Snow1964
Established Member
But the abstractive test is not between 2 or 3 stations, it is across whole service, and as long as that is below 30% then ok. If say Milton Keyes-Nuneaton is only 5% then could be higher elsewhere.The problem for WS&M is that tapping into the market for local travel could be seen as extractive when it come to TfW services.
Alstom plans to operate its own passenger train service in the UK for the first time
Alstom is partnering with SLC Rail to form a new open access rail operation between North Wales, Shropshire, the Midlands and London
We know Alstom is involved, and appears to be a major backer of the project, and I do wonder if it has a few tricks up its sleeve.
I am sure it was said in the past, that main problem with 22x fleets is too many driving cars, lots of services need 6 (or 7) car units, but not the double sets working together. Got me thinking and maybe Alstom have worked out that if they rebuild driving end of some vehicles as a pantograph intermediate end and substitute the diesel unit in that vehicle for a transformer, they can potentially get lots of 5 or 6 car bimodes instead, at much cheaper rate for next 20 years than supplying new stock that operators can't afford.
I know it might sound like a rehash of the old lengthening the sets with an electric power car (a project that died due to cost about 15 years ago), but economics are different now, have spare driving vehicles (compared to ideal formations), have already got most of the bodyshell, got bogies etc. If the spare cab fittings and spare engines etc just go into spare parts pool. Then the cost of the new bits is partly covered by not needing to buy some spare parts. Voila, bimodes with 15-20 year lifespan, and no silly short 4car sets. Potentially Alstom have some spare parts from a withdrawn 25kv train in France that would be good for 15 years, as I said maybe some tricks up their sleeve.