SWR to withdraw public access to Guildford Station Footbridge

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
I take it there was more space for them to do this than at Guildford where they had the close the entrance for 2 weeks?
I wouldn’t say so. But shutting the town (and bus station) side of Woking station would be a big deal. The entrances/exits get crowded enough as it is.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
I wouldn’t say so. But shutting the town (and bus station) side of Woking station would be a big deal. The entrances/exits get crowded enough as it is.
It is possible they had less pavement works needed compared to Guildford. Also the area inside the booking hall is bigger than the back of Guildford station.

I'm just trying to understand the differences that led to the diffeerent approaches.
 

Oldgaloot

Member
Joined
26 Nov 2023
Messages
106
Location
Guildford
Someone commented that space might be needed to replace the ticket machines. If you magnify the new pic you can see the machines aren't all that huge unless they're very deep into the wall at the back. Think of the cash machines in your local building society. They're not huge.

The problem is that if you want to run over a significant number of people in one go you'd just drive at the bus queue on the opposite side of Guildford Park Road which is often quite long with people travelling up to the hospital. I do remember the attack on Glasgow Airport in 2010. It was pretty horrific in its planning and execution. Maybe Network Rail has been advised of a specific threat, but as someone said the gap is large enough to drive a truck through, so what's the point of what's been done?

I must say that when I walk acros Waterloo Bridge I feel reassured by the lumps of concrete keeping vehicles safely off the pavement!
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
It is possible they had less pavement works needed compared to Guildford. Also the area inside the booking hall is bigger than the back of Guildford station.

I'm just trying to understand the differences that led to the diffeerent approaches.
Its a fair point that Woking opens onto a wider pavement with no through traffic, and then a semi pedestrianised road. Not a narrow pavement onto a busy road that doesn't allow for mucking about much where people come in and leave.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
Guildford Park Road entrance closed again from 25 May to 5 June as bollards are installed.

Perhaps this is the remaining ones.

After this perhaps they can still some at the bus stop opposite, where people wait. :lol: :lol:

I wonder if the work will finish earlier than the time alloted, with the footbridge closed for the reminder of the time, whilst no work is done?

Or will they better be able to maych the time required to do the work with the closure period Last time they finished 4 days early and the footbridge remained closed for the remaining 4 days.

This time they finish on a Wednesday but I don't know the amount of work required and whether they are still assuming the same pro rata length of time.

I wonder if there will be any more closures after this?

The details on the Web site are:

Station information​

From Saturday 25 May to Wednesday 5 June 2024 the station entrance by Guildford Park Road will be closed while we install bollards to improve safety at Guildford station. Customers wishing to access the station during the works will need to use the main entrance by Walnut Tree Close.

Thank you for your patience while we complete this essential work.

The poster at the station didn't explain why the entrance was closes but did have a link to the Web site, which fortunately did explain why. Here is an image of the poster.

20240515_134949.jpg
 

Oldgaloot

Member
Joined
26 Nov 2023
Messages
106
Location
Guildford
I've seen the letter Network Rail has sent to those it calls "Railway Neighbours". In essence the explanation for the closure of access to the station and traffic lights etc on Guildford Park Road is to "complete" the work they started some weeks ago. They don't actually explain why the work couldn't have been completed in the time but, as infobleep has pointed out, there was in fact time remaining in the previous closure when nothing was happening. But they'd already excavated the pavement for the bollards which are now to be installed. Never mind, they did a lovely job of filling it all in again.

And on the subject of a permanent closure of the bridge over the station (because of mass anti-social behaviour and thousands of fare evaders getting on and off at Guildford) it's all gone a bit quiet. Anyone know why?
 

Fazaar1889

Member
Joined
5 Oct 2022
Messages
629
Location
South East
And on the subject of a permanent closure of the bridge over the station (because of mass anti-social behaviour and thousands of fare evaders getting on and off at Guildford) it's all gone a bit quiet. Anyone know why?
They have cameras on their lanyards now, so that might be one reason...
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
They have cameras on their lanyards now, so that might be one reason...
I hadn't noticed. I do hope that helps.

