This is more of a thinking exercise. It is my opinion that groupthink has prevented progress here. The following makes one question it all:
In the 1980’s/90’s the timetables to York stated 1hr45 regularly. An HST I was on did it in 1hr40mins. 91’s managed it in 1hr39. Now, over-speeding would have helped the HST, but it would not have achieved a 140mph standard speed where it would have been possible, and acceleration and braking was not as good as today. Further… London to Newcastle times for a best of 2hrs39 and done in 2hrs35. The record run did ‘up to 140mph’ with an HST at 2hrs19mins. I accept the line was cleared for that record run. So… all that without 140mph running as standard where obtainable. To Edinburgh would save 15 minutes with 140mph running. Considering Edinburgh services are so damn slow at 4hrs 15 in reality, timetabled for 4hrs20 or so. 15 minutes (or more) is significant.
So I would posit that we are being a little under-ambitious here and overly negative. The difference between 110mph and 125mph is large to Edinburgh or Glasgow on the West Coast (half an hour to 40minutes in fact). Now time spent above 140mph would be less, but the 15 minute addition and a 3hr45 minute London-Edinburgh time as stated back in the 1980’s as a target is possible. That is half an hour better than standard and 15 minutes better than the current best. Edinburgh deserves this at the very least. I fly a lot between London and Edinburgh since 2013. A 3hrs30 time (if targeted) may see me change my mind (but still too long on today’s uncomfortable trains). My point being, are we not being a little too negative and downplaying the time savings with 140mph running? There’s plenty of spots and it is a not-so-populated route with plenty of flat land too that could facilitate some limited interventions.
We can do better than we are, we can do better than this. The lack of ambition drains the life out of me regards Britain’s railways. The engineers of old and in retirement or sadly passed I really mourn.