Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Yes, Stagecoach is receiving an order roughly half the size - Alexander Dennis, but in essentially the same livery as the OBC Electroliners. I had understood both companies were going to have a launch event today, but only seen the OBC one so far. Stagecoach seem to be lower-key with vehicle launches (not a peep from them about the 15 new buses at Witney last year), so I expect they'll appear soon enough fairly quietly.
EDIT/OMISSION: looks like I missed an actual launch event, picture from a local pressure group's twitter here.
I believed, it now seems wrongly, that some Oxford vehicles would replace the oldest buses used to expand services in Bournemouth and Southampton as a result of Yellow Buses and First no longer there to run local services.
I believed, it now seems wrongly, that some Oxford vehicles would replace the oldest buses used to expand services in Bournemouth and Southampton as a result of Yellow Buses and First no longer there to run local services.
I believed, it now seems wrongly, that some Oxford vehicles would replace the oldest buses used to expand services in Bournemouth and Southampton as a result of Yellow Buses and First no longer there to run local services.
Go South Coast have a large number of new E400 MMCs either delivered or on order - 35 already received (28 to Bournemouth/Poole, 7 to Southern Vectis) with another 44 or so (as I recall, 20 to Bournemouth/Poole and 24 to Southampton - the numbers may not quite be correct) due this spring. The various cascades from these will see off most of the oldest vehicles recently kept on.
Go South Coast have a large number of new E400 MMCs either delivered or on order - 35 already received (28 to Bournemouth/Poole, 7 to Southern Vectis) with another 44 or so (as I recall, 20 to Bournemouth/Poole and 24 to Southampton - the numbers may not quite be correct) due this spring. The various cascades from these will see off most of the oldest vehicles recently kept on.
Go South Coast have a large number of new E400 MMCs either delivered or on order - 35 already received (28 to Bournemouth/Poole, 7 to Southern Vectis) with another 44 or so (as I recall, 20 to Bournemouth/Poole and 24 to Southampton - the numbers may not quite be correct) due this spring. The various cascades from these will see off most of the oldest vehicles recently kept on.
According to buslistsontheweb.co.uk, the GB Kites registrations have been identified. They are as follows:
491 - BJ73WXD
492 - BJ73WXE
493 - BJ73WXF
494 - BJ73WXG
495 - BJ73WXH
== Doublepost prevention - post automatically merged: ==
New Post / Update (13th of January 2024)
According to buslistsontheweb.co.uk, Wrightbus StreetDeck Electroliner 722 has been assigned BJ73WXK. The open top versions have been identified as the following:
3 more of the 700 series Wrightbus StreetDeck Electroliners have now been recorded on buslistsontheweb.co.uk. The registrations are the following:
723 - BJ73WXL
724 - BJ73WXM
725 - BJ73WXN
491 (the Bicester Village-branded GB Kite) is out today for the first time on the 400 (bustimes.org) - hopefully the other Kites are to follow shortly. All of the Brookes electroliners (701-721) have been out for a while now - they don't seem to be quite enough to reliably cover the semester 400 timetable, as a couple of the newest diesels are still seen each day. 722 is the only electricity-branded electroliner that's been out so far, but hasn't tracked on bustimes.org since Saturday.
3 more of the 700 series Wrightbus StreetDeck Electroliners have now been recorded on buslistsontheweb.co.uk. The registrations are the following:
723 - BJ73WXL
724 - BJ73WXM
725 - BJ73WXN
There is now another 3 of the Wrightbus StreetDeck Electroliners confirmed, again taken from buslistsontheweb.co.uk, which are:
726 - BJ73WXO
727 - BJ73WXP
728 - BJ73WXR
== Doublepost prevention - post automatically merged: ==
New Update (4th of February, 2024)
Two more of the Wrightbus StreetDeck Electroliners registrations have been identified, again as per buslistsontheweb.co.uk.
729 - BJ73WXS
730 - BJ73WXT
889 will return to Carousel in due course, however the inspections of the Volvo hybrids by TfGM are continuing this week meaning we have some of those off the road. 890 and 891 are now at Carousel following repaint and vinyls have been ordered for all three of these. They are to be allocated to Route 1.
723 - >The recently delivered new buses still need Wrightbus to attend to some delivery defects before they can enter service. I am hoping this will be before the end of next week.
