• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

XC desperately needs more rolling stock

Status
Not open for further replies.

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,329
Three coach 170s between Birmingham & Leicester are totally inadequate. I made a return trip between Birmingham & Nuneaton last Saturday (22 Sept.). and each way, standing passengers were jammed for the full length of the train. A passenger with a pram at Coleshill Parkway seemed unable to board.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Dr Day

Member
Joined
16 Oct 2018
Messages
759
Location
Bristol
Part of the financial problem is that the revenue from the ‘business’ market has fallen, meaning that ‘leisure’ fares have to go up to compensate. In my experience on the Bristol-Birmingham corridor morning and evening peak trains are far less busy than they used to be. People used to have to pay higher fares and still not get a seat. It is easy to forget just how busy some of the traditional peak services actually were, hence how much revenue XC must have lost from those markets in a period when costs have risen. The DfT are looking at minimising the gap between revenue and costs, not necessarily maximising patronage or reducing overcrowding.
 

Xavi

Member
Joined
17 Apr 2012
Messages
854
The DfT are looking at minimising the gap between revenue and costs, not necessarily maximising patronage or reducing overcrowding.
The methods deployed by DfT are too simplistic to minimise the gap. If an EasyJet or Ryanair used similar methods, they’d have failed years ago.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
Compared to the noisy/cramped/claustrophobic/smelly Voyagers used on the Manchester-Birmingham service, the class 350s used on the Liverpool-Birmingham service are pleasanter/smoother/quieter and have a larger capacity per coach.
Pretty much any sub-120mph EMU would have a larger capacity per coach than a 125mph unit like a Pendolino, class 180 or Voyager. However, on a 350 a larger proportion of that capacity will probably be standing room (due to the wide doors) and a 350, because it only has 2 toilets, fails to meet the Rail Delivery Group best practice for "intercity or inter-urban services" of "85 seats per toilet" - the Voyagers do meet that. Also, due to the lack of internal doors seperating the vestibles from the passenger saloons, the 350s might not be conidered pleasanter than a Voyager (particularly coach D on the Avanti ones with their window-aligned seating).

Emus are much more straightforward to operate than locomotive-hauled passenger trains. IMO, all of the latter should be withdrawn from Britain's railways asap to improve reliability and cut costs.
Operation of multiple units tends to be much-more straightforward* than old-style loco operation with run-round at termini I grant you, but I'm not aware of anywhere that still happens on normal National Rail services, other than the sleepers. The only passenger operations I can think of still using locomotives and coaching stock are:
  1. GWR 'Night Riviera' mark 3s
  2. Chiltern Railways 'Mainline' mark 3s
  3. ScotRail Inter7City mark 3s (IC125)
  4. GWR 'Castle Set' mark 3s (IC125)
  5. LNER mark 4s (IC225)
  6. TfW mark 4s
  7. Caledonian Sleeper mark 5s
  8. TPE mark 5s (maybe; I'm not sure of the exact withdrawal date and whether they have actually gone yet)
Assuming you don't really think having diesel engines under the floor is a good idea on the sleepers, I can't see anything wrong with these. Two of them are IC125 formations with a locomotive at each end and the other four have a driving trailer at one end so that the loco can push from the other and doesn't need to be on the front all the time (so operation is not really that much different from a multiple unit). Unless you plan to remove them without replacement, it wouldn't necessarily cut costs either because I seem to recall reading somewhere that loco+stock (with driving trailer) tends to break even with units once you get to five coaches and loco+stock then becomes the cheaper option if running more than 5 coaches. This means the GWR Castle and Inter7City 2+4 sets are possibly a little 'in the red' compared to a unit but the IC225s are nine coaches, XC's IC125s were 2+7 (not on the above list, because GOV. have stupidly axed them) and the Chiltern, TPE and TfW sets are all (or will be) at least 5 coaches.

* although the myriad of incompatible couplers means multiple unit operations are not as straightforward as they should be.

Something needs to serve Winsford, Hartford and Acton Bridge, and the demand and number of settlements solely between Crewe and Liverpool doesn't justify a dedicated stopper like it does between Crewe and Manchester.
There's Penkridge as well, so the stopper wouldn't just be between Crewe and Liverpool. Why not add a few more stops to the current Birmingham-Liverpool 350-operated service to make it even more of a stopper and extend one of the three Avanti Euston-Birminghams each hour to Liverpool as a fast?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,349
Location
"Marston Vale mafia"
Sleepers are a bit of a special case, but I am genuinely surprised the Cally wasn't done as an EMU capable of being diesel hauled. It would have simplified things a lot, and the length could have been specced so you could get three of them into Euston for the Highlander, removing the silly seated coach dance at 4am.

