Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Considering how they have proper level boarding plus their well designed interiors, how come they aren't catching on with other TOCs? Is it anything that can be easily fixed with some modifications and/or a yet-to-exist example or something more fundamental regarding infrastructure and/or the core train structure?
They are extremely expensive, I believe. They also have the downside that because kit is above the floor that would be under it in a high floor unit they make poorer use of platform length - in effect they are LHCS in that sense when you take into account the "thrash pod" and the large area behind the cab that contains electrical kit.
Considering how they have proper level boarding plus their well designed interiors, how come they aren't catching on with other TOCs? Is it anything that can be easily fixed with some modifications and/or a yet-to-exist example or something more fundamental regarding infrastructure and/or the core train structure?
It's curious, because FLIRTs have caught on exceptionally well in Europe - and the rest of the world, for that matter. I wonder if they could come up with a more European-style FLIRT without the "thrash/gubbins pod" that would still suit the British infrastructure. Having said all of that, perhaps it is the FLIRT MkII that introduces these issues, as opposed to the more-widespread MkI version.
I think the primary reason is simply because they are expensive compared to Hitachi or CAF stock. My understanding is that Stadler Rail is only really awarded contracts that are unlikely to see repeat custom such as with Merseyrail or the Tyne and Wear Metro. A bit of a shame to be honest because Stadler FLIRTS are some of the nicer looking stock I've seen on the network, and their level boarding and subtle Swiss style really has set a new standard for rolling stock in the UK, and I'd love to see a SMILE (high speed FLIRT-based unit) scaled down to UK loading gauge.
They are extremely expensive, I believe. They also have the downside that because kit is above the floor that would be under it in a high floor unit they make poorer use of platform length - in effect they are LHCS in that sense when you take into account the "thrash pod" and the large area behind the cab that contains electrical kit.
Cost wise, do you get what you pay for, a better train? With the current arrangements everything seems to be based on the cheapest/not quite adequate to save money, so you end up with poor quality interiors in a lot of cases.
Is maintenance easier having one power pod, with everything above floor level?
Certainly from a passenger point of view not having underfloor engines is a plus.
Stadler's thing is smaller batches of well-designed trains. They can't handle the gigantic orders of Aventras and Desiro Cities. I'd expect them to get a few more orders in the UK, I can see them getting some work at Scotrail and GWR. Northern maybe but it may be pushing the number of trains Stadler can reasonably deliver.
They also have fewer motored axles so have worse regenerative braking performance than Aventras. On their orders so far this hasn't been a massive priority, but it puts them down on 25kv commuter services.
It's curious, because FLIRTs have caught on exceptionally well in Europe - and the rest of the world, for that matter. I wonder if they could come up with a more European-style FLIRT without the "thrash/gubbins pod" that would still suit the British infrastructure. Having said all of that, perhaps it is the FLIRT MkII that introduces these issues, as opposed to the more-widespread MkI version.
The power pod is only included in the multi-mode versions - the OHLE-only versions like the 745s don't have it, as the electric traction equipment is situated behind the cabs (and the two pseudo/dummy cabs in the middle of a 745, which are basically two single-cab 6-car units coupled back-to-back).
One problem is that UK-size trains have a lower maximum roof height than mainland Europe size trains, so it's much harder to move equipment from under the floor into the roof space if you are designing a low-floor/level boarding train for the UK.
Stadler's thing is smaller batches of well-designed trains. They can't handle the gigantic orders of Aventras and Desiro Cities. I'd expect them to get a few more orders in the UK, I can see them getting some work at Scotrail and GWR. Northern maybe but it may be pushing the number of trains Stadler can reasonably deliver.
They also have fewer motored axles so have worse regenerative braking performance than Aventras. On their orders so far this hasn't been a massive priority, but it puts them down on 25kv commuter services.
Yes and no, for the Tyne and Wear Metro Stadler put forward the best price...
I think Finland would disagree, they ordered 81 Sm5 FLIRTS for their commuter routes, albeit over an 8 year delivery period. I get your point though, UK railways run a denser network with a higher frequency than anything in Finland so orders will be larger and operations more intensive.
Cost wise, do you get what you pay for, a better train? With the current arrangements everything seems to be based on the cheapest/not quite adequate to save money, so you end up with poor quality interiors in a lot of cases.