Going past I studied the bollards and there are 4 installed and space for 4 more.

If the amount of work required is the same, then they have alloted less time to do the work this time.
 

Oldgaloot

Member
Joined
26 Nov 2023
Messages
106
Location
Guildford
I hadn't noticed cameras on lanyards either but I'll have a look when I cross the station bridge on my way into town later on.

Nothing NR does would surprise me so if they've allocated less time for the same amount of work that would be par for the course. What I find surprising is that they're content to repeatedly block up Guildford Park Road with lights when it's the principal route to and from the A3 to the town.
 

Bigfoot

Established Member
Joined
2 Dec 2013
Messages
1,415
I hadn't noticed cameras on lanyards either but I'll have a look when I cross the station bridge on my way into town later on.

Nothing NR does would surprise me so if they've allocated less time for the same amount of work that would be par for the course. What I find surprising is that they're content to repeatedly block up Guildford Park Road with lights when it's the principal route to and from the A3 to the town.
It may have been that Surrey CC wouldn't allow them the full time for traffic management for the whole job to be done at once and needed to be split across two periods of work.
 

Fazaar1889

Member
Joined
5 Oct 2022
Messages
629
Location
South East
It may have been that Surrey CC wouldn't allow them the full time for traffic management for the whole job to be done at once and needed to be split across two periods of work.
That seems the most likely. The works to create the zebra crossing at the top of the chase infuriated the NIMBYs so I'm sure that the council got 1001 complaints for that. The local facebook group was fun to watch during that time.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
It may have been that Surrey CC wouldn't allow them the full time for traffic management for the whole job to be done at once and needed to be split across two periods of work.
You'd think NR would let people know that further work was due later in the year.
 

Surreyman

Member
Joined
29 Jan 2012
Messages
1,017
I hadn't noticed cameras on lanyards either but I'll have a look when I cross the station bridge on my way into town later on.

Nothing NR does would surprise me so if they've allocated less time for the same amount of work that would be par for the course. What I find surprising is that they're content to repeatedly block up Guildford Park Road with lights when it's the principal route to and from the A3 to the town.
I received a 'Railway Neighbours' letter but had already seen the notice on Gfd Park Rd entrance, its makes some sort of sense, - I had joked with the rail staff about leaving enough space to drive a 7.5 tonne truck through, it fell on deaf ears with the temp/agency staff!
I visited Woking station yesterday and noticed that they have had the 'anti terrorist bollards' installed, presumably there is a budget and an installation timetable, would love to know which stations have been prioritised as high/low risk?
I notice that car drivers still pick-up/drop off by the shops just west of the station entrance, also the current layout of bus stops/traffic islands means that all traffic comes to a stop when a bus pulls up, overtaking is now physically impossible, this must be intentional.
The mostly temporary rail staff will open the gates without bothering to physically check if you have a valid ticket, presumably to avoid conflict.
 

Oldgaloot

Member
Joined
26 Nov 2023
Messages
106
Location
Guildford
If fare evasion really troubled SWR, I'm sure they'd have revenue protection people on stations and trains far more frequently (and in far greater numbers) than they do now.
 

Oldgaloot

Member
Joined
26 Nov 2023
Messages
106
Location
Guildford
It's quiet, too quiet. as they used to say in all the best westerns, but at the station yesterday about four in the afternoon there were half a dozen Surrey police in the booking hall and two British Transport Police on the other side of the gateline. The helpful chap on the Guildford Park Road side of the bridge told me they were there for fare evasion. That makes more sense to me than closing the bridge to unticketed pedestrians and is exactly what they do at stations up and down the land from time to time. At Clapham Junction they even have drugs detecting dogs.

The more I think about this the more I wonder what SWR are really up to. I suppose we'll find out one of these days.
 

boiledbeans2

Member
Joined
15 Oct 2020
Messages
958
Location
UK
It's quiet, too quiet. as they used to say in all the best westerns, but at the station yesterday about four in the afternoon there were half a dozen Surrey police in the booking hall and two British Transport Police on the other side of the gateline. The helpful chap on the Guildford Park Road side of the bridge told me they were there for fare evasion. [...]
Interesting. So what kind of fare evasion are they trying to catch? Those who push through the barriers?
Anybody could've said they are just crossing the bridge, and didn't use the trains.
 