But as to the thread title, XC just needs 7 or 8-car 80x of a spec similar to LNER replacing the Voyagers on a 1:1 basis, and the 170 services moving into other TOCs with added capacity ordered by way of e.g. more 196s for WMT, more FLIRTs or 197s for TfW and so on. Just order the things. It's about the simplest franchise to fix out of any of them. It's not like that sort of thing hasn't been done before - even minus the Mk5s TPE has had a huge capacity increase.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
But as to the thread title, XC just needs 7 or 8-car 80x of a spec similar to LNER replacing the Voyagers on a 1:1 basis
Yes, but not by means of ordering new 80x; do that and you've killed off what little hope there is of electrifying much more of the network in England beyond the current MML and TPE schemes (assuming they aren't scrapped). Any new 80x ordered should be straight electric like the 803s (and possibly 807s - not sure whether they have a diesel genset like the 801s or not) and, if not an add-on to an existing fleet (in which case no driving vehicles will be needed for some time, only intermediate cars, due to the insane number of 5-car sets that have been built/ordered), should have plug doors. They should also have cushioned seats (which should also be retrofitted to all current 80x ASAP) instead of the concrete ones on all recent new trains (and refurbs which have replaced the seats, like the Avanti Pendolinos - the new Avanti Pendo seats might have some good points but they are still far too hard).

XC needs to get cascaded 80x (and/or 810) bi-modes from other TOCs coupled with electrification on the latter and electrification of the gaps in Manchester-Bournemouth to allow this route to go over to new dual-system EMUs.

and the 170 services moving into other TOCs with added capacity ordered by way of e.g. more 196s for WMT, more FLIRTs or 197s for TfW and so on. Just order the things.
No, just no. Those cavity abominations (including the 195s) should never have existed in the first place. Building units without a pantograph (or at least passage provision for one) has been a bad idea since at least 2015. Cardiff-Nottingham I think could do with being moved into the XC InterCity fold (with any odd local stops shifted onto additonal TfW/WMT services), with all XC's 170s going to EMR, WMR or Northern. The Birmingham-Leicester/Nottingham locals would go to EMR (who would use the 170s coming from XC) or WMR (although since they are getting rid of their 170s this is probably only a good idea if there was some electrification done to either allow them to use EMUs or cascade some 196s internally). Not sure what to do with Birmingham-Stansted though, due to the need to utilise SP differentials and reports of a short platform at Stansted.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
Emus are much more straightforward to operate than locomotive-hauled passenger trains. IMO, all of the latter should be withdrawn from Britain's railways asap to improve reliability and cut costs.

I assume you've failed to notice that not every railway line in the UK is electrified. Also, where LHCS is being used in place of DMUs with an engine under every coach, exactly how much cost would be cut by not using locos and hauled stock? None, I would suggest.
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
They should also have cushioned seats (which should also be retrofitted to all current 80x ASAP) instead of the concrete ones on all recent new trains (and refurbs which have replaced the seats, like the Avanti Pendolinos - the new Avanti Pendo seats might have some good points but they are still far too hard).
Unfortunately I only see a chance of this happening when the IETs are mid-life in 15-20 years time. Those refurb Pendolino seats are very hard, the FISA lean in the FLIRTs and the 196s are the only good new seat post 2014 revised PRM-TSI era.
The Birmingham-Leicester/Nottingham locals would go to EMR (who would use the 170s coming from XC) or WMR (although since they are getting rid of their 170s this is probably only a good idea if there was some electrification done to either allow them to use EMUs or cascade some 196s internally). Not sure what to do with Birmingham-Stansted though, due to the need to utilise SP differentials and reports of a short platform at Stansted.
Easier to keep it with XC, moving to EMR won't benefit the service if the rolling stock stays the same.
No, just no. Those cavity abominations (including the 195s) should never have existed in the first place. Building units without a pantograph (or at least passage provision for one) has been a bad idea since at least 2015. Cardiff-Nottingham I think could do with being moved into the XC InterCity fold (with any odd local stops shifted onto additonal TfW/WMT services), with all XC's 170s going to EMR, WMR or Northern.
Easy with hindsight, but in 2015 there was far less environmental pressure than today, plus short termism rules decision making, even decisions that will last 35-40 years.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,349
Location
"Marston Vale mafia"
Unfortunately I only see a chance of this happening when the IETs are mid-life in 15-20 years time. Those refurb Pendolino seats are very hard, the FISA lean in the FLIRTs and the 196s are the only good new seat post 2014 revised PRM-TSI era.

