battery MUs or 30 to 70 existing or converted battery MUs - Tender notices: https://www.find-tender.service.gov.uk/Notice/026867-2022 and https://www.find-tender.service.gov.uk/Notice/026866-2022
- 20 to 70 new or converted low emission units - Tender notice: https://www.find-tender.service.gov.uk/Notice/022896-2023"