Recessio

Established Member
Joined
4 Aug 2019
Messages
1,489
Location
London
Interesting. So what kind of fare evasion are they trying to catch? Those who push through the barriers?
Anybody could've said they are just crossing the bridge, and didn't use the trains.
There's a lot of stations without barriers nearby, especially on the GWR routes. So if you enter at Guildford via claiming to use the footbridge, you could get away without a ticket if you don't get checked on the train.

Or, if the station on the other end has barriers, a lot of people would enter (or exit) Guildford claiming to just be using the bridge. And instead of buying a full ticket between Guildford and their destination (or departure) station, they instead would buy a short fare between that station and a neighbouring one, avoiding paying for most of their journey.
 

boiledbeans2

Member
Joined
15 Oct 2020
Messages
958
Location
UK
There's a lot of stations without barriers nearby, especially on the GWR routes. So if you enter at Guildford via claiming to use the footbridge, you could get away without a ticket if you don't get checked on the train.

Or, if the station on the other end has barriers, a lot of people would enter (or exit) Guildford claiming to just be using the bridge. And instead of buying a full ticket between Guildford and their destination (or departure) station, they instead would buy a short fare between that station and a neighbouring one, avoiding paying for most of their journey.
Yes, this was what I meant. Even with BTP at Guildford gateline, how do they distinguish between fare evaders and people who were just genuinely crossing the bridge?
 

Recessio

Established Member
Joined
4 Aug 2019
Messages
1,489
Location
London
Yes, this was what I meant. Even with BTP at Guildford gateline, how do they distinguish between fare evaders and people who were just genuinely crossing the bridge?
Oh sorry, I see what you mean. Good point - unless the BTP escorts people across, or is doing some sort of in-and-out check over radio. "hey did you see this gentleman come in at the other side"?
 

Cantab26

Established Member
Joined
9 Jun 2016
Messages
1,948
Oh sorry, I see what you mean. Good point - unless the BTP escorts people across, or is doing some sort of in-and-out check over radio. "hey did you see this gentleman come in at the other side"?
We certainly wouldn’t be doing that: too much radio clutter!
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,934
Yes, this was what I meant. Even with BTP at Guildford gateline, how do they distinguish between fare evaders and people who were just genuinely crossing the bridge?

Oh sorry, I see what you mean. Good point - unless the BTP escorts people across, or is doing some sort of in-and-out check over radio. "hey did you see this gentleman come in at the other side"?

If there were revenue staff at both entrances, presumably they could simply return temporarily to the old bridge pass system? If those were numbered or counted, there would also be evidence of how many people might have left the station by train.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,934
I expect that slicedbread has noted a report on Surrey Live that NR and SWR have applied to Guildford Borough Council for planning permission to extinguish the right of way across the footbridge.

Unfortunately the website is a typical Reach mess of adverts and popups which make it very hard to read, but salient points are:
'Significant issues' could result in a major change at Guildford train station for first time in nearly 50 years
Rail operators agreed to the rule when the station was first redeveloped in the 1980s, but now they want to scrap it
A major change to the rules at Guildford train station is being proposed by rail operators, who argue that the agreement it made with the council in the 1980s is now causing "significant issues" for staff.
(Edited to add the following paragraph which I inadvertently omitted)
This week, Network Rail and South Western Railway (SWR) have submitted a planning application to Guildford Borough Council, requesting an end to the agreement the organisations made back in 1986.
The proposals would see non-fare paying members of the public no longer allowed to use the station's footway to walk between its main entrance and its back entrance on Guildford Park Road in a system unofficially known as a 'bridge pass'.
In the planning application, the rail operators claim that allowing people to pass through the station has led to "significant issues of abuse and assault of station staff".
Operators argue that there are "equally convenient" alternative walking routes on pathways around the station and prohibiting non-ticket buying passers-through would "significantly improve" safety at the station.
There is more if anyone wants to fight their way through to it:
 
Last edited:

markle

Member
Joined
13 Apr 2023
Messages
196
Location
London
I'd be fascinated to know what the "equally convenient" alternative routes are.