Funny how opinions vary, I find the LEAN to be much, much harder than the Pendolino seat (which I now rank as the best UK Standard seat, it's similar to the venerable Grammer IC3000 but for two things, a better angle of rake and a better designed seat back that gives a little extra legroom).
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
Easier to keep it with XC, moving to EMR won't benefit the service if the rolling stock stays the same.
But my suggestion is that XC should become a pure InterCity operator, so 170s go to some other TOC (and some get released by making Cardiff-Nottingham an InterCity route, so while the Leicester/Nottingham-Birmingham locals would still be 170s there would be more of them perhaps allowing some train lengthening).

Easy with hindsight, but in 2015 there was far less environmental pressure than today, plus short termism rules decision making, even decisions that will last 35-40 years.
The Paris COP was in December 2015, we already had the Climate Change Act 2008 with a target to reduce greenhouse gas emissions by 80 per cent by 2050 (compared to 1990 levels) and the rail industry has been recommending widespread electrification since at least 1981 (I think I even read somewhere that there was a push for electrification soon after nationalisation instead of the BR standard steam locos). Short-termism it is...

Unfortunately I only see a chance of this happening when the IETs are mid-life in 15-20 years time. Those refurb Pendolino seats are very hard, the FISA lean in the FLIRTs and the 196s are the only good new seat post 2014 revised PRM-TSI era.
Funny how opinions vary, I find the LEAN to be much, much harder than the Pendolino seat (which I now rank as the best UK Standard seat, it's similar to the venerable Grammer IC3000 but for two things, a better angle of rake and a better designed seat back that gives a little extra legroom).
I've not been on a 196 or the GA FLIRTs; do they have the same seats as the TfW class 231s? If so, I found both the new Pendolino seat and the FISA LEAN (assuming that is what is in the 231s) to be very hard although I wasn't on the latter all that long (the Pendo I think was Preston to Crewe, so about an hour).
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
The Paris COP was in December 2015, we already had the Climate Change Act 2008 with a target to reduce greenhouse gas emissions by 80 per cent by 2050 (compared to 1990 levels) and the rail industry has been recommending widespread electrification since at least 1981 (I think I even read somewhere that there was a push for electrification soon after nationalisation instead of the BR standard steam locos). Short-termism it is...
Yes, but environmental reasons were rarely/never cited for electrification, it was more for intensively used lines to be more efficient and reliable. The north ECML was almost going to be de-electrified owing to it's sparse use at the time and high maintenance costs.
I've not been on a 196 or the GA FLIRTs; do they have the same seats as the TfW class 231s? If so, I found both the new Pendolino seat and the FISA LEAN (assuming that is what is in the 231s) to be very hard although I wasn't on the latter all that long (the Pendo I think was Preston to Crewe, so about an hour).
Yes, but they soften significantly with years. The 196s, 231s and 756s are too new but the GA 755s entered service August 2019 and 745s Feb 2020 and the seats took about 18 months to soften.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
Yes, but environmental reasons were rarely/never cited for electrification, it was more for intensively used lines to be more efficient and reliable.
Agreed; that almost certainly would have been the case for the 1981 BR report I mentioned; the failure of successive Government to implement the electrification recommendations is still short-termism though regardless of the reasons behind those recommendations.

Yes, but they soften significantly with years. The 196s, 231s and 756s are too new but the GA 755s entered service August 2019 and 745s Feb 2020 and the seats took about 18 months to soften.
Maybe I should try to get over to Anglia and try out the 755s sharpish then, before TfW in mid and south Wales comes over all Sophia (as it already has in the north) and makes getting out of Wales intolerable - or do the Sophias soften too?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,349
Location
"Marston Vale mafia"
Maybe I should try to get over to Anglia and try out the 755s then, before TfW comes over all Sophia and makes getting out of Wales intolerable - or do the Sophias soften too?

Have you sat on one yet? I'm a fully paid up* Sophia hater, but the TfW seat has a different base cushion and with that is to me quite a good seat. Assuming it doesn't collapse, it might make it one of my favourites.

It's like the ironing board. The ones in the 700s give you a numb bum, but the almost identical-looking ones on Northern have a different base cushion which I find to be one of the better railway seats around.

* Well, I've paid GWR about a grand over the past few years travelling on their 80x operated services, anyway.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
Have you sat on one yet? I'm a fully paid up* Sophia hater, but the TfW seat has a different base cushion and with that is to me quite a good seat. Assuming it doesn't collapse, it might make it one of my favourites.
The longest journey I've done on a Sophia was when I did Carmarthen to Cardiff on GWR (probably a Saturday in September 2019) and decided that was a little further than I'd like to travel on one in future.

More recently I've done Newcastle to York on an Azuma, Carlisle to (I think) Preston on a 397 and Shrewsbury to Wem on a 197. The latter is currently my only trip on a 197 and the base cushion still felt hard to me but I need to do a (slightly) longer trip sometime.

