• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

4 Track Chiltern Mainline.

Status
Not open for further replies.

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,663
Oh, it is also worth noting that at Whitlocks end, the areas where the 3rd and 4th tracks used to be is now a car park, like with Acocks Green. Removal of car park would mean it would have to be relocated, maybe underground or in a building above the station. However, both would be expensive, and the latter may become an eyesore for locals.

Back with electrification, I do wonder what rolling stock WMR/Chiltern would use if Chiltern mainline was quadrupled and electrified?
Don't you mean Widney Manor? Whitlocks End is on the Stratford line.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

BogiePicker

Member
Joined
29 Dec 2020
Messages
88
Location
Leeds
Don't you mean Widney Manor? Whitlocks End is on the Stratford line.
Re: rolling stock, a wider-bodied Aventra would probably be ideal. The 165/166s are 2.8 by 23m vehicles. It would be nice to see how far they can push the gauge on the more generous historic GWR network.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Re: rolling stock, a wider-bodied Aventra would probably be ideal. The 165/166s are 2.8 by 23m vehicles. It would be nice to see how far they can push the gauge on the more generous historic GWR network.
Aventras normally are a one common bodyshell width.
 

quailking14

Member
Joined
30 Dec 2023
Messages
24
Location
West Mildands
Re: rolling stock, a wider-bodied Aventra would probably be ideal. The 165/166s are 2.8 by 23m vehicles. It would be nice to see how far they can push the gauge on the more generous historic GWR network.
This might sound unlikely, but I was thinking of instead using bombardier talents adapted to UK loading gauge. Also, I think the class 93 and mk5 coaches should replace the class 68/mk3.
 

quailking14

Member
Joined
30 Dec 2023
Messages
24
Location
West Mildands
It would be better to see the Mark 5s rebuilt as units without the need for the dead space of a locomotive.
Understandable, but I do feel the world still needs some loco-hauled passenger trains left as they are declining worldwide. I like loco hauled trains since you don't feel motorized bogie vibrations in the carriage.
 

BogiePicker

Member
Joined
29 Dec 2020
Messages
88
Location
Leeds
Understandable, but I do feel the world still needs some loco-hauled passenger trains left as they are declining worldwide. I like loco hauled trains since you don't feel motorized bogie vibrations in the carriage.
It may be said that they still are used extensively in the continent. DB uses them in their regional services.

Not all EMU carriages are motored; 745 has only 4 motorised bogies in a 12 car train, effectively a top & tailed loco hauled set (well, half a loco at each end, sandwiching a loco right in the middle).

I don't mind too much either way, but can see loco-hauled stock used for demand-responsive services. Where the platform length is in no danger of being exceeded, I see no harm in having a loco.

Returning to topic, I much prefer the Mk3s. I think they are also slightly longer than the Mk5as, and have been proven to be much less problematic to operate. I do think that to the extent that Chiltern is not competing on speed, a locomotive-hauled & comfortable offering may be a more appropriate package. It may well be more cost-effective as well: the IC225 was much cheaper per seat than the TGV and ICE, and with actual 26m carriages (Mk6), this could be accentuated further. Have a simple loco with tried and tested technology.
 
Status
Not open for further replies.

Top