To my knowledge the only one is an actively hostile pedestrian environment - a narrow footpath next to the busy A31 over a railway bridge.

If they want to close this route they need to provide a decent alternative - a separate unticketed footbridge. Or build a parallel footbridge adjacent to the road bridge.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,392
I expect that slicedbread has noted a report on Surrey Live that NR and SWR have applied to Guildford Borough Council for planning permission to extinguish the right of way across the footbridge.

Unfortunately the website is a typical Reach mess of adverts and popups which make it very hard to read, but salient points are:





There is more if anyone wants to fight their way through to it:
The railway prioritising the railway and sod everyone else.
 

Recessio

Established Member
Joined
4 Aug 2019
Messages
1,489
Location
London
As a local resident who uses the bridge most days: the existing pedestrian environment up to the station on nearly all approaches is already horrendous, an extra 100m along the Farnham Road Bridge is only as likely to kill me as the rest of it. And the amount of issues with assaults on railway staff and fare dodging I've witnessed at Guildford is biblical (not helped by most surrounding stations not having ticket barriers or even being staffed - so if you can get through the barriers at Guildford, there's a good chance you'll have a free journey). I'm not too fussed by losing the bridge pass.

I do hope when the station is redeveloped they do something about the bridge, but I'm not sure the plans actually touch the existing platforms or the footbridge, maybe it's just the main station building?
 
Last edited:

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,570
Location
UK
The application is here on Guildford Borough Council's planning portal. I've attached the documents for posterity (I had to split the original section 52 agreement with BR into two documents to upload it).

It sounds like this is basically a rubber stamping exercise, since the attached letter states:
NR and SWR have been in discussion with GBC to formally terminate the obligation and the agreed route to do so was the submission of this formal request followed by a decision taken by GBC to confirm agreement to terminate.

The planning obligation can be terminated provided the two parties to the s52 legal agreement (NR as British Rail’s successor and GBC) agree to do so. It is within the railway’s interest to have this obligation terminated and further information is set out within the accompanying Planning Statement and Supporting Information to support the request.

Having now submitted the formal request, NR and SWR would value a positive decision in respect of agreeing to terminate the obligation be taken by GBC as soon as practicable.

Not very transparent of them to conduct such conversations behind closed doors.

The main road bridge really isn’t bad to walk over.
If it's anything like the road bridge at Crewe (and it looks that way on Google Street View), I'm rather glad I won't be affected by this. Narrow, nothing separating the traffic from you, barely wide enough for 2 people to pass each other. Sounds lovely!
 

Attachments

  • 86_P_01712_S106_1-PLANNING_STATEMENT-2239344.pdf
    384.2 KB · Views: 33
  • 86_P_01712_S106_1-APPLICATION_FORM-2239339.pdf
    170.5 KB · Views: 10
  • 86_P_01712_S106_1-LOCATION_PLAN-2239337.pdf
    210.6 KB · Views: 6
  • Letter.pdf
    105.7 KB · Views: 6
  • Agreement pg 11-21.pdf
    4.1 MB · Views: 5
  • Agreement pg 1-10.pdf
    3.6 MB · Views: 3

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,581
As a local resident who uses the bridge most days: the existing pedestrian environment up to the station on nearly all approaches is already horrendous, an extra 100m along the Farnham Road Bridge is only as likely to kill me as the rest of it.

The main road bridge really isn’t bad to walk over.

If it's anything like the road bridge at Crewe (and it looks that way on Google Street View), I'm rather glad I won't be affected by this. Narrow, nothing separating the traffic from you, barely wide enough for 2 people to pass each other. Sounds lovely!

I’ve probably walked across the Farnham Road bridge a couple of hundred times, and in my view it simply isn’t an issue. Far worse pavements to walk down in Guildford, including almost every one that you would use to get the either end of the station footbridge on foot, especially Bridge St across the river.
 