From discussions we had with the tech guys in the very early testing days all the sets have the background wiring and sockets for ERTMS (hence why it comes up on the TMS as a fault) and that it's more of a "laptop job than a workshop job" to install/remove ERTMS, so the fleet shouldn't be set in stone if it is decided to change it.
Yes. Have heard they’re all ETCS-ready but good to hear that it should be that easy to add or takeaway from any unit.I've been making this point since the 197s were ordered to show that they're not going to single handedly destroy the entire Cambrian coast line. Some people still don't believe me...
Having worked it as a guard, I think most of the services on the Cambrian coast during summer should be minimum 3 cars (2 are just silly busy any day where it’s even reasonably nice) with at least the 10:55 from Mach running as a 4 car (as it did a few times this summer). Even 3 cars between Mach and Aberystwyth would be good. So 6 from shrewbury split at Mach with 3 going each way seems sensible.Could make sense to get some 3s over on the Cambrian particularly in Summer though
I’ve taken over £700 on just one trip between Mach and Pwllheli before so guards selling tickets is still big up there, that was on top of 150 ticket scans and what ever card style tickets I checked.
Having a 3 as opposed to 4 on the coast would also make the guards life easier due to the number of platforms that won’t accommodate 4 cars and the requirement to be at specific doors for stops only 2 or 3 minutes apart.
If TW just plan to run more of them as 4 cars then I’d see that as a reasonable plan equally to save the hassle of getting 3 cars up there. my understanding is it’s still just planned to be 2 cars on the coast services though.
I had heard that they weren’t keen on 3’s in the Cambrian as the depot had to be extended to accommodate the 2 car 197’s and wouldn’t fit the 3 cars.