• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

What new train fleet that would suit Southeastern railway to replace the networkers.

Status
Not open for further replies.

Sutton in Ant

Member
Joined
2 Mar 2021
Messages
256
Location
Sutton Surrey
I was watching YouTube the other day and I saw new trains that were going into passenger service for the very 1st time and it was LNWR new class 730s. I saw the inside and the interiors and I thought that type of train fleet would be suitable for Southeastern railways as it would look the business and it would be perfect replacement for the should be retires networkers?

What do you think?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ChristopherJ

Repeatedly returning banned member
Joined
8 Aug 2005
Messages
494
Location
London, UK
It will be Siemens for SE Metro replacement, I put my money on it.

1) SE already have the x30 Class 707s from SWR, which are incredibly popular.

2) An additional order of British-built Desiro Cities at Goole after the Piccadilly Line order to secure the factory future.

3) Steve White MD is an ex-Siemens manager, so has influence.

The SE Mainline order will go to Hitachi for a variant of the Class 385 fitted with DC shoes, because Newton Aycliffe desperately needs more work after the 805/807/810 order.

Pay me later...
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,389
The SE Mainline order will go to Hitachi for a variant of the Class 385 fitted with DC shoes, because Newton Aycliffe desperately needs more work after the 805/807/810 order.
What SE mainline order? Electrostars have 20 years yet.
 

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,588
None. The Networkers will keep plugging away in ever worse state.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,195
It will be Siemens for SE Metro replacement, I put my money on it.

1) SE already have the x30 Class 707s from SWR, which are incredibly popular.

2) An additional order of British-built Desiro Cities at Goole after the Piccadilly Line order to secure the factory future.

3) Steve White MD is an ex-Siemens manager, so has influence.

The SE Mainline order will go to Hitachi for a variant of the Class 385 fitted with DC shoes, because Newton Aycliffe desperately needs more work after the 805/807/810 order.

Pay me later...
Hmm, my [admittedly very limited] understanding was that those with conflicting interests have to declare this...
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,218
Location
West Wiltshire
Don't forget that Southern region for many years kept older units for peak hour extras. I know commuting has changed but there is still a proportion of units that only really do a hour in the morning and an hour in evening (and that is tending towards a 4 day week without Fridays)

No one is going to be able to find an economic case to acquire new units to run 8-10 hours a week, currently seem to struggle to justify it for units that might be used 80-100 hours a week.

So however much might like to simplify operations and offload 376s and 707s to be replaced by standard units it isn't going to happen (when Anglia and SWR placed their orders times were different, interest rates were low so new units were cheaper)

I might be wrong, but from memory there are number of lines not authorised for 23m or 24m long vehicles, they are restricted to 20 or 21m (happy to be corrected if all SE rails can take longer vehicles)

So my view is whatever happens SE is stuck with a mixed fleet, but what it gets will probably be a 5 or 6car Desiro verve, but only enough to replace some of the 30+ year old fleet.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,389
It is fairly clear that whatever replaces the Networkers in due course will have fewer seats and more standing space, and that there is no hope of a fleet increase.

Moving some of the surplus 701s from SWR would be a start. It would then be a question of how many more 701s need to be built to replace the rest of the Networkers. One potential issue is the need to have 8-car formations for the suburban routes from Victoria and to match siding lengths. This will entail that 4-car units need to form a large part of the Networker replacement.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
It will be Siemens for SE Metro replacement, I put my money on it.

1) SE already have the x30 Class 707s from SWR, which are incredibly popular.

2) An additional order of British-built Desiro Cities at Goole after the Piccadilly Line order to secure the factory future.

3) Steve White MD is an ex-Siemens manager, so has influence.

The SE Mainline order will go to Hitachi for a variant of the Class 385 fitted with DC shoes, because Newton Aycliffe desperately needs more work after the 805/807/810 order.

Pay me later...
As @JonathanH says the Class 375/376/377 have at least another 20 years yet with South Eastern and there is no need to be replacing the class 395 units either as those have another 20 plus years as well.

