I am sure Scotrail indicated they wanted a standard single design to replace all the older EMUs, and the diesel units of lines being upgraded.

The DfT Business commitments of 21-30 4 car units, suggests 21 units are required, but taking them all might be better bet, assuming lease co doesn't want to be stuck with token number, especially if some 387s can move back to GWR. Almost feels as if Oxford electrification is dead cert (even if not announced).
I personally think that Scotrail are more likely to be ordering more Class 385 units and that these will replace the older EMU's.

GWR do not require the class 387's back as far as I am aware, even if electrification is done to oxford, as they would just simply extend the services to Didcot Parkway. Failing that, the other answer is to extend the Elizabeth line services to Didcot Parkway. If however the suburban services in Bristol and west towards Cornwall get electrified, then they will need a new fleet of electric trains to do local services. These could be used to be replacing the class 150 - 166 units, but also if enough are ordered be added to services to Oxford, plus local services in Bucks and Berkshire (I.e. Henley-On-Thames, Marlow, Windsor etc...).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,890
Location
South Wales
If they wired to Bristol.Tm etc then maybe fit batteries to some units if there's enough range with a facility to recharge the batteries
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,789
Location
East Anglia
If they wired to Bristol.Tm etc then maybe fit batteries to some units if there's enough range with a facility to recharge the batteries

Seemed to work reasonably well when batteries were fitted last time to a 379 but not taken forward with this class afterwards.
 

43102EMR

Established Member
Joined
28 Mar 2021
Messages
1,359
Location
UK
Seemed to work reasonably well when batteries were fitted last time to a 379 but not taken forward with this class afterwards.
Bare in mind that was over 10 years ago now - the technology has come a long way since then.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,789
Location
East Anglia
8 years when it entered service - the concept was devised in 2013

Fair enough. Used it several times whilst restricted. Liverpool Street drivers loved it as they didn’t sign them so chipped off early.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
As posted in the thread https://www.railforums.co.uk/threads/great-northern-fleet-tender.247756/page-7

As has been stated a few times in this thread, if GN procured the class 379 units, it could mean that the class 387 units could either move down to Southern or possibly move to Southern with some going back to GWR.

The details of the procurement are as follows:

"Fleet Procurement 25.1 The Operator shall conduct a competitive process for the procurement of no fewer than 21 units (84 vehicles), up to a maximum of 30 units (120 vehicles), by commencing with the issue of a prior information notice (PIN) by no later than [REDACTED8] that would enable the units to become part of the Operator’s train fleet by no later than [REDACTED9]
25.2 By no later than [REDACTED10] the Operator shall submit a report to the Secretary of State detailing the outcomes of the procurement activity detailed in paragraph 25.1, and including the Operator’s recommended option; and
25.3 GTR will provide progress updates against this paragraph 25.1, at the periodic train service development meeting attended by representatives of the Secretary of State and the Operator."

Including the Gatwick Express that Great Northern are currently using, they have access to 39 class 387 units. Now, this could just be my opinion but I think only 28 of those units are possibly used. So you could have the 30 class 379 units replace the bulk of the class 387 units. Then I see 30 units moving to GWR with the remaining 9 units moving south to Southern.

This will fill the requirement for the 30 100mph capable trains for Great Northern and 30 110mph trains for GWR.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,253
Then I see 30 units moving to GWR with the remaining 9 units moving south to Southern.

This will fill the requirement for the 30 100mph capable trains for Great Northern and 30 110mph trains for GWR.
I think you are conflating a few things here.

GWR's exercise a few years ago was to consider whether 30 379s were cheaper to lease than 30 387s, not to increase its EMU fleet. As we saw, the speeding up of Didcot stoppers and removal of some peak services reduced the fleet size at GWR by 3 units. That is all GWR need at this time.

It was speculated that if GWR had taken on the 30 379s, the 33 387s would have gone to GTR to be used predominantly by Southern.

GTR appear to be presenting options to the DfT to increase their fleet. The increase in services doesn't need to be on GN at all. It seems wrong to say that services are 'missing'. The 2019 timetable is not necessarily a measure of what should run now. Lengthening formations on the GN or Southern network and keeping the existing timetable could equally be the outcome, notably on the services via Tulse Hill releasing 3-car units to form 10-car units on other Metro services and sending 4-car units to the longer distance routes.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
I think you are conflating a few things here.

GWR's exercise a few years ago was to consider whether 30 379s were cheaper to lease than 30 387s, not to increase its EMU fleet. As we saw, the speeding up of Didcot stoppers and removal of some peak services reduced the fleet size at GWR by 3 units. That is all GWR need at this time.

It was speculated that if GWR had taken on the 30 379s, the 33 387s would have gone to GTR to be used predominantly by Southern.

GTR appear to be presenting options to the DfT to increase their fleet. The increase in services doesn't need to be on GN at all. It seems wrong to say that services are 'missing'. The 2019 timetable is not necessarily a measure of what should run now. Lengthening formations on the GN or Southern network and keeping the existing timetable could equally be the outcome, notably on the services via Tulse Hill releasing 3-car units to form 10-car units on other Metro services and sending 4-car units to the longer distance routes.
I was just going by what has been said in this thread and the thread https://www.railforums.co.uk/threads/great-northern-fleet-tender.247756/page-7.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,253

Poyntz

Member
Joined
27 Jul 2022
Messages
142
Location
Exmouth

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,306
Location
Hertfordshire / Teesdale
I think you are conflating a few things here.