351-369 None of the hybrids have travelled to Manchester yet, but some have been withdrawn from service in anticipation of transferring. We also need to ensure these buses have sufficient MOT when they transfer, as part of the vehicle sale & purchase agreement associated with Manchester franchising and so there is a need for some of this batch of buses to be MOT prepped and tested over the coming weeks. We anticipate that all will have left us by around this time next month.
There is now another 3 of the Wrightbus StreetDeck Electroliners confirmed, again taken from buslistsontheweb.co.uk, which are:
726 - BJ73WXO
727 - BJ73WXP
728 - BJ73WXR
== Doublepost prevention - post automatically merged: ==
New Update (4th of February, 2024)
Two more of the Wrightbus StreetDeck Electroliners registrations have been identified, again as per buslistsontheweb.co.uk.
729 - BJ73WXS
730 - BJ73WXT
723 - >The recently delivered new buses still need Wrightbus to attend to some delivery defects before they can enter service. I am hoping this will be before the end of next week.
There are now 11 of the double-deck 'electricity' electroliners in service (722-729, 732, 733, 735). The priority allocation for these seems to generally be 700, followed by 300 and 15. Of the single-decks, 492, 493 and 495 have all seen service, mostly on the 11X with some gapfilling on the 400 and 700. This has allowed the removal from service of more of the Geminis and E400s, with several not seen for a few days or more. (All of this from bustimes.org or personal observation)
== Doublepost prevention - post automatically merged: ==
Update as of 07/03: Several changes registered on bustimes.org for both Oxfordshire operations - I've summarised what there is in the table below - this is in addition to timetable changes on 5, 6, 8, 35, 43, X1, X32, X34, ST1 and some school services. X40 has already been announced as recieving BSIP-funded enhancements, not sure if this is frequency increase or just extra evenings/Sundays. Of the rest, looks like the 136 and the X35 are both being split in Wantage and Wallingford respectively, but can't make out much of the rest, would appreciate anyone who could enlighten me!
PH0007184/97
X2
Oxford City Centre, Westgate
Didcot,Orchard Centre
Didcot Parkway Station, Abingdon
Route, timetable and bus stop/stopping places variation
PH0005727/2
X3
Barton, Atkinson Close
Market Place, Wantage
John Radcliffe Hospital, Oxford
Timetable, route and bus stop/stopping place variation
PH0007184/112
X35
Didcot, Broadway
Market Place, Wantage
Harwell Campus, Wantage
Timetable, route and bus stop/stopping place variation
PH0007184/147
X36
Didcot, Tesco Depot
Becquerel Avenue, Harwell Campus
Milton Park, Grove
Timetable, route and bus stop/stopping place variation
PH0007184/143
44
Oxford, Botley Road
Abingdon, High Street
Didcot, Milton Park, Culham, Abingdon
Timetable variation (previously no. 33)
PH0007184/169
67
Market Place, Wantage
Market Place, Faringdon
East Challow, Stanford in the Vale & Shellingford
New registration
PH0007184/72
136
St Mary's Street, Wallingford
St Martin's Street, Wallingford
Wallingford
Timetable, route and bus stop/stopping place variation
There are now 11 of the double-deck 'electricity' electroliners in service (722-729, 732, 733, 735). The priority allocation for these seems to generally be 700, followed by 300 and 15. Of the single-decks, 492, 493 and 495 have all seen service, mostly on the 11X with some gapfilling on the 400 and 700. This has allowed the removal from service of more of the Geminis and E400s, with several not seen for a few days or more. (All of this from bustimes.org or personal observation)
== Doublepost prevention - post automatically merged: ==
Update as of 07/03: Several changes registered on bustimes.org for both Oxfordshire operations - I've summarised what there is in the table below - this is in addition to timetable changes on 5, 6, 8, 35, 43, X1, X32, X34, ST1 and some school services. X40 has already been announced as recieving BSIP-funded enhancements, not sure if this is frequency increase or just extra evenings/Sundays. Of the rest, looks like the 136 and the X35 are both being split in Wantage and Wallingford respectively, but can't make out much of the rest, would appreciate anyone who could enlighten me!
The X35/67 extension had a hard winter - there is one particular point on the road between Wantage and Stanford that is prone to flooding even without extreme weather....and this winter it has been flooded a lot, often resulting in a shuttle operation running in a rather convoluted route between Wantage and Faringdon to protect the rest of the X35 from being affected by the ensuing delays.
