Thats only because that is the end of CP7 and no one has thought about 8 or 9 yet.ETCS will only reach Grantham in 2029 and as far as I am aware nothing further north is pencilled in.
Thats only because that is the end of CP7 and no one has thought about 8 or 9 yet.ETCS will only reach Grantham in 2029 and as far as I am aware nothing further north is pencilled in.
Largely because the focus has shifted to raising other lines from lower speeds to existing speeds so that the network overall is better, rather than putting all the eggs into one basket. Especially as the ECML has lost the speed crown to HS1.I have to ask, why have we seemingly given up on improving speeds on Britain's railways? It seems like 20-30 years ago the railways were doing everything they could to make 140mph the new norm for mainline expresses, and designed trains like the 91 and 390 to do just that.
I know there are other probably better ways to improve journey times, but back then there seemed to be so much more enthusiasm for it. Have we simply lost all pride in our railways?
I get the in cab signalling thing. But why are all the other things like swing nose points required when they weren't when the flashing green aspect was proposed to be used (and was used for test trains) for 140mph running?To run at 140mph from the existing 125mph sections on the ECML would require ETCS L2 without lineside signals (although a hybrid mode is possible where <125mph trains can use signals but 140mph trains can use the in-cab), OLE upgrades, ballast work, track upgrades, swingnose points, structure and stock clearance reassessment, a timetable rewrite, and somebody to fund all of this. The benefit of 140mph over 125mph is c.3 seconds a mile.
Can't answer about swing nose points hut I'd guess limited testing puts a different wear and maintenance load on the points to full service.I get the in cab signalling thing. But why are all the other things like swing nose points required when they weren't when the flashing green aspect was proposed to be used (and was used for test trains) for 140mph running?
I have to ask, why have we seemingly given up on improving speeds on Britain's railways?
I get the in cab signalling thing. But why are all the other things like swing nose points required when they weren't when the flashing green aspect was proposed to be used (and was used for test trains) for 140mph running?
The North Transpennine route is set to receive many points at which trains can exceed 100mph, including between Leeds and Manchester where the highest linespeed is 85mph, and that's only in Standedge Tunnel for westbound services.I know there are other probably better ways to improve journey times, but back then there seemed to be so much more enthusiasm for it. Have we simply lost all pride in our railways?
Morpeth (50mph?) if bypassed with a new 125mph line would surely save a few of minutes.
Realistically, to gain any significant advantage you would need to build a completely off-line bypass, not just short deviations. That's essentially what the eastern leg of HS2 was meant to do.Where else might we get rid of junctions and curves to good effect? I would also guess eliminating the level crossings has to help too.
The fastest timetabled Edinburgh-KGX train i'm aware of was the 5:40 am departure southbound, which did it in 4 hours. What kind of work would be needed to match that more regularly? The 5:40 only stops in Newcastle (it even skips York!), which obviously wouldn't be realistic for a more regular service, but could it be matched for, say, the fastest LNER service each hour?
Given that the headline speed usually isn't available for the whole route, I've occasionally wondered whether a really short section of 140mph running would be feasible.
It would have to be long enough to allow trains to reach the speed for at least a couple of minutes (or at least a couple of miles?), thus claiming the speed, but be short enough that it wouldn't actually cost too much to maintain.
Obviously you'd also need trains that were rated to run at the speed, but the 80x supposedly can and presumably a signalling system that supports in-cab signalling on that route section anyway.
Maintenance regime on the train might be an issue since you'd have to maintain at least some units for the speed.
It might also be necessary to have two sections, to make it clear that it wasn't a cynical exercise in PR.
Any thoughts?
What you're proposing does kind of sound like a cynical PR exercise though?Given that the headline speed usually isn't available for the whole route, I've occasionally wondered whether a really short section of 140mph running would be feasible.
It would have to be long enough to allow trains to reach the speed for at least a couple of minutes (or at least a couple of miles?), thus claiming the speed, but be short enough that it wouldn't actually cost too much to maintain.
