• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

19/12/23 Not a great day for the ECML

Status
Not open for further replies.

yoyothehobo

Member
Joined
21 Aug 2015
Messages
854
Looks like a southbound service has sat down at Grantham (now labelled as 5D05) and they have stacked the heavily delayed 1A02 into platform 4 at Grantham. Unfortunately this looks like it has blocked 1R82 (Norwich - Liverpool) on the Down fast as this needs to use platform 4 to leave the East Coast Main Line. This is now blocking 1B80 and the Down lines on the ECML. Pretty much every Up platform on the ECML is stacked with trains in platforms.

I believe 1Z99 is on its way to pick up the stranded train at Grantham, but this is causing chaos.

View attachment 148792

As i write this 1A02 has finally left platform 4 after probably at least half an hour there and is carrying on Southwards.

== Doublepost prevention - post automatically merged: ==

View attachment 148793
Ok, still confused here unless 1Z99 is the mystery causing the problem
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,292
What happened to this service? If it is the problem it could explain why it’s taken so long to sort? https://www.realtimetrains.co.uk/service/gb-nr:C28947/2023-12-19/detailed#allox_id=0

As this EMR from Nottingham to Peterborough got cancelled at Grantham and worked back to Nottingham ECS.

 

62484GlenLyon

Member
Joined
30 May 2021
Messages
297
Location
Royston
1Y00, 04.40 York to Kings Cross, today starting at Doncaster, seems to be the problem. RTT shows this leaving Grantham at 05.55 and nothing since. At about 08.45 1Z99 was shown on OTT on the two track section just north of Stoke Tunnel and moved to the present position soon after 09.00.
 

yoyothehobo

Member
Joined
21 Aug 2015
Messages
854
I think 1Y00 was the problem sat on the Up fast just onto the twin track section looking at what you have both posted
 

TreacleMiller

Member
Joined
22 Feb 2020
Messages
537
Location
-
1Y00 Hit a very large lump of concrete on the railhead. VMS triggered and subsequently brought down to a stand.

Picture of said concrete circulating internally and it's a good old lump to have tumbled into the up.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,292
An interesting working as a result, an 8 car EMR 158


Can't stop at a few stations on route.

I’m not sure this is related to be honest. Not sure why the 1051 off Lime St was cancelled but can’t see how it’d be this disruption. RTT says ‘due to late arrival of incoming service’ which I assume relates to another arrival as it’s inbound working arrived on time. If I had to guess, I’d say it was impacted by the 0637 Nottingham to Liverpool failing at Sheffield https://www.realtimetrains.co.uk/service/gb-nr:C55123/2023-12-19/detailed
 

louis97

Established Member
Joined
14 May 2008
Messages
2,154
Location
Derby
I’m not sure this is related to be honest. Not sure why the 1051 off Lime St was cancelled but can’t see how it’d be this disruption. RTT says ‘due to late arrival of incoming service’ which I assume relates to another arrival as it’s inbound working arrived on time.
Typically during the day some crew have over an hour in Liverpool between workings. The 0929 arrival into Liverpool was cancelled, so suggests therefore no crew for the 1051 departure. Seems unconnected to the disruption on the ECML, as the 0929 arrival terminated at Sheffield with a train fault.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,809
Location
Central Belt
That is unfortunate that 2 trains can be wiped out by 1 train failure. But just looking again and the ones that were caught up seemed to have restarted at Nottingham.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,385
1Y00 Hit a very large lump of concrete on the railhead. VMS triggered and subsequently brought down to a stand.

Picture of said concrete circulating internally and it's a good old lump to have tumbled into the up.
It wasn’t concrete, it was strail (which I believe is very heavy rubber) from road rail vehicle access point which 1Y00 hit.

== Doublepost prevention - post automatically merged: ==

Looks like a southbound service has sat down at Grantham (now labelled as 5D05) and they have stacked the heavily delayed 1A02 into platform 4 at Grantham. Unfortunately this looks like it has blocked 1R82 (Norwich - Liverpool) on the Down fast as this needs to use platform 4 to leave the East Coast Main Line. This is now blocking 1B80 and the Down lines on the ECML. Pretty much every Up platform on the ECML is stacked with trains in platforms.

I believe 1Z99 is on its way to pick up the stranded train at Grantham, but this is causing chaos.

View attachment 148792

As i write this 1A02 has finally left platform 4 after probably at least half an hour there and is carrying on Southwards.

== Doublepost prevention - post automatically merged: ==

View attachment 148793
Ok, still confused here unless 1Z99 is the mystery causing the problem
1A02 was going to wrong line platform 4 at Peterborough to Stoke Junction, however this was communicated to signaller in a timely manner, so 1R82 was already routed towards Grantham.

1A04 terminated at Grantham to form 1D05 starting at Grantham, 5D05 was the head code for the shunt.

1Z99 was 47 from Newark which attached to rear of 1Y00 and hauled the service back to Grantham where it terminated and then went ecs to Neville Hill.

== Doublepost prevention - post automatically merged: ==


== Doublepost prevention - post automatically merged: ==

So was it the concrete that was the problem or was it the subsequent activation of the vibratey detecty system?
It was the obstacle on the line that was the issue, causing multiple alarms and alerts on the train and also a damaged traction motor.
 
Last edited:

sjm77

Member
Joined
8 Jan 2020
Messages
341
Location
Manchester
Looks like a southbound service has sat down at Grantham (now labelled as 5D05) and they have stacked the heavily delayed 1A02 into platform 4 at Grantham. Unfortunately this looks like it has blocked 1R82 (Norwich - Liverpool) on the Down fast as this needs to use platform 4 to leave the East Coast Main Line. This is now blocking 1B80 and the Down lines on the ECML. Pretty much every Up platform on the ECML is stacked with trains in platforms.
The signalling and layout at Grantham didn't help. Platform 2 can only normally be used by Northbound ECML services. Once you stack a Southbound ECML service into Platform 4 then the Liverpool to Norwich services are screwed and everything caught behind them as you witnessed. A starting signal southwards on Platform 2, or a crossover from Platform 2 to the Nottingham line would have been useful this morning. Although the latter maybe tricky given the cant of the Down Main.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,879
Location
East Anglia
The signalling and layout at Grantham didn't help. Platform 2 can only normally be used by Northbound ECML services. Once you stack a Southbound ECML service into Platform 4 then the Liverpool to Norwich services are screwed and everything caught behind them as you witnessed. A starting signal southwards on Platform 2, or a crossover from Platform 2 to the Nottingham line would have been useful this morning. Although the latter maybe tricky given the cant of the Down Main.

Always wondered why Grantham is such a pigs ear of a station and why it’s never been remodelled. Recent work has been like for like with crossovers at the same low speeds. Longer trains on the Skegness route also prohibit them from using the bay.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,292
Always wondered why Grantham is such a pigs ear of a station and why it’s never been remodelled. Recent work has been like for like with crossovers at the same low speeds. Longer trains on the Skegness route also prohibit them from using the bay.

Indeed. When Grantham/the ECML has issues they just skip Grantham and wait time at the next stop. Unfortunately for 1R82 today that meant after picking up a 35 min delay at Grantham, it got held again outside Bottesford due to the ex-Skegness 170 waiting time after skipping Grantham!
 

TreacleMiller

Member
Joined
22 Feb 2020
Messages
537
Location
-
Was definitely reported as a concrete lump. Not my image but here's the remnant of it anyway.

Certainly rubber, with something more solid looking attached.
 

Attachments

  • IMG-20231219-WA0001~2.jpg