I think Finland would disagree, they ordered 81 Sm5 FLIRTS for their commuter routes, albeit over an 8 year delivery period. I get your point though, UK railrays run a denser network with a higher frequency than anything in Finland so orders will be larger and operations more intensive.
And we're getting another 25 next year too! They're excellent trains, low-floor except over the bogies, and really quiet unless your near the end of the unit (where the motors are). I don't get why British FLIRTs can't be just as good.
The power pod is only included in the multi-mode versions - the OHLE-only versions like the 745s don't have it, as the electric traction equipment is situated behind the cabs (and the two pseudo/dummy cabs in the middle of a 745, which are basically two single-cab 6-car units coupled back-to-back).
Stadler's thing is smaller batches of well-designed trains. They can't handle the gigantic orders of Aventras and Desiro Cities. I'd expect them to get a few more orders in the UK, I can see them getting some work at Scotrail and GWR. Northern maybe but it may be pushing the number of trains Stadler can reasonably deliver.
They also have fewer motored axles so have worse regenerative braking performance than Aventras. On their orders so far this hasn't been a massive priority, but it puts them down on 25kv commuter services.
They may have lower regenerative braking performance (especially on European MkI FLIRTs, where only the bogies under the cabs are motored), but they can (if you order them as such) accelerate exceptionally quickly on various voltages - in fact, that's why a lot of places order them!
It's curious, because FLIRTs have caught on exceptionally well in Europe - and the rest of the world, for that matter. I wonder if they could come up with a more European-style FLIRT without the "thrash/gubbins pod" that would still suit the British infrastructure. Having said all of that, perhaps it is the FLIRT MkII that introduces these issues, as opposed to the more-widespread MkI version.
The power pack/thrash pod is present on mainland Europe FLIRTs that have diesel engines, such as those built for Slovenia recently, and they all have the end electrical equipment over front and rear bogies, too, so it isn't just a UK thing. A UK EMU FLIRT would be the same - the Anglia 745s are effectively two single-cabbed units coupled back-to-back.
Stadler's thing is smaller batches of well-designed trains. They can't handle the gigantic orders of Aventras and Desiro Cities. I'd expect them to get a few more orders in the UK, I can see them getting some work at Scotrail and GWR. Northern maybe but it may be pushing the number of trains Stadler can reasonably deliver.
Leaving aside the recent order by LNER for a small number of long distance services, there havent been any trains ordered for a long while. So nothing available to catch on!
They may have lower regenerative braking performance (especially on European MkI FLIRTs, where only the bogies under the cabs are motored), but they can (if you order them as such) accelerate exceptionally quickly on various voltages - in fact, that's why a lot of places order them!
AFAIK they all only have motors under the cabs, with 600KW motors to give good acceleration. Its a good design and allows the train to be fairly simple but it limits regen.
I like the FLIRTs, they are good trains and I can see other manufacturers borrowing the pod concept (I wish they used it on the 800s...). But they have their place on regional routes.
They were ordered in multiple batches. 34 were ordered in 2014, with the first being delivered in 2016 and all being in service by summer 2017 (~25-30/year). Stadler also has lots of different production lines going on in umpteen factories, so they're producing 1,000+ vehicles a year for various builds. Bear in mind that the FLIRT family is technically very similar too.
AFAIK they all only have motors under the cabs, with 600KW motors to give good acceleration. Its a good design and allows the train to be fairly simple but it limits regen.
Yes; while having them only under the cabs allows the rest of the trains to be low(er)-floor (more important for European markets), it does require space for beefy motors - hence the middle "gubbins pods" on the 745s, the only FLIRTs to have motors in the middle of the train.
They were ordered in multiple batches. 34 were ordered in 2014, with the first being delivered in 2016 and all being in service by summer 2017 (~25-30/year).
That's still not a lot when the units are 75m long.
Stadler makes good units, I think they could win GWR and some of Scotrail's tenders but they aren't mass manufacturing on the same level as Alstom or Siemens.
Yes; while having them only under the cabs allows the rest of the trains to be low(er)-floor (more important for European markets), it does require space for beefy motors - hence the middle "gubbins pods" on the 745s, the only FLIRTs to have motors in the middle of the train.
