it is a lot of hassle for passengers arriving off mainline services at Central to then go to P6 and take a train to Queen Street and then transfer to another train to the Bay. In fact, it would be easier to just exit Central south side and catch a bus. (The Cardiff Bus 6 now goes direct to Bay from behind the library and under Bute Street bridge rather than the previous route with a stop near the Central station south side). Therefore, there is a desire to have a direct link from Central to the Bay and this could eventually be a through service from the western suburbs via The City Line.There is actually a second bay platform at Cardiff Queen Street, which is not in use at the southern end of platform 5. There is also a lot of free land for adding extra tracks south of Cardiff Queen Street if required.
Having looked at the diagram in the white paper and Google Maps, it appears the idea is to run tracks under the A4232 and onto street level on or alongside Roath Dock Road and then run on street along Pierhead St and either around the back of the Millenium Centre (or past the Senydd and then in front of the MC) and up towards the exiting Cardiff Bay Station.
Given that there is unlikely to ever be a spur on the city line towards Creigau (housing in the way), it would make more sense to have a Cardiff Queen Street to Cardiff Parkway service, which would be cheaper and easier to achieve.
They can worry about Callaghan Square in the future, if there is the demand.
After all, everyone heading to Cardiff Bay from Pontypridd, etc is going to take a direct train shortly and anyone coming in from Barry, Penarth, Caerphilly, etc, would change at Queen Street, so anyone heading to the bay from along the South Wales mainline can simply go via Queen Street.
The small number of houses that were built on the bed of a former railway just NW of Fairwater station would be demolished. A new Metro would be for the greater good of the transport system in order to serve all the new developments such as Plasdwr and that south of Cregiau / Llanilltern. The road system just cannot cope with the increasing population - not helped by the ridiculous decision not to have a road link between the A4119 (Llantrisant Road) and a much improved (flyovers rather than roundabout with lights) M4 J33. Radyr, Fairwater, Llandaff and St. Fagans are already seeing vast increases in traffic resulting from the new developments.