GWR's exercise a few years ago was to consider whether 30 379s were cheaper to lease than 30 387s, not to increase its EMU fleet. As we saw, the speeding up of Didcot stoppers and removal of some peak services reduced the fleet size at GWR by 3 units. That is all GWR need at this time.

It was speculated that if GWR had taken on the 30 379s, the 33 387s would have gone to GTR to be used predominantly by Southern.

GTR appear to be presenting options to the DfT to increase their fleet. The increase in services doesn't need to be on GN at all. It seems wrong to say that services are 'missing'. The 2019 timetable is not necessarily a measure of what should run now. Lengthening formations on the GN or Southern network and keeping the existing timetable could equally be the outcome, notably on the services via Tulse Hill releasing 3-car units to form 10-car units on other Metro services and sending 4-car units to the longer distance routes.

Whilst I don’t disagree with the above (even though I don’t like it!), there isn’t that much scope for lengthening on the GN. Most of the key Fen Line services to King’s Cross are now back to 12-car, Tuesday to Thursday at least, and one of the three peak Peterborough services is - even in the May 18 timetable not all the Peterborough extras were 12.

So barring lengthening the two Peterborough services, there isn’t much left to lengthen. The Cambridge stopping services are essentially limited to 8 because of the number of short platforms (though 12/700s have covered on a very limited number of occasions). Beyond that, any uplift in capacity will have to come from additional services.
 

43102EMR

Established Member
Joined
28 Mar 2021
Messages
1,359
Location
UK
379028 appears to have moved near Belmont sidings at Doncaster - any idea why?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,253
379028 appears to have moved near Belmont sidings at Doncaster - any idea why?
The 379s go back and forth from Worksop to Doncaster with locomotive haulage to use the electric supply.

I think the working is this. 379018 is reported as the other unit taking its turn under the wires today.

5Q22 0830 Worksop Up Receptions to Doncaster Royal Mail Terml
https://www.realtimetrains.co.uk/service/gb-nr:K03181/2023-09-01/detailed#allox_id=0

5Q23 1403 Doncaster Royal Mail Terml to Worksop Up Receptions
https://www.realtimetrains.co.uk/service/gb-nr:K03184/2023-09-01/detailed
 
Last edited:

Sutton in Ant

Member
Joined
2 Mar 2021
Messages
256
Location
Sutton Surrey
I wonder if the 379s are getting a run out again due to possibly being leased out? Maybe, the negotiations with GTR GN are going positively and perhaps a deal is close. I may be wrong or I may be right.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,789
Location
East Anglia
I wonder if the 379s are getting a run out again due to possibly being leased out? Maybe, the negotiations with GTR GN are going positively and perhaps a deal is close. I may be wrong or I may be right.

The four Norwich based units were dragged under the wires roughly once a month.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,573
Location
Croydon
I wonder if the 379s are getting a run out again due to possibly being leased out? Maybe, the negotiations with GTR GN are going positively and perhaps a deal is close. I may be wrong or I may be right.
More a case of just preventing them decaying too much rather than a specific new use in mind I am afraid. Need to warm them up occasionally to drive the damp out of the coaches and particularly the electrics. Has always happened as @dk1 says below. Significant would be if it was not done as that really indicates eventual demise planned or otherwise.
The four Norwich based units were dragged under the wires roughly once a month.
 

Millercool21

Member
Joined
2 Sep 2023
Messages
25
Location
Bognor Regis
I have a thought, some class 700s run on Great Northern services still operating under the Thameslink brand, if Great Northern were to have some 379s could they could replace the class 700s on these services?
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
I have a thought, some class 700s run on Great Northern services still operating under the Thameslink brand, if Great Northern were to have some 379s could they could replace the class 700s on these services?
No they, they’ll replace 387s to Southern. They are on retainer at GTR, not available to anyone else, just waiting for them to bring them in rather than store them.
 

Millercool21

Member
Joined
2 Sep 2023
Messages
25
Location
Bognor Regis
Before 313s were replaced there was a decent amount of 8 car 377s to Bognor. Now they are all 4 coaches until they reach Horsham. Just shows how southern have to stretch there fleet to the limit.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,253
Before 313s were replaced there was a decent amount of 8 car 377s to Bognor. Now they are all 4 coaches until they reach Horsham.
Can you give examples of services that specifically do not have enough carriages for the demand on the Arun Valley route?

Just shows how southern have to stretch there fleet to the limit.
It doesn't show that. A succession of train failures would show that, but shorter formations could be made at any time to reflect demand.

Southern could take on more stock, and still choose not to run longer formations between Bognor Regis and Horsham.
 

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,121
Location
Selhurst
If longer formations were to run on the Arun Valley Line, they should go to the Southampton/Portsmouth portions as they actually get busy on the weekend
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,583
If longer formations were to run on the Arun Valley Line, they should go to the Southampton/Portsmouth portions as they actually get busy on the weekend

There wont be any Arun Valley trains to Southampton soon!
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
No they, they’ll replace 387s to Southern. They are on retainer at GTR, not available to anyone else, just waiting for them to bring them in rather than store them.
379s on a retainer to GTR? Good sign.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
469
Location
Cheshire
Didn't know the 379s are being retained for GTR, makes sence though since who else would even want/need the 379s?
 
Status
Not open for further replies.

Top