6R03 - Autoballaster derailment at Mitre Bridge Junction during possession

Status
Not open for further replies.

Future

Member
Joined
28 Nov 2021
Messages
235
Location
Devon
6R03 has derailed across WM2340a points at Mitre Bridge Junction. There is OLE gantry damaged reported. Service suspended Willesden Junction HL - Clapham Junction. S&T have identified damage to WM2340 points and are recovering spares. Source: internal logs
 

Attachments

  • IMG_20240121_121110_521.jpeg
    IMG_20240121_121110_521.jpeg
    45.9 KB · Views: 1,008
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

800001

Established Member
Joined
24 Oct 2015
Messages
7,382
Looks to be an odd alignment for the train, even when derailed - was it reversing/top and tailed?
Looks like it’s derailed over a set of points, front of train gone straight on, rear part attempted to go to the left
 

156412

New Member
Joined
21 Jan 2024
Messages
1
Location
Worcester
3 Auto Ballaster wagons derailed whilst a propelling movement was being undertaken. Points have been ran through and OLE gantry damage.
 

Future

Member
Joined
28 Nov 2021
Messages
235
Location
Devon
I see the area around mitre bridge is still under T3. Any idea when things might reopen?
The possession has been shortened to the area around the affected train and line is expected to be handed back sometime tomorrow. All Southern service through the area is suspended until End of Service Monday 22 Jan.
 

Highview

Member
Joined
22 Aug 2023
Messages
77
Location
London
When I was there this afternoon the Overground was running a half hourly shuttle from Clapham Junction to Shepherds Bush, the remaining Stratford to Clapham Junction trains are diverted into Richmond. Expect overcrowding tomorrow - the Overground driver on my train said the line would be out for a few days.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,382
When I was there this afternoon the Overground was running a half hourly shuttle from Clapham Junction to Shepherds Bush, the remaining Stratford to Clapham Junction trains are diverted into Richmond. Expect overcrowding tomorrow - the Overground driver on my train said the line would be out for a few days.
Reports I’ve seen suggest at least one wagon will take 24 hours to lift/remove. Also a specialist team to attend to the leaving OHL structure which a wagon is resting on.
Once the 3 derailed wagons are removed, then obviously infrastructure needs attending to.
I would expect late tues possibly Wednesday before it’s fully open.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,382
No chance. Happened in a possession, during work, no injuries, minor damage. Not the sort of thing RAIB is remotely intersted in.
They are not attending, but want all downloads and investigation documents forwarding to them.
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,818
Location
West is best
Confirmed as the S&C being run through.
A run through of points does mean that the ES (in a worksite) or PICOP (outside a worksite) were not doing their job properly (making sure all points are set correctly before authorising any movement). And the driver of the train did not check that the points were set in the correct position before proceeding over them.
 

knightrider89

New Member
Joined
22 Jan 2024
Messages
1
Location
Southend
A run through of points does mean that the ES (in a worksite) or PICOP (outside a worksite) were not doing their job properly (making sure all points are set correctly before authorising any movement). And the driver of the train did not check that the points were set in the correct position before proceeding over them.
This was inside a worksite,
 

Dunfanaghy Rd

Member
Joined
16 Sep 2019
Messages
466
Location
Alton, Hants
Looks like points have moved beneath the wagon that is sitting at 90degrees
The same thing happened under a works train at International Junction, Waterloo, in 2017. After the August fiasco of the passenger train being routed into the side of a works train I contacted RAIB about it. The reply was that they were aware of the earlier incident. I do wonder if the same finger trouble was to blame?
Pat
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,499
The same thing happened under a works train at International Junction, Waterloo, in 2017. After the August fiasco of the passenger train being routed into the side of a works train I contacted RAIB about it. The reply was that they were aware of the earlier incident. I do wonder if the same finger trouble was to blame?
Pat

Another potential complication in this case is that Mitre Bridge Junction is the boundary point between
Wembley and Three Bridges signalling centres, although I understand that the junction points themselves
are controlled from Wembley.




MARK
 

Boodiggy

Member
Joined
8 Nov 2012
Messages
642
The same thing happened under a works train at International Junction, Waterloo, in 2017. After the August fiasco of the passenger train being routed into the side of a works train I contacted RAIB about it. The reply was that they were aware of the earlier incident. I do wonder if the same finger trouble was to blame?
Pat
That was a different issue.
At Mitre Bridge the points were run through in the trailing direction by the loco and front three Autoballaster wagons. When it started moving the other way (facing direction) the part of the train that run through the points went on a different line to the rest of the train. The cause at Waterloo was they were wired incorrectly.

== Doublepost prevention - post automatically merged: ==

Another potential complication in this case is that Mitre Bridge Junction is the boundary point between
Wembley and Three Bridges signalling centres, although I understand that the junction points themselves
are controlled from Wembley.




MARK
They are - prefix WM.
This area also meets with Upminster SCC on the high level lines
 

Signal Head

Member
Joined
26 May 2013
Messages
460
Looks like points have moved beneath the wagon that is sitting at 90degrees
Not necessarily. The points have reportedly been 'run through' ie a trailing movement has taken place with the points set in the wrong lie.

Now set back - the points (now facing) will still be lying as previously set, or possibly not fitting up at all, depending on the type of point operating equipment fitted and the weight of what has committed the run-through.
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,818
Location
West is best
Powered points that have been run through (in the trailing / converging direction) will cause problems if the train reverses and now moves in the opposite (facing / diverging) direction. Depending on how bad the damage is, axles may go in the position (direction) the points were last commanded (which is not the line it would have come from) or they may derail.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,587
Location
Neilston, East Renfrewshire
Powered points that have been run through (in the trailing / converging direction) will cause problems if the train reverses and now moves in the opposite (facing / diverging) direction.

Yes indeed! One I was involved was an engineering train which left a possession without authority and ran through switch diamonds. That was bad enough, but then well-meaning staff on site authorised the train to set back to clear the line, promptly derailing it.
 