I like the level boarding/ride but the seats on the TfW ones are not a good shape and too hard. Apart form those above the bogey, the seats are set too low.
True a while ago, but not really now. The SBB Girunos are over 300 vehicles; OBB has 300+ double deck vehicles on order, RENFE have nearly 400 of the same
True a while ago, but not really now. The SBB Girunos are over 300 vehicles; OBB has 300+ double deck vehicles on order, RENFE have nearly 400 of the same
Indeed. They used to have one or two of those mediun orders a year, now they have several and they're constantly expanding their product and geographical range.
== Doublepost prevention - post automatically merged: ==
That's how they started and that's how they continue in the metro and light rail markets: small, niche, tailor-made orders. They've expanded into heavy rail by coming up with a platform (FLIRT) and expanding it out into similar variants (and the KISS).
When you consider the 231's are a fleet of 11 trains only then you understand the expense. They are really good trains, but the FLIRT is a continental loading guage unit and the UK ones are one off short batches to their loading guage.
When you consider the 231's are a fleet of 11 trains only then you understand the expense. They are really good trains, but the FLIRT is a continental loading guage unit and the UK ones are one off short batches to their loading guage.
The FLIRT is a modular concept in part designed for Swiss narrow gauge lines, which coincidentally have a very UK like loading gauge. The idea of it is to be able to do short runs to bespoke specs provided they can be done with the components they have.
The METRO is the same - the Merseyrail units are to a wider loading gauge than the others.
Stadler don’t have an assembly plant in the UK.
Any hint of them getting a sizeable order at the moment will have competitors briefing the press and holding a gun to the head of their UK assembly plant. Politically awkward to say the least - remember Thameslink….
A convenient scenario would be that they could take over the factory they were ‘killing’ , but I just don’t see that lining up commercially.
Who actually owns the assembly plants - manufacturers or landlords?
Considering how they have proper level boarding plus their well designed interiors, how come they aren't catching on with other TOCs? Is it anything that can be easily fixed with some modifications and/or a yet-to-exist example or something more fundamental regarding infrastructure and/or the core train structure?
A few key reasons I think:
- The first UK FLIRT design isn't that old (the design was new for GA), so not that much chance for them to be adopted by other operators since introduction
- No UK manufacture, so more chance of backlash in the type of "selling out British industry", though I suspect the effect is rather limited
- Until recently, UK operators did not value level boarding in general - though this appears to be changing, with signs that new orders will require it
- Stadler is not historically a budget manufacturer, so their costs tend to be higher
It's curious, because FLIRTs have caught on exceptionally well in Europe - and the rest of the world, for that matter. I wonder if they could come up with a more European-style FLIRT without the "thrash/gubbins pod" that would still suit the British infrastructure. Having said all of that, perhaps it is the FLIRT MkII that introduces these issues, as opposed to the more-widespread MkI version.
One of the key reasons for their popularity is that Stadler is usually able to deliver much quicker than other manufacturers in Europe
For example, in the Netherlands in this happened in the 2010s:
In 2014, the NS placed an order for CAF civity regional/local (sprinter) trains
In 2015, NS placed an emergency order for stadler FLIRTs due to unexpected growth in demand
In 2016, the first FLIRT entered service, with all in service in 2017
In 2018, the first CAF unit entered service
In 2023, the final CAF unit entered service
It is worth noting there are a lot more CAF units than Flirts though, as there's 206 of the former and only 58 of the latter!
== Doublepost prevention - post automatically merged: ==
I agree their small tailor made products for operators are great designs, however to me, it seems as though the is a major gap in quality compared to their METRO and FLIRT designs. For instance the TFW and GA FLIRTS are second to none in terms of build quality and passenger amenities, however if you look at a Merseyrail Class 777 for example, you can tell it seems to be a lesser quality product. Just those small observations such as the dreadfully unreliable PIS system (Why does a train that modern still have antiquated dot matrix displays?) and the surrounds of the wall mounted PIS screens showing journey progress just seem so unreliable and the edges look crude and cheaply erected. Plus with Merseyrails recent poor relationship with Stadler, it is probably giving future customers second thoughts of purchasing trains from them.
