• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Varamis Rail Given Operators Licence from ORR

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,685
I mean they could have it on a week by week rolling contract with planned engineering being negotiated at least 6 months in advance and emergency engineering clauses which have detailed triggers which gives a refund to them.
They are a timetable participant, so can respond to and dispute the engineering access statement entries and CPPP like any other operator.
 

Skimpot flyer

Established Member
Joined
16 Nov 2012
Messages
1,937
It seems Varamis Rail will be running a parcels train into and out of Royal Mail’s distribution centre in Willesden as of 3 January 2024.
There’s an outbound departure from PRDC at 21:36, and a daily arrival at 01:04
I know RM have a rail-connected super hub in the Midlands, but it’s certainly not adjacent to Birmingham International station !
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,622
Location
South Staffordshire
It seems Varamis Rail will be running a parcels train into and out of Royal Mail’s distribution centre in Willesden as of 3 January 2024.
There’s an outbound departure from PRDC at 21:36, and a daily arrival at 01:04
I know RM have a rail-connected super hub in the Midlands, but it’s certainly not adjacent to Birmingham International station !
Presume that connects out of, or formed off the Mossend - BHI ?

Perhaps actually Mossend - PRDC calling BHI
 

Skimpot flyer

Established Member
Joined
16 Nov 2012
Messages
1,937
I think you are correct.
There’s an arrival booked for the same Platform (1) at Birmingham International from Mossend at 22:21.
The operator is also Varamis Rail

 

172007

Member
Joined
2 Jan 2021
Messages
1,154
Location
West Mids
Strange for extra services post Christmas but it also suggests a long term flow. Customers must be happy with the service.

They must have at least one additional unit now.

== Doublepost prevention - post automatically merged: ==

321419 was added to their fleet 5th December 2023.

Source is their X feed ( haven't gotca clue how to merge those)
 
Last edited:

Skimpot flyer

Established Member
Joined
16 Nov 2012
Messages
1,937
Seems in fact that this new service begins next week!
There is a service to/from PRDC next Tuesday, 12 December.
Curiously, there is a 21:36 departure listed for Monday 11th… but no arrival, to form the outbound trip !

 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
I did read somewhere that a load of class 321s are being scrapped because there isn't the market to convert them. I'll try find the source.
 

Skimpot flyer

Established Member
Joined
16 Nov 2012
Messages
1,937
I did read somewhere that a load of class 321s are being scrapped because there isn't the market to convert them. I'll try find the source.
Varamis need to move quickly.
There is a window of opportunity for them because DB Cargo’s 325 units are having problems on a regular basis.
Just yesterday, the 16:16 departure from PRDC had to be cancelled and all the Mail containers offloaded.
This on top of the train being short-formed (of only 2 units) and a very late inbound arrival from Crewe!
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,808
Varamis need to move quickly.
There is a window of opportunity for them because DB Cargo’s 325 units are having problems on a regular basis.
Just yesterday, the 16:16 departure from PRDC had to be cancelled and all the Mail containers offloaded.
This on top of the train being short-formed (of only 2 units) and a very late inbound arrival from Crewe!
Strictly speaking, the 325s are Royal Mail’s but maintained and operated by DB Cargo.
 

Guano

Member
Joined
11 Oct 2023
Messages
14
Location
London
As noted above, the extension of the Mossend to Birmingham International service to Willesden PDRC and the starting of the Birmingham International to Mossend service from Willesden PDRC appear to start tomorrow (11th December).

These appear to run Monday to Friday until Xmas, one day between Xmas and New Year and then from 2nd January. The times from Birmingham International to Mossend appear not to be shown from 2nd January, but that may be an error.
 

Skimpot flyer

Established Member
Joined
16 Nov 2012
Messages
1,937
Is it at all possible that these paths have been secured ahead of an actual service starting?
Neither the Late or Night Shift managers knew anything about these trains when I brought the subject up on Friday.
(This is not an unusual state of affairs, as anyone who has ever worked in Royal Mail will attest!)
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
776
Location
Doncaster
Is it at all possible that these paths have been secured ahead of an actual service starting?

The main timetable change was on 10th December, so there are a lot of WTT schedules with dates starting 11/12/23. This would be the date the services are officially added into the regular timetable, rather than a firm start date for the services themselves (I don't have any info on that).

Last night the service ran from Mossend to Birmingham as 1Z07 and back north as 1Z56, running earlier than the WTT paths.
 

172007

Member
Joined
2 Jan 2021
Messages
1,154
Location
West Mids
Class 68's with Mk5A carriages with seats removed.

Oh come on, since the class 442's have been scrapped we've needed a replacement tedious joke about vehicles that can be loco hauled and suitable for everything; plus the Mk5's come with a loco as a complete package.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,409
Especially as it was spelt correctly four times on the page copied into the announcement.
Someone has settings equals English(United States) lol.....

== Doublepost prevention - post automatically merged: ==

Varamis Rail tweeted (X-ed?) yesterday that ‘We have some news about more trains coming soon!! Watch this space…..’
Interesting.....

Are the 325s not essentially just 319/321s with a 365-style front end anyway.

If so surely there should be abundant spares available for them given the amount of MK3 EMUs scrapped.
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,359
Location
Back in Sussex
I understand they have secured a second unit, no doubt the official announcement will be along soon ......
 

jagardner1984

Member
Joined
11 May 2008
Messages
763
Given there was much scepticism on the viability of the operation on launch - surely the success of it and whatever small dent it is making in the mountain to climb of railfreight conversion is to be really welcomed.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,100
Which means this latest teaser on X means at least 2 more units?
(Trains being plural)
I think the teaser is for the official announcement that the service will be extended to the PRDC shortly, as already noted in the paths appearing in the timetable from this week.
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
776
Location
Doncaster
The latest YouTube episode of Network Rail's "Freight Escape" focuses on Express Freight. It includes an interview with the managing director of Varamis, with a look inside a unit being loaded at Birmingham International.

There's also a view of the mail platform in use by Royal Mail's 325 units at their Midlands Super Hub at Daventry, as discussed in this thread:
https://www.railforums.co.uk/thread...ins-to-serve-south-midlands-super-hub.258978/

 

Top