802207 Hitachi testing battery power for Transpennine

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

SuperLuke2334

Established Member
Joined
23 Oct 2021
Messages
1,898
Location
Welsh Marches
I am trying to find out the current situation of unit, 802207, did this unit ever make it back into passenger service following its derailment in March 2022? (https://www.railforums.co.uk/threads/heaton-derailment-22-03-22.229511/).
If not, does anyone know the plans/likely return date for this unit?
According to trainlogger, a couple of vehicles are at Long Marston, in the Chrysalis shed, and the others are at Newton Aycliffe. Still being repaired as far as I can tell.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,369
4 coaches of the unit currently sat outside in the yard at Newton Aycliffe, the damaged cab end is u accounted for, last reported at Long Marston.
 

19Gnasher69

Member
Joined
1 Jul 2021
Messages
172
Location
Aire Valley
Does the commentary above suggest that four coaches are intact but that the driving car requires repair(s)? Why has it been taken to Long Marston in isolation? Is it simply that the insurance assessors have inspected it and it’s waiting its turn at Wolverton? I don’t know how these procedures work.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,369
Does the commentary above suggest that four coaches are intact but that the driving car requires repair(s)? Why has it been taken to Long Marston in isolation? Is it simply that the insurance assessors have inspected it and it’s waiting its turn at Wolverton? I don’t know how these procedures work.
2 coaches were taken to Long Marston and were sighted by myself there in May, they were there for Insurance Assessment.

I don’t know if the 2nd coach had repair work completed there or maybe back at Newton Aycliffe, but it is now coupled to the 3 undamaged coaches.

Who says it has to go Wolverton?

Some have had repairs in Derby at a company called Millennium.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,369
Unit fully formed up at Hitachi Newton Aycliffe, currently sat outside in the yard.

Link below taken from 8Xx group on Facebook

 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,639
Location
Hampshire
Unit fully formed up at Hitachi Newton Aycliffe, currently sat outside in the yard.

Link below taken from 8Xx group on Facebook

I’m surprised it hasn’t actually been sent to Eastleigh for repair, as Hitachi could have put it through its project “ACER” then as well as facilitated the repairs.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,369
I’m surprised it hasn’t actually been sent to Eastleigh for repair, as Hitachi could have put it through its project “ACER” then as well as facilitated the repairs.
They only have 2 (I think) roads at Eastleigh, they will have units booked in, in a certain order, and that is based on the depth of the cracks. There will be other priority units, and I believe is already 2 units there.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,369
Who ever has put the numbers back on to what was the damaged carriage has put carriage number where unit number should be, so looks like it’s numbered 831207 at one end, the other end is correct 802207.

Two pictures attached from a YouTube video, link also included below

 

Attachments

  • IMG_0199.png
    IMG_0199.png
    4 MB · Views: 296
  • IMG_0198.png
    IMG_0198.png
    4 MB · Views: 307

Towers

Established Member
Joined
30 Aug 2021
Messages
2,999
Location
UK
They only have 2 (I think) roads at Eastleigh, they will have units booked in, in a certain order, and that is based on the depth of the cracks. There will be other priority units, and I believe is already 2 units there.
Just to clarify, which 80x fleets require the crack repairs? GWR/LNER/TPE, any others?
 

AMD

Member
Joined
6 Dec 2017
Messages
773
Reported elsewhere that it’s being fitted with a battery module for trial purposes and that it’ll not return to traffic until December 2024.
And the relevant section from the article -

Battery power trial​

Meanwhile, the Class 802 trainset which was damaged in a shunting accident in March 2022 remains out of traffic. Although No 802 207 has now been repaired, it will not be returning to service yet, as it is receiving modifications for use as a battery testbed.

This will see a 6 m long, 2·2 m wide battery module installed in place of one of the existing engines, which will improve fuel efficiency by using two diesel powerpacks rather than three.

The battery module will provide top-up power for peak demand and give regenerative braking capability when operating in diesel mode, which the trains currently do not have. Arrival and departure at stations is also to be trialled in battery mode to assess noise and air-quality improvements. The train is planned to re-enter traffic in December.

‘We’re supplying that unit to support what we think is a sensible industry scheme to look at whether we can do something to move from bi-mode to tri-mode, which could be beneficial for the industry from a green perspective’, Jackson confirms.
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,992
Location
here to eternity

800001

Established Member
Joined
24 Oct 2015
Messages
7,369
After many months at Hitachi’s Merchant Park facility, after returning there from repairs caused by its derailment at Heaton, 802207 left merchant park on Tuesday 27th August running ecs to Doncaster IEP.

The unit has had batteries installed on the centre vehicle, and had done some testing within Hitachi’s factory.

Today’s move was the first on the mainline with batteries fitted to the unit. (Believed to of moved on diesel and electric power).

Looking at RTT, it appears to be currently operating over night test runs between Doncaster IEP depot and York/Darlington, before finishing at Merchant Park Wednesday Am.

The unit is now also wearing a vinyl on at least one carriage stating ‘Charged for the future’.

I’ve attached a picture taken from the 8XX Appreciation Group on Facebook.
 

Attachments

  • IMG_6499.jpeg
    IMG_6499.jpeg
    166.3 KB · Views: 261

800001

Established Member
Joined
24 Oct 2015
Messages
7,369
I'm assuming that it's running as 5Q09 then.

It’s the only thing that I could think would be working it, especially when the paths finish back at Merchant Park this morning.
 

ls2270

Established Member
Joined
24 Oct 2012
Messages
5,516
Location
Basingstoke

BlueLeanie

On Moderation
Joined
21 Jul 2023
Messages
723
Location
Haddenham
This will see a 6 m long, 2·2 m wide battery module installed in place of one of the existing engines, which will improve fuel efficiency by using two diesel powerpacks rather than three.

The battery pack is capable of delivering 700kW peak*, the same as a diesel power pack.

I can't find the kWh size of the battery though. Anyone know? With an Azuma doing 0-125 in 4.5 minutes, I'm guessing a minimum of 60kWh if the battery is exhausted on each station cycle.

* Source:- https://www.hitachi.com/New/cnews/month/2024/05/240524.html
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,369
The battery pack is capable of delivering 700kW peak*, the same as a diesel power pack.

I can't find the kWh size of the battery though. Anyone know? With an Azuma doing 0-125 in 4.5 minutes, I'm guessing a minimum of 60kWh if the battery is exhausted on each station cycle.

* Source:- https://www.hitachi.com/New/cnews/month/2024/05/240524.html
All I know is the battery is recharged whilst train is on OHL power. And also whilst the train is braking.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,369
Is this one of the first Tri Powered IET units?
No. Purely for testing/evaluation of battery operation by Hitachi.
Batteries will be removed soon, and unit returned to TPE for use from December timetable.
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,595
Is it possible to change the thread title to something more descriptive? E.g. "802207 Hitachi testing battery power for Transpennine"
 

OscarH

Established Member
Joined
15 Sep 2020
Messages
1,285
Location
Crawley
No. Purely for testing/evaluation of battery operation by Hitachi.
Batteries will be removed soon, and unit returned to TPE for use from December timetable.
Seems bizarre to add a special vinyl when they're going to remove the batteries so quickly after just test runs (lots overnight), and never use it in service.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,369
Seems bizarre to add a special vinyl when they're going to remove the batteries so quickly after just test runs (lots overnight), and never use it in service.
It’s going to go across the TPE network, it’s been a project which has been testing for several months, full project is about 6 months, maybe longer?
If Hitachi want to put a vinyl on, why not?
 