== Doublepost prevention - post automatically merged: ==
Though, I would definitely like to see future orders akin to the GA Class 745s the intercity FLIRT is a fabulous design which could be good competitor to the much less desirable CAF intercity Civity, akin to the TPE 397s
== Doublepost prevention - post automatically merged: ==
I still think Stadler have chance at winning some orders from Scotrail, GWR and Northern, if Bi Modes are desired then operators may desire the FLIRT, due to the fact that they seem to be operating seamlessly with GreaterAnglia and recently have won themselves a Silver Spanner!
Speaking with a senior manager a while back a reduction in track access was being negotiated across the GA network due to the reduction in bogies on the Stadler 745 fleet. Not sure how that affects 720s as being longer vehicles, they too have less when operating as 5v8 or 10v12 although 5v4 or 10v8 may cancel out any cost savings.
I agree their small tailor made products for operators are great designs, however to me, it seems as though the is a major gap in quality compared to their METRO and FLIRT designs. For instance the TFW and GA FLIRTS are second to none in terms of build quality and passenger amenities, however if you look at a Merseyrail Class 777 for example, you can tell it seems to be a lesser quality product. Just those small observations such as the dreadfully unreliable PIS system (Why does a train that modern still have antiquated dot matrix displays?) and the surrounds of the wall mounted PIS screens showing journey progress just seem so unreliable and the edges look crude and cheaply erected. Plus with Merseyrails recent poor relationship with Stadler, it is probably giving future customers second thoughts of purchasing trains from them.
Merseytravel specced their own units, and it now turns out they did so really quite badly. i guess the others took a more standard product specced by a company that is used to speccing trains (i.e. Stadler)?
Merseytravel specced their own units, and it now turns out they did so really quite badly. i guess the others took a more standard product specced by a company that is used to speccing trains (i.e. Stadler)?
All of them. They're full to the brim of design flaws, some major, some minor. In my view they are utterly awful things, the only redeeming features being level boarding and big windows.
All of them. They're full to the brim of design flaws, some major, some minor. In my view they are utterly awful things, the only redeeming features being level boarding and big windows.
I can't speak for everyone, but I honestly didn't have an issue with the 777s when I tried them earlier this week aside from the hard seats, which while I didn't have an issue with, probably won't be seen too favourably by everyone on the Southport to Hunts Cross route. But otherwise I quite liked them and therefore wouldn't mind seeing more Stadler units on the network. I don't expect there will be widespread bulk orders like we've had with Hitachi, but never say never.
What nature exactly are the design flaws? Is it general build quality issues or poor software? Or both? Like I said before, they do seem of a much less quality to the FLIRTS. It will be interesting to see how the reliability fares on the TFW Class 398 Citylink? As if I can remember the then Vosloh Espana Class 399 Tram Trains for Sheffield Supertram had a rather rocky introduction!
== Doublepost prevention - post automatically merged: ==
You would have thought Merseytravel would select Siemens with their proven Desiro City range, seeing as they have been tried and tested with Thameslink, it would have been a much safer option.
== Doublepost prevention - post automatically merged: ==
I very much doubt Stadler will win any more tenders for rolling stock, did Stadler bid for the new Southeastern suburban order? If they did I highly doubt they will win it, seeing how much trouble Merseyrail have got themselves in with the Class 777s
== Doublepost prevention - post automatically merged: ==
What nature exactly are the design flaws? Is it general build quality issues or poor software? Or both? Like I said before, they do seem of a much less quality to the FLIRTS. It will be interesting to see how the reliability fares on the TFW Class 398 Citylink? As if I can remember the then Vosloh Espana Class 399 Tram Trains for Sheffield Supertram had a rather rocky introduction!
== Doublepost prevention - post automatically merged: ==
You would have thought Merseytravel would select Siemens with their proven Desiro City range, seeing as they have been tried and tested with Thameslink, it would have been a much safer option.
== Doublepost prevention - post automatically merged: ==
I very much doubt Stadler will win any more tenders for rolling stock, did Stadler bid for the new Southeastern suburban order? If they did I highly doubt they will win it, seeing how much trouble Merseyrail have got themselves in with the Class 777s
Seeing as though Siemens have announced their new battery powered unit aimed at the UK rail market. Siemens Desiro Verve Battery Electric unit. Said unit is aimed at Scotrail, GWR and Northern to replace ex BR DMUs. Exciting! I wonder how Siemens will compete with Stadler? they will also be built at Goole.
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.