Obviously you'd also need trains that were rated to run at the speed, but the 80x supposedly can and presumably a signalling system that supports in-cab signalling on that route section anyway.
Maintenance regime on the train might be an issue since you'd have to maintain at least some units for the speed.
It might also be necessary to have two sections, to make it clear that it wasn't a cynical exercise in PR.
Any thoughts?
Why? HS1 is already 140mph domestic/186mph international so you're not doing anything that isn't already done. The only reason to go for 140mph would be to reduce key journey times below certain milestones or to improve the efficiency of the operation by allowing a higher throughput of trains, neither of which a very short section achieves. Instead you get all the cost of 140mph running for a tiny demonstration section that makes things worse in many ways.Given that the headline speed usually isn't available for the whole route, I've occasionally wondered whether a really short section of 140mph running would be feasible.
It would have to be long enough to allow trains to reach the speed for at least a couple of minutes (or at least a couple of miles?), thus claiming the speed, but be short enough that it wouldn't actually cost too much to maintain.
Any thoughts?
True, but there are good connectivity reasons for having at least a few stops on london-EdinburghYihve answered your own question. No work required, just don’t stop (and rewrite the timetable).
5 minutes for a stop from 125mph. York and Newcastle cost somewhat less as the curves at each station are very slow anyway.True, but there are good connectivity reasons for having at least a few stops on london-Edinburgh
I guess you would need to win 3-5 minutes in running time for every extra stop you wanted to add beyond Newcastle?
yes, this is a side-effect which would be ignored.Instead you get all the cost of 140mph running for a tiny demonstration section that makes things worse in many ways.
On what grounds? It's usually cheaper to build from new, as the cost of disrupting the existing railway needs to be factored in.Possibly if we ever go back to franchises or the Great British railway thing ever really happens, someone might decide that "upgrading the speeds of our existing lines" is cheaper than building new ones.
15mph increase is 'much faster'?. They've been trying to sell the benefits of 250mph trains between the UK's 3 biggest cities, and it hasn't exactly gone down swimmingly...Push a short stretch of 140mph running and advertise the wonders that the new regime has arranged, much faster line speed on our key routes.
I quite agree about the stops.True, but there are good connectivity reasons for having at least a few stops on london-Edinburgh
I guess you would need to win 3-5 minutes in running time for every extra stop you wanted to add beyond Newcastle?
Just had a look at the current timetable, and a typical 'fast' service, say the 08:00 from Kings Cross, First stop York, then Darlington, Newcastle, Berwick and Edinburgh takes 4h 22m. Run time to York is 1h 49m, even if all the bits capable of upgrade to 140mph south of York were to be upgraded to 140mph at 3s a mile my guess is savings would be 5 minutes tops, probably less. York to Darlington is mainly 4 track, and straight, so could be a easy win, but again savings are going to be around a minute, may be two. North of Darlington the alignment of the route appears to be the limiting factor, so if you saved a further 2 minutes I would be surprised.
Are there any bits of the route which can do 160mph without significant change?Probably because we've lumbered ourselves with another generation of trains that will only do 140mph - and therefore it isn't worth upgrading the route!
I believe the alignment of the Selby diversion was designed with a theoretical aspiration of 160 mph. York to Darlington as a whole is in the main very straight as well.Are there any bits of the route which can do 160mph without significant change?
I'm sure Hitachi can price out motor upgrades to get the 801s going quicker.
Good luck pathing all the freight and local/regional services around those 160mph paths...Now though... with in-cab signalling, why isn't it 160mph or above we are looking at?
oh that's easy, just build the 160 mph bits as a separate line.Good luck pathing all the freight and local/regional services around those 160mph paths...
Greengage21 have an interesting (post IRP) proposal to build HS2 East as a series of bypasses to ECML, between Newark and the Selby DiversionAs said earlier, the reality is that if you want to make substantial journey time improvements, you need HS2 and it's eastern leg as the ECML is tapped out...