It's like the ironing board. The ones in the 700s give you a numb bum, but the almost identical-looking ones on Northern have a different base cushion which I find to be one of the better railway seats around.
I can't remember if I've actually tried the Thameslink ones - the Northern ones may be better but they are still awful in my view - after the Newcastle to York Azuma my mother and I then went to Leeds on a 195 before taking an IC225 to Kings Cross. My mother later singled out the 'ironing board' as the worst seat of the trip and I'm inclined to agree. I can understand the pain of a lump of metal if the pathetic excuse for a cushion on the Sophias is pushed out of the way - some of the class 175 seats have got a bit tired and the cushioning in the seat back has come away leaving a nasty pain in my back if I lean back too far - this never used to be there but I noticed it a bit before the TfW refresh (I don't think the refresh actually addressed it though).
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,126
Location
West Wiltshire
Cross Country have awarded Alston an €950m contract to maintain voyager fleet 252 vehicles (and 7 extra sets Ex Avanti) for 8 years

2 November 2023 – Alstom, global leader in smart and sustainable mobility, has signed an eight-year extension to its Train Services Agreement (TSA) with CrossCountry in the UK. The contract extension, valued at around €950 million, further secures this long-term partnership and is evidence of the trust placed by the customer.

Under the agreement, Alstom will continue to maintain, overhaul, service and clean 252 vehicles of the CrossCountry fleet (34 Class 220 Voyagers and 24 Class 221 Super Voyagers) at their primary depot, Central Rivers. In addition, seven Voyagers will move to CrossCountry when they are released from service with Avanti West Coast to bolster the CrossCountry fleet and enable service uplifts in due course.
The contract places a strong focus on robust fleet performance, with a collaboration team between Alstom, the asset owner and CrossCountry established to identify optimisation and improvement initiatives, as well as to ensure the quality of the passenger environment.

The contract includes management of all planned (preventative) and unplanned (corrective) maintenance; all required overhaul activities; cleaning, and light maintenance services on the vehicles; vehicle servicing; service delivery support (including 24/7 telephone help line); vehicle cleaning (daily and periodic); depot management; shunting; obsolescence monitoring and management, and accident/vandalism repair.

Looks like some modifications are going to take place
Within the agreement, the fleet will be installed with an Intelligent Engine Stop Start (IESS) system, which will drive a reduction in fuel usage, emissions, and operational costs. Additionally, the collaboration team will continue with other fuel savings measures to build on the weight reduction initiatives already undertaken, or underway, which will substantially reduce the emissions produced from the fleet.

 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
The document linked also says 950M Euro, not GBP.

Obviously that brings the cost down to a very reasonable £826 Million…

Bargain! 8-)

But even that's over 252 coaches over an 8 year period, that brings it down to practically free per coach at £409,800.
 

GoneSouth

Established Member
Joined
17 Dec 2018
Messages
1,486
Did they accidentally quote for a fleet replacement cost and everyone at XC were desperate to get out the door at the end of the day so just said yeah whatever !
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,981
Location
here to eternity
A reminder that for actual updates (not speculation) on the XC contract situation this thread should be used:
 

TheWalrus

Established Member
Joined
6 Oct 2008
Messages
2,069
Location
UK
I wish XC would take the 222s then I would use them for longer distances.
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
609
Location
Hull
The press release includes Overhaul activities over the 8 Years so I would expect all the engines will require overhaul at least once in that period for example. Without knowing what equipment drops due overhaul during the 8 year period you can't judge the costs, bogie overhauls may or may not be required on some or all of the fleet perhaps. It's also not clear if Alstom or the ROSCO are paying for the actual component overhauls with Alstom just doing the equipment change outs, you would expect it to be Alstom so they take on all the risk.

The refurb is a totally different piece of work which will go out to tender and Alstom may not win it, although being the OEM and having Widnes available to follow on from the 390 refurbs it's their contract to lose.
 

GoneSouth

Established Member
Joined
17 Dec 2018
Messages
1,486
The press release includes Overhaul activities over the 8 Years so I would expect all the engines will require overhaul at least once in that period for example. Without knowing what equipment drops due overhaul during the 8 year period you can't judge the costs, bogie overhauls may or may not be required on some or all of the fleet perhaps. It's also not clear if Alstom or the ROSCO are paying for the actual component overhauls with Alstom just doing the equipment change outs, you would expect it to be Alstom so they take on all the risk.

The refurb is a totally different piece of work which will go out to tender and Alstom may not win it, although being the OEM and having Widnes available to follow on from the 390 refurbs it's their contract to lose.
Wonder how long the tender process will take, the seat I had today on my Voyager was knackered so it can’t come quickly enough :D

Looking forward to riding on an as new Voyager again, they glide along very smoothly.
 
Status
Not open for further replies.

Top