I'm puzzled by the reference to the revived 67 going to Shellingford (if they mean Shellingford Village, rather than just the A417). Pre-2016 one of the (very infrequent) varieties of the 67 did, I think, go there, but it is also one of the villages missed by the new Pulhams 68 that effectively has restored most of the operations provided by the old 67/A/B/C group. I don't know if that implies a diversion from the current main road routing or not.
Looks like the X36 gets an extension east from the new Kingsgrove development on the eastern side of Wantage to Harwell Campus. No doubt makes sense in terms of connecting homes with workplaces. And I presume the extension of the X3 to Wantage is intended to restore a direct link to the JR Hospital in Oxford that was lost when the X32 was cut short at Didcot (and the X1 diverted away from another hospital nearby instead to go to Oxford Station). Will be interested to see how the X3 and X1 will inter-relate, and on what frequencies - not least given their varying routings in Abingdon now.
Not sure what to make of the reference to Culham in the new 44, unless it is going to loop via Culham (science centre + village too?) after passing through Abingdon before returning to terminate there?
I suspect the 33/44 has been inputted wrong - it's only down as a timetable change, so reckon it may well be staying as it is now. The X3 to Wantage is the bit that's most puzzling for me, if that is correct info the reliability is going to be horrifying on a route that length.
Update as of 07/03: Several changes registered on bustimes.org for both Oxfordshire operations - I've summarised what there is in the table below - this is in addition to timetable changes on 5, 6, 8, 35, 43, X1, X32, X34, ST1 and some school services. X40 has already been announced as recieving BSIP-funded enhancements, not sure if this is frequency increase or just extra evenings/Sundays. Of the rest, looks like the 136 and the X35 are both being split in Wantage and Wallingford respectively, but can't make out much of the rest, would appreciate anyone who could enlighten me!
Also appears to be a cancellation of the ST2 listed here, which I'm not sure was expected?
I'd assume we'll see similar registrations for Stagecoach on the 1 and 8 coming through soon, maybe for the 8 some adjustments due to the new traffic patterns following the St Clements bus lane have becoming more clear.
Looks like the X36 gets an extension east from the new Kingsgrove development on the eastern side of Wantage to Harwell Campus. No doubt makes sense in terms of connecting homes with workplaces. And I presume the extension of the X3 to Wantage is intended to restore a direct link to the JR Hospital in Oxford that was lost when the X32 was cut short at Didcot (and the X1 diverted away from another hospital nearby instead to go to Oxford Station). Will be interested to see how the X3 and X1 will inter-relate, and on what frequencies - not least given their varying routings in Abingdon now.
Agreed with the X36 making sense, but not sure how viable such a route would be once funding is cut, especially considering the overprovision of buses on the A417 at times. I believe at one point recently the Wantage-Harwell corridor was threatened with being reduced to hourly, but I guess we'll just see a continuation of the never-ending changes to Oxford Bus/Thames Travel network! Good to see numbers on the current X36 picking up last time I was around Wantage/Grove though, definitely a route that's been needed for a while.
Changes to the X1 and X3 will be interesting to see - as highlighted by others I can't see an extended X3 being any good for reliability, going through some of the most congested parts of the county right now (the JR, St Clements, Abingdon Road and Abingdon Town Centre). I wonder if this could also impact on the X1, as I would be insurprised if there is interworking due to the journey time between Abingdon and Wantage and the fact that 2bph is really all that's needed on this section. Certainly can't imagine this being too popular a change for most even though it restores the links to the JR - such a link might be better established as part the proposed Eastern Arc between the JR, Cowley and Abingdon.
Not sure what to make of the reference to Culham in the new 44, unless it is going to loop via Culham (science centre + village too?) after passing through Abingdon before returning to terminate there?
Also appears to be a cancellation of the ST2 listed here, which I'm not sure was expected?
I'd assume we'll see similar registrations for Stagecoach on the 1 and 8 coming through soon, maybe for the 8 some adjustments due to the new traffic patterns following the St Clements bus lane have becoming more clear.
Good spot r.e. ST2 - would be deeply frustrating for me as I use it every day and it always seems to have respectable enough loadings, hoping something comes through to replace it! Expecting some other changes from Stagecoach as BSIP+ funding is coming through, but nothing public on that yet, and beyond the remit of this thread.
Great, thanks - makes more sense than the current arrangement as it's mostly operated with Oxford vehicles anyway (hopefully the electrics soon, but still mostly minibuses for now).