The only units that need replacing possibly are the class 465/466 networker units and as stated will either be Siemens Desiro, Hitachi A-Train AT200 or Alstom Aventra. Whether that is using the Surplus class 701 units, we will have to wait and see.
 

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,588
Given there's about 150 Networker units there's nowhere near enough 701s to replace any more than a fraction.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,389
Given there's about 150 Networker units there's nowhere near enough 701s to replace any more than a fraction.
They might enable the rest of the /9s and 466s to go though. 100 465s for 8-car workings would be a reasonable position.

The other suggestion that has been made in the past to try and displace the remaining 465/9s is for the 379 > 387 > 377 cascade to bring some 377s from Southern to Southeastern, with 377s backfilled by 387s. 465s still have some outer suburban work - eg to Tunbridge Wells, that 377s could do.
 
Last edited:

Stephen42

Member
Joined
6 Aug 2020
Messages
809
Location
London
They might enable the rest of the /9s and 466s to go though. 100 465s for 8-car workings would be a reasonable position.

The other suggestion that has been made in the past to try and displace the remaining 465/9s is for the 379 > 387 > 377 cascade to bring some 377s from Southern to Southeastern, with 377s backfilled by 387s. 465s still have some outer suburban work - eg to Tunbridge Wells, that 377s could do.
It sounds more likely to be the other way, with possibly a small number of 377s going back to Southern in the longer term. 701s could be a much cheaper option than new stock given SWR are committed to paying for them regadless. If there's sufficient numbers it seems sensible for one of Southern or Southeastern to take them. Doing that could avoid the need for 379s with other stock shuffles if the price wasn't good enough in the recent Great Northern tender or reduce the amount of new stock needing to be built.

Either way Southeastern are clearly of the opinion that new stock will be cheaper than the Networkers overall and new trains would save the tax payer money. Any attempt to continue with them for longer likely requires significant investment which for another 5 years or so life won't be worthwhile.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,887
Location
Cambridge
What SE mainline order? Electrostars have 20 years yet.
So you assume.

== Doublepost prevention - post automatically merged: ==

They might enable the rest of the /9s and 466s to go though. 100 465s for 8-car workings would be a reasonable position.
You then have four separate fleets of 701 Aventras, 707 Desiro Cities, 376 Electrostars and 465/0/1 Networkers all on the same routes, different ages, some have toilets and some don’t, some have air con and some don’t, some 4 some 5 some 10 carriages long, it’d just be so unnecessarily complex.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,389
So you assume.
Yes, clearly that is just an opinion. You may have a different view, but wishing trains out of service that are only 20 years old, and, crucially, in the case of Electrostars, remain appropriate for the job they do, is very wasteful, particularly as rolling stock design has not moved on significantly in that time.

You then have four separate fleets of 701 Aventras, 707 Desiro Cities, 376 Electrostars and 465/0/1 Networkers all on the same routes, different ages, some have toilets and some don’t, some have air con and some don’t, some 4 some 5 some 10 carriages long, it’d just be so unnecessarily complex.
Indeed, that is awkward. I note that Southeastern does have routes where the maximum length is 160m and others where 200m fits, and similar issues with sidings, so whatever happens there will be a mix of lengths.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,541
Location
Taunton or Kent
Moving some of the surplus 701s from SWR would be a start. It would then be a question of how many more 701s need to be built to replace the rest of the Networkers. One potential issue is the need to have 8-car formations for the suburban routes from Victoria and to match siding lengths. This will entail that 4-car units need to form a large part of the Networker replacement.
I think surplus 701s would be better off going to Southern (doesn't mean I see it happening), given they are both more stretched for stock and as you imply Southeastern is more reliant on multiples of 4, not 5. 707s and 376s do 10 car trains enough, Southeastern need more 8s and 12s.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,887
Location
Cambridge
Yes, clearly that is just an opinion. You may have a different view, but wishing trains out of service that are only 20 years old, and, crucially, in the case of Electrostars, remain appropriate for the job they do, is very wasteful, particularly as rolling stock design has not moved on significantly in that time.
Yes I don’t want them out of service either, but we cannot predict that they’ll be kept for the length of time they perhaps should be, as seen by 350/2, 379 and perhaps even 175.

