D6130
Established Member
But is it only an extension because nobody else showed any interest in taking over the franchise?It’s not a franchise competition just an extension. Those take years and are very expensive.
But is it only an extension because nobody else showed any interest in taking over the franchise?It’s not a franchise competition just an extension. Those take years and are very expensive.
But is it only an extension because nobody else showed any interest in taking over the franchise?
That's an excellent point.I imagine the rather lacklustre uptake of ex AWC 221 will partially be driven by the additional costs incurred by ensuring that each unit on a double set has a Train Manager present. I can understand the economical sense of crush loading a single set as opposed to the not insignificant cost of recruiting and training additional Train Managers - unless an agreement could be negotiated per LNER for retail managers to be upskilled in pseudo guarding of a unit.
Is there really an agreement for that? Seems surprising to me.I imagine the rather lacklustre uptake of ex AWC 221 will partially be driven by the additional costs incurred by ensuring that each unit on a double set has a Train Manager present.
But is it only an extension because nobody else showed any interest in taking over the franchise?
It's a Direct Award.But is it only an extension because nobody else showed any interest in taking over the franchise?
You don't need additional units to do a study.The MR article says that XC are to study future opportunities for its Turbostar routes. This would be a stretch without additional units
Grand union might be considering themPlus, it's probably faster going via the WCML changing at Crewe (TfW via Marches) or B'ham (XC) for the Avanti service anyway.
Oh look, someone beat me to it
Wouldn't there be just 3 left cos Grand Central are planning to take 10 (2 down, 8 to go) of them?
There is indeed. Suppose 2 units are coupled and only one portion has a Train manager, the other portion is locked out of use.Is there really an agreement for that? Seems surprising to me.
There is indeed. Suppose 2 units are coupled and only one portion has a Train manager, the other portion is locked out of use.
I think it has been mentioned in another thread that since May timetable change 4 Voyagers have been diagramed ready for the HST's going ie 2x double sets. There could be some effect this week with the engineering works south of Bristol altering the diagrams.I'm pleasantly surprised XC is getting anything at all to replace the HSTs. I'd fully expected the DfT to see their removal as an opportunity to cut costs, since they've never seemed to give a toss about the ridiculous overcrowding on parts of the XC core so I didn't think they'd care if it got even worse.
But it's going to be grim on whichever services do get shortened in the meantime. I see today one of the main traditional HST services, 1V44 Leeds-Plymouth is a 2x4 coach 221/220 so it's not shortened; I wonder which services are? Or are they just going to try and work the current fleet harder and keep more in service until the extra ones arrive?
From what I've seen the train staff on the 170's don't object to standard class passengers charging their phones in first as long they don't sit in there, and just hang about outside to keep an eye out. Not at all ideal, true, but could be useful if you're desperate.I agree its a bloody pain when I'm on them from Cardiff to Birmingham New Street and from New Street to South Wigston
I'm confused is there actually anything in it in terms of more services or just more of carry on as you are?
How depressingThe latter.
Unless the fleet is expanded , it’s more of the same , which is in many cases , not good enough..
More overcrowding in the leisure sector , is not the way to grow the rail industry.
This is not strictly true. If only 1 Train Manager then you are correct, but if a caterer is also provided they are in the front portion and the double set can runThere is indeed. Suppose 2 units are coupled and only one portion has a Train manager, the other portion is locked out of use.
Does what? Book two people in one seat?
I would be very surprised if that was true or a policy.
A bone of contention for many caterers…. We don’t get any extra remuneration for being the “responsible person” in that empty set (I’m sure other TOC’s pay an extra allowance for things like that?)… I personally don’t mind it and am more than happy to deal with any eventuality but there are some that don’t feel comfortable or confident and I hope that’s addressed.This is not strictly true. If only 1 Train Manager then you are correct, but if a caterer is also provided they are in the front portion and the double set can run
Is that how Avanti use their Voyagers too?There is indeed. Suppose 2 units are coupled and only one portion has a Train manager, the other portion is locked out of use.
Do they swap every few stops, or is there deliberate policy of train manager will only ever be visible to half the passengers, and half won't have the trolley.This is not strictly true. If only 1 Train Manager then you are correct, but if a caterer is also provided they are in the front portion and the double set can run
No, all this is compatible with any rollout of GBR. It's a management contract, not a franchise.Does this all mean no Great British Railways? Franchises/contracts carrying on.
What I'm told by someone who works the trolleys is that since the reduction in capacity on the Reading - Birmingham corridor since May overcrowding is so endemic that it's simply not possible to get through the train so much of the time.Do they swap every few stops, or is there deliberate policy of train manager will only ever be visible to half the passengers, and half won't have the trolley.
My last experience of XC was neither appeared, (was Bristol to Yorkshire so not short journey), actually trolley was announced as static so had to go to it, which makes you wonder why don't just back to buffet cars.
XC just seem to have bonkers policies for passenger reassurance and maximising catering revenue
I can't understand it. It almost seems normal that a double Voyager rocks up at Banbury with one set locked out. Sometimes it is shown on the station display boards and sometimes not - really annoying.Do they swap every few stops, or is there deliberate policy of train manager will only ever be visible to half the passengers, and half won't have the trolley.
My last experience of XC was neither appeared, (was Bristol to Yorkshire so not short journey), actