Nottingham59
Established Member
Without phase 2a, HS2 capacity will be limited by the number of trains that can fit through the flat crossing at Colwich. During the day, throughput will be limited to around 10 tph or less: 6xHS2; 2xWCML (one fast, one slow); 2xfreights. The constraint comes from the WCML being a mixed traffic railway with slow freights and fast passenger trains.
But during the evening peak period, 4-7pm out of Euston and around 5-8pm at Colwich, there won't be any freights timetabled and all trains will running at the same speed on the WCML (110mph). The capacity of Colwich and Shugborough tunnel should be much higher. I'd expect that 12tph or more would be easily possible through Colwich, e.g. 2xWCML; 10xHS2. Similarly, I'd expect the capacity of Crewe-Weaver to be much greater with a passenger-only evening peak. And trains coming into Euston from the depot to serve peak flows won't need cleaning, so could turn round faster at Euston.
Is my reasoning correct? What will the capacity of HS2 at peak times with no freights timetabled over the critical junctions? Where will the constraints be? Could extra trains terminate at Warrington or Preston or Macclesfield, if they won't fit into Manchester or Liverpool?
For info, the indicative train service for HS2 phase one shows 7tph from HS2 going through Colwich.
"Assessment of Parliamentary Powers (Phase One only). The Parliamentary Powers case assumes 6tph from Old Oak Common to
Birmingham and the North West (via Handsacre Junction) in 2029. From 2031, 10tph are assumed to operate from Euston to Birmingham and the North West (via Handsacre Junction).

But during the evening peak period, 4-7pm out of Euston and around 5-8pm at Colwich, there won't be any freights timetabled and all trains will running at the same speed on the WCML (110mph). The capacity of Colwich and Shugborough tunnel should be much higher. I'd expect that 12tph or more would be easily possible through Colwich, e.g. 2xWCML; 10xHS2. Similarly, I'd expect the capacity of Crewe-Weaver to be much greater with a passenger-only evening peak. And trains coming into Euston from the depot to serve peak flows won't need cleaning, so could turn round faster at Euston.
Is my reasoning correct? What will the capacity of HS2 at peak times with no freights timetabled over the critical junctions? Where will the constraints be? Could extra trains terminate at Warrington or Preston or Macclesfield, if they won't fit into Manchester or Liverpool?
For info, the indicative train service for HS2 phase one shows 7tph from HS2 going through Colwich.
"Assessment of Parliamentary Powers (Phase One only). The Parliamentary Powers case assumes 6tph from Old Oak Common to
Birmingham and the North West (via Handsacre Junction) in 2029. From 2031, 10tph are assumed to operate from Euston to Birmingham and the North West (via Handsacre Junction).