Good luck reversing anything in the platforms at Woolwich.Is it theoretically possible to create an extra loop from Greenwich to blackheath, by turning around at woolwich?
Dlr+train, 386 bus, in practice always around the same as just walking across the park, around 40 mins. Its ok but not greatAs a former resident of the Woolwich-Plumstead area, I have to ask what would be the point of such an 'extra loop'?
As far as I am aware there is no cross-over at Woolwich, the nearest being at Plumstead.
An alternative is simply for passengers to change trains at Charlton, but I suspect a bus from Greenwich to Blackheath is likely to be faster?
That's a problem with SE's timetabling, not track capacity. It was better before and it can be better again.Massive amount of developments in the whole area and train frequency has gone down instead of up. Like almost half hour gap at Greenwich, seriously?
Quite simply, because: a) SE don't send empty trains from GRV/DFD: they run in passenger service and b) The cost of adding a bay platform at Woolwich Arsenal is much, much higher than SE doing a spot of retimetabling (not that they ever will).But if you agree a more frequent service is desirable, and in the end appreciate these things are all cost driven, why not add this additional 'metro-service' instead of sending empty trains from blackheath to gravesend/dartford?
Steve White, the SE Rail MD, posted on Twitter/X a while ago that the Greenwich line will revert back to a better spaced timetable come the June 24 timetable changes.That's a problem with SE's timetabling, not track capacity. It was better before and it can be better again.
#bringbacktheGillinghamsemi-fasts
What was this used for in the past? The cutting and bridges all appear designed for 3-4 tracks for some distance.
Did someone say central reversing siding?However as a bit of speculation, a third platform at Woolwich A isn't a goer but there's space between Woolwich A and Plumstead for extra tracks (not a platform).
What was this used for in the past? The cutting and bridges all appear designed for 3-4 tracks for some distance.
Apart from the fact the curve would be extremely tight, there's a car pound and another rail line in the way, plus Lewisham can't handle any extra trains, yeah, sounds good to me...Just add this?
The Angerstein branch line is in the way, as is a Met Police car pound. The land could well be developed in the coming years as well.Just add this?
That's brilliant thank you. You're right it didn't extend each as much as I thought and only a couple of hundred metres.1897 and 1957 OS maps show additional tracks as far east as Maxey Road, presume as part of the sidings / headshunt arrangement at Woolwich Arsenal, as well as what appear to be bay platforms on both sides at the east end of Woolwich Arsenal Station.
I'm not sure about the bridges etc further east being designed for 3 / 4 tracks. It's hard to get on Street View, but this shows Ann Street bridge which doesn't look like it's got room for an extra track.
Plumstead had a bay platform on the south / up side, which according to Kent Rail was taken out of use when the suburban services were electrified in 1926 - it also mentions two sidings to the west of the station for loco stabling, taken out of use at the same time, but these don't show on any OS maps.
M'lud, this appeal does not contain any advanced technical analysis, so I shouldn't have to answer it. I do? Really? Fine... It's not too tight a curve, it's the fact that it would likely need a 15mph speed restriction and it's in a residential area - not many people like flange squeal at 5am - and I speak from experience.-as the advanced technical analysis attached shows, the curve would be the same as at london bridge so doable,
If you can give them a suitably-sized (several hundred cars by the looks of it), then perhaps they'll budge.- just buy out the police car pound/make a comprehensive plan during redevelopment.
Yes they can. Some of the land is empty, and can therefore be redeveloped. Also, can you buy out the car pound if the developer has beaten you to it?The 2 arguments can not both be correct, it either is not possible because of the car pound that cant be bought out, or because development has already been planned.
Angerstein were not available for comment, but- angerstein not used anymore for anything important
It's not about Lewisham station; it's about its nearby Diamondland (crossover edition), which was at capacity (until SE simplified it in December 22) and is a single point of failure. It can't handle more trains.- Lewisham platform 4 sees no frequent trains at all.
So deprive Charlton, Woolwich, Plumstead, Abbey Wood and Slade Green of peak-time services? Not gonna go down well, I'm afraid.But if a problem just send every other train at current frequency back via this route. compensate with more london bound.
As pointed out in post #13, there is non-railway land that would need to be purchased. (It was once a large railway depot for signals, established by the SER before it was sold off by BR.) The curvature is also too tight for passenger rolling stock to move at any useful speed.Just add this?
There was no bay platform at Woolwich Arsenal station. On the south side of the line there was an extensive siding with cattle/horse unloading/loading facilities. Cattle were unloaded here for a Royal Arsenal Co-Op Society abattoir a couple of miles away near Plumstead Common. The horse usage was well-used in WW1 in particular for entraining horse artillery from the Royal Artillery barracks on Woolwich Common.
The 1916 edition of the OS 25":1mile map shows both the bay platform and at the west end of the cutting two short sidings accessed from the bay line with a stage between them - I believe this is the loco servicing facility.I'm not sure about the bridges etc further east being designed for 3 / 4 tracks. It's hard to get on Street View, but this shows Ann Street bridge which doesn't look like it's got room for an extra track.
Plumstead had a bay platform on the south / up side, which according to Kent Rail was taken out of use when the suburban services were electrified in 1926 - it also mentions two sidings to the west of the station for loco stabling, taken out of use at the same time, but these don't show on any OS maps.
It's in use most days for aggregate movements which otherwise might end up on the roads.- angerstein not used anymore for anything important....