The whole of Euston's buildings should be quickly removed and fully rebuilt, not waiting for HS2 or the Armageddon. Should be two large sets of barriers for 1-10, and one for 11-16+ i.e. until HS2 is built. Urgently should totally demolish all the SSP junk at the ramp tops.
The tight turnaround times don't help. Euston's old platform 17 (the two-faced solution) was a good one. Let passengers down as soon as the train is in on the B side with doors shut, get the passengers off the A-side. Shut A. Clean the train quickly. Ping open the B side doors - very handy for larger trains with (unworkable) 14 minutes spin times.
These sensible ideas will likely fly past someone on a desk and instead come out with some Mandatory Reservations nonsense instead, which belongs solely at Kings X.
As an emergency interim measure, there should be mandatory ticket checks for ALL trains AWC, LO & LNR at Euston, with the platform announced a minimum of 20 minutes before, with ramp bottom gates locked until say 10 mins before, with a steady ticket check when ready and instructed by the train crew / Duty Ops Manager - this would throttle the runners from going crazy.
Dangerous boarding procedures at Euston
Whilst waiting for my train, the 16:46 from Euston to Crewe, passengers were told not to wait around the platform entrances and were to told to wait in the concourse, by the third party security officers. At around 16:40, the platform was announced and hurds of people immediately started...
The whole of Euston's buildings should be quickly removed and fully rebuilt, not waiting for HS2 or the Armageddon. Should be two large sets of barriers for 1-10, and one for 11-16+ i.e. until HS2 is built. Urgently should totally demolish all the SSP junk at the ramp tops.
The tight turnaround times don't help. Euston's old platform 17 (the two-faced solution) was a good one. Let passengers down as soon as the train is in on the B side with doors shut, get the passengers off the A-side. Shut A. Clean the train quickly. Ping open the B side doors - very handy for larger trains with (unworkable) 14 minutes spin times.
These sensible ideas will likely fly past someone on a desk and instead come out with some Mandatory Reservations nonsense instead, which belongs solely at Kings X.
As an emergency interim measure, there should be mandatory ticket checks for ALL trains AWC, LO & LNR at Euston, with the platform announced a minimum of 20 minutes before, with ramp bottom gates locked until say 10 mins before, with a steady ticket check when ready and instructed by the train crew / Duty Ops Manager - this would throttle the runners from going crazy.
Last edited by a moderator: