Tfw really is a be carefull what you wish for TOC, it is kinda ironic most people want rid of the private TOCs & their respective parents (Arriva or Go ahead for example) but tfw a "publicly owned" operator is failing with the basics while spiraling with ambitious projects that are long game the short term is kneecapping them.
Well, you see the real problem is actually that all of these over-zealous plans were set in motion by TFW when it was a private operator under the Keolis-Amey banner. When Covid hit and they didn’t want it anymore the Welsh government took it under public ownership.
So the public ownership side of it hasn’t caused these problems but is stuck with them. James Price has already said that everything been done in such a short time frame is a mistake and this should all have been done over something more like 10 years.
The only things I can think off the top of my head, that the non-privatised TFW have done is acquire more MK4 rolling stock and class 67’s to operate services between Manchester and Swansea. Which is great as it’s a better passenger experience than any of TFW’s units and it frees up 197’s to bolster other services.
Additional to this they’ve made kids travelling adults travel free.
New on the BBC:
Fewer than a third of all Transport for Wales train journeys are being operated by modern trains.
www.bbc.co.uk
Does not say much but a sorry state of affairs in Wales. People are complaining about the new 197s, only 2 carriages, yet TFW on Twitter say they were built to expand and add carriages. Of course, I predict it will not get a lot better as really, 2 car sets should be a thing of the past for any busy line!
People are complaining about the 197’s but sometimes it seems like complaining for the sake of complaining.
Though there are certainly some things to complain about, I don’t think anything will get changed at this point. When I finally got a 2 hour trip on one to Cardiff, I was pleasantly surprised by how nice it was to travel on (a bit bumpy at times, but that is partly due to the fact they are designed for well kept CWR tracks). The toilet provision is a big let down as is (for conductors) the 2 part access ramp (how on gods earth did that happen ♂️).
It is intended that only the very lightly loaded services will run as 2 cars but many services operated by 197’s are planned to be 4,5 or 6 cars, which will ultimately be a very nice capacity increase.
As I have said above in this post, the Welsh government have now acquired more MK4 rolling stock which is planned to take over 50% of the Manchester - Cardiff services which frees up more of the 197’s to be able to have more coaches on other services.
It’s difficult at the moment as TFW still have a lot of rolling stock to bring into service and a lot of rolling stock to go off lease which means they are operating a large number of traction types (10 all in all) which most can’t be inter worked together.
When all of the old stock is gone and all of the. We stock is in play, it should be a significant improvement in capacity, along with better reliability and more services too.
I’ll just say that TFW have had an immense recruitment drive the last few years to ensure there are enough staff for all of this as well.
Once it’s all finished, if TFW aren’t providing a better service with significantly less overcrowding, then I would be happy to say it’s a failure and they may not be fit for what they are doing.
But i certainly hold out hope that the people of wales will have a better rail network in the next few years.