The Manchester to Cardiff services are planned to be run as 5 car sets. With the 3 car being one with first class. I noticed in the proposed timetable a while back the 7:30 and 15:30 from Shrewsbury to Birmingham International was to be planned as 3x 2cars, so I’m sure there would be other examples where they are wanting to run 5 and 6 car services.Sorry to be uninformed, but the plan is that most of the 197 sets will run as 1x 3 cars or 2x 2 cars coupled right?
Will there even be some routes that get 5 or 6 cars? (3 + 3 could be coupled if they wanted to right?)
I really hope they don't plan to run the two car ones on their own too often in the long run...
Only asking as I actually skipped over getting on the 1536 service from Newport to Holyhead yesterday (later cancelled at Chester), which was running 20 minutes late because it was only two cars and got absolutely rammed full by those waiting at Newport. Got on the 1609 153+150 4 car set afterwards, which was still really busy (and 60 minutes late in the end due to a signalling fault).
They really shouldn't have started putting 197s into use until they could run most of them as coupled sets, what is currently stopping them? Is it just they're trying to replace as many of the older trains ASAP so are short forming to allow that?
They couldn’t accept 197’s and leave them in the depot or on sidings and keep the legacy fleet until they’re all ready as there just isn’t the space for it. Not to mention all the crews would lose their competency. Unfortunately the period of change over is just something that has to happen. Things should be much better once they’re all in service though.