So, as per the reviews thread I spent a bit of time on 777s this weekend. One observation was that they handled high loadings quite well - but particularly on Sunday with the half frequency there were a lot of standees. This doesn't really seem aceptable when the only constraint is rolling stock, but 8 car sets may have been excessive.
I've long taken the view that Merseyrail should have considered longer trains (4-5 x 20m equivalent) and abandoning doubling up. So with the production line still being open, might it make sense for them to abandon all the complexity and cost of adapting things for doubled up 777s and gain capacity by ordering one or two more middle sections for each train (one section would give you a little longer than 4x20m, two slightly longer than 5x20m), and operate them only singly?
This would seem to save a fair bit of money so get more "bang for the buck", and mean that they don't need to worry about predicting flows. It might slow them down a bit, though.
It's notable that London Underground doesn't any longer do any form of portion working and has only ordered full length trains in recent years, with the DLR also changing to this.
I've long taken the view that Merseyrail should have considered longer trains (4-5 x 20m equivalent) and abandoning doubling up. So with the production line still being open, might it make sense for them to abandon all the complexity and cost of adapting things for doubled up 777s and gain capacity by ordering one or two more middle sections for each train (one section would give you a little longer than 4x20m, two slightly longer than 5x20m), and operate them only singly?
This would seem to save a fair bit of money so get more "bang for the buck", and mean that they don't need to worry about predicting flows. It might slow them down a bit, though.
It's notable that London Underground doesn't any longer do any form of portion working and has only ordered full length trains in recent years, with the DLR also changing to this.