• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Future Connections from Heritage Railways to Network Rail

Status
Not open for further replies.

Jan Mayen

Established Member
Joined
30 Sep 2020
Messages
1,358
Location
Sussex
Following on from the news that Swanage Railway won't be operating to Wareham this year, I was wondering if this is going to make any other proposed connections unlikely to happen?
For example, as much as I'd like to see it happen, I suspect the extension to Ardingly on the Bluebell Railway probably won't be built.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,958
Location
Airedale
Following on from the news that Swanage Railway won't be operating to Wareham this year, I was wondering if this is going to make any other proposed connections unlikely to happen?
For example, as much as I'd like to see it happen, I suspect the extension to Ardingly on the Bluebell Railway probably won't be built.
Was that ever going to be used for through Bluebell services on NR track? Running NR trains through is less of an issue.

The other longtime proposal is Taunton-Minehead WSR, which hasn't got very far.
Hampton and Kempton narrow gauge railway has aspirations to run to Kempton station.
...but not sharing NR track, I assume :)
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,338
What's the current situation for Northallerton West (Wensleydale Railway)?
 

Gwr12345

Member
Joined
28 Jun 2020
Messages
286
Location
Delayed
What's the current situation for Northallerton West (Wensleydale Railway)?
Closed since 2016, with no passenger trains running in the stretch from Scruton to Northallerton since, although ECS still runs and the physical connection is still used, due to a level crossing incident? Current focus I would imagine is getting back to Redmire.
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,288
Location
East Midlands
Closed since 2016, with no passenger trains running in the stretch from Scruton to Northallerton since, although ECS still runs and the physical connection is still used, due to a level crossing incident? Current focus I would imagine is getting back to Redmire.
I was lucky enough to get to travel from Northallerton West all the way to Redmire and back during the relatively short period of operation, and even luckier to get a front seat on the DMU, I found the scenery pretty great, the "ski-jump" thing at Redmire was impressive, lots of birds of prey around - and lots of suicidal pigeons and rabbits sitting on the rails until the very last second.

As I understood it, re-opening to Northallerton West depends on upgrading one or more level crossings and I got the impression they just didn't have the money. Probably not a priority - although it's the sort of station I'd use (short walk from Northallerton NR station) it's probably not very convenient for most people, who'd arrive by car at one of the main stations. Shame though.
 

ikcdab

Member
Joined
3 Feb 2012
Messages
474
Location
Cogload Junction
Was that ever going to be used for through Bluebell services on NR track? Running NR trains through is less of an issue.

The other longtime proposal is Taunton-Minehead WSR, which hasn't got very far.

...but not sharing NR track, I assume :)
It isn't Taunton to Minehead, but Taunton to Bishops Lydeard. There is no plan to run WSR trains on the mainline, the intention is for GWR to run trains to BL themselves. We trialled this before covid and the talks are in hand to get it going again. it is progressing slowly.
In the absence of regular services, the HOBC frequently uses the link and we run excursions from the main line during the season.
 

Neilo09

Member
Joined
24 Jun 2012
Messages
51
East lancs to Castleton is/was planned but gone quiet in the last few years
 

50002Superb

Established Member
Joined
18 Aug 2021
Messages
2,094
Location
Nottingham
It isn't Taunton to Minehead, but Taunton to Bishops Lydeard. There is no plan to run WSR trains on the mainline, the intention is for GWR to run trains to BL themselves. We trialled this before covid and the talks are in hand to get it going again. it is progressing slowly.
In the absence of regular services, the HOBC frequently uses the link and we run excursions from the main line during the season.
Interesting update, thanks.

Is the GWR to BL service a shuttle or a through service from elsewhere? I had no idea that this had been trialled before.

== Doublepost prevention - post automatically merged: ==

The Great Central (North) has a mainline connection.

I’m not sure if it’s been used for railtours previously but longer term when the gap is bridged I suspect it
might see more use?
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
There is news that the GCR(N) is again rail connected as the track across the new A60 bridge has been laid. Also they hope to begin construction of the next two stages of the "Gap" project later this year. They are halfway through reconnection the GCR to the GCR(N).....and hence to NR.
 

Townsend Hook

Member
Joined
3 Aug 2011
Messages
932
Location
GB
The Kent & East Sussex Railway stands to gain a main line connection in the next few years, once the Rother Valley Railway link between Bodiam and Robertsbridge is complete. Although IIRC it’s not configured in such a way that it could really be used by railtours/through passenger services.
 

37114

Member
Joined
4 Jul 2019
Messages
511
I think the long term plan is still for the GWSR to link up with NR at Honeybourne to facilitate through trains on raceday but will be a while.
 
Status
Not open for further replies.

Top