Would a strategic rolling stock plan make much difference? Surely it is pretty much adding 35 to 40 years onto the construction dates of the existing fleet.The wider plea was for DfT to produce a strategic rolling stock plan for the industry.
It could still have pauses in building, because the starting point is that there hasn't been constant delivery of new rolling stock in the past. Moreover, it isn't straightforward to anticipate when there is funding for new rolling stock. The different factories and assembly plant would still be looking to compete with each other for the orders on offer.
A strategic rolling stock plan would also have to anticipate future cascades, if there are going to be units switching sphere of operation, and refurbishments.
In practice, what is actually being requested is constant orders for rolling stock. I suspect that the life cycle, speed of building and size of the rolling stock fleet doesn't all stack up without pauses. The position would be even worse if Derby had actually built its trains on the original schedule.
What would it entail?Everyone wants such a plan until they realise what it would entail.
Is there an industry body for the manufacturers that could put forward such a plan? I reckon they would realise that somewhere along the line there would be a hiatus.