== Doublepost prevention - post automatically merged: ==

I think surplus 701s would be better off going to Southern, given they are both more stretched for stock and as you imply Southeastern is more reliant on multiples of 4, not 5. 707s and 376s do 10 car trains enough, Southeastern need more 8s and 12s.
Surplus 701s will most likely be used on current 8-450 Alton & Basingstoke diagrams to allow those 450s to make sure the 458s aren’t required. SWR have said they, disgracefully, plan to mothball them.
 

DJ_K666

Member
Joined
5 May 2009
Messages
918
Location
Way too far north of 75A
Seriously, I'd rather have a networker. I just have grim memories of them.
To be fair mh post was meant to have Devil emoji on it butvthey didn't post.

As to grimness my memory of them was the SWT fleet which were better maintained. Far superior to the state of anything run by Connex (shudder)

No wonder I wanted BR back right from the start...
 

cslusarc

Member
Joined
27 Jan 2011
Messages
167
I wonder if it would make more sense to get new 120m trains for mainline services to the Kent Coast and backfill the Networkers with existing Electrostars.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Surplus 701s will most likely be used on current 8-450 Alton & Basingstoke diagrams to allow those 450s to make sure the 458s aren’t required. SWR have said they, disgracefully, plan to mothball them.
I thought that class 458 units where being kept to work Waterloo - Portsmouth services in place of the class 442 units?

I wonder if it would make more sense to get new 120m trains for mainline services to the Kent Coast and backfill the Networkers with existing Electrostars.
Unless Alstom build a version of Aventra that is shorter than the 5 coach class 720 units, I don't think that they have an answer to the problem. The only real answer I see is Stadler Flirt, which in four car length is 80.7m. However, the units will have to have a gangeway at the front so that they could couple to other units and enable walkthrough when coupled.

The only other answer is CAF Civity where four car units are 94.75m.

Other possibilities are Siemens Desiro City at 94.70 for four carriage units or Hitachi AT200, but I think that these maybe a bit too long though, but would make sense since SE already operate the AT300 class 395 units.

With regards Siemens, unless there is capacity at there factories in Germany I don't see them building the new trains as they have 94 tube trains that are being built between their sites at Goole and Vienna.

Alstom at Derby have some capacity prior to building the HS2 trains, but I don't think that it would be enough time to be building 100 plus trains. CAF will have capacity after the 10 Civity tri-mode 10 car units have been built.

The only other option I see would be if the units where built be another manufacturer other than those mentioned above elsewhere in the world, like for instance maybe China since the UK Government seem happy to do trade deals with them.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,195
Unless Alstom build a version of Aventra that is shorter than the 5 coach class 720 units, I don't think that they have an answer to the problem.
That product exists - Class 710.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,389
That product exists - Class 710.
Class 710, without a pantograph, works for the basic train, but going all the way to a fully longitudinal seating layout may be a step too far for the Southeastern routes. An interior a bit more like the 730/1s, or a mix of longitudinal and transverse seating, may be better.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,218
Location
West Wiltshire
Class 710, without a pantograph, works for the basic train, but going all the way to a fully longitudinal seating layout may be a step too far for the Southeastern routes. An interior a bit more like the 730/1s, or a mix of longitudinal and transverse seating, may be better.

Nothing here is reinventing the wheel (a new design), so in theory should be able to go into production quickly and work like existing.

4 or 5 car units as existing class 710
20m bodyshells to fit the tight SE routes as per class 710
100mph capability as per class 720, 730
Proper seats (rather than longitudinal) from class 701 or 720

Whether that is the best solution for a train that would be built in mid 2020s is different question.

But waiting for alternative latest design is probably going to add 2-4 years, so might also involve expensive work to life extend existing fleet, or bring back stored units. A refresh on units that would be 32-35 years old in 2024-2025 could be can of worms of extra work discovered that time consumingly and expensively needs doing.
 
Status
Not open for further replies.

Top