For those who want to follow the works on the Randklev bridge, there is a webcam: https://kunde.byggekamera.no/?p=821&c=1068
For those who want to follow the works on the Randklev bridge, there is a webcam: https://kunde.byggekamera.no/?p=821&c=1068
I have, I check in once a day, been very interesting to watch.Has anyone else been looking at this camera?
They are now in the process of assembling the large crawler-crane, with the use of a smaller (but still large!) crane.
I normally forget until after it's dark!I have, I check in once a day, been very interesting to watch.
They are working under flood lights just now!I normally forget until after it's dark!
Every now and then. It's interesting to see what's happening.Has anyone else been looking at this camera?
They are now in the process of assembling the large crawler-crane, with the use of a smaller (but still large!) crane.
I think that very much depends on the state the bridge is in.We will find out soon how much of a repair is needed! Although I think my chances of travelling on the line mid march are getting slimmer.
or the work needed to rebuild a (torrent-proof) central pier once they have got the collaped bridge out of the way...I think that very much depends on the state the bridge is in.
True, but building a new bridge pillar in a couple of months should not be impossible. Even if it is winter.or the work needed to rebuild a (torrent-proof) central pier once they have got the collaped bridge out of the way...
sooner you than me!True, but building a new bridge pillar in a couple of months should not be impossible. Even if it is winter.
Yep it is assembled and has creeped forward today. I agree with your assumption.It seems like the large crane has moved, so I'm guessing they will lift the bridge next week.
True, but building a new bridge pillar in a couple of months should not be impossible. Even if it is winter.
Further to this, they are laying out the pads for the crawler crane to move into final position today.Yep it is assembled and has creeped forward today. I agree with your assumption.
It will all depend on how the river behaves I suspect.
It looks like they're not wasting any time and we might see the first lift today or tomorrow.Yep it is assembled and has creeped forward today. I agree with your assumption.
maybe not so surprising, as they can't do anything else until the old spans are recovered, and the more that they do before winter really sets in the better.It looks like they're not wasting any time and we might see the first lift today or tomorrow.
For those who want to follow the works on the Randklev bridge, there is a webcam: https://kunde.byggekamera.no/?p=821&c=1068
I suspect it won't be today they lift the other span. They spent a couple of days preparing the other span and don't appear to have yet done that for the other. Looks like tracks need disconnecting and they need to spend time reattaching lifting points. Which seemed to take them a full day on last span.The bridge has been disconnected from the crane, so resting on the stands I presume. I'm guessing they will lift the next span tomorrow and then comes the interesting job of inspecting them.
You're probably correct. It looks like they're removing the counterweights from the crane.I suspect it won't be today they lift the other span. They spent a couple of days preparing the other span and don't appear to have yet done that for the other. Looks like tracks need disconnecting and they need to spend time reattaching lifting points. Which seemed to take them a full day on last span.
Happy to be proved wrong.
On brighter news, I would say the span that has come out looks in good condition. No major damage although obviously not visible in detail.You're probably correct. It looks like they're removing the counterweights from the crane.
It looks in good condition, but I'm nowhere near qualified to have an opinion on that.On brighter news, I would say the span that has come out looks in good condition. No major damage although obviously not visible in detail.
I'm marginally qualified... But metallic bridges are very much not my area of expertise.It looks in good condition, but I'm nowhere near qualified to have an opinion on that.
I hope you are right, if the spans can be reused it would save a lot of time and money.I'm marginally qualified... But metallic bridges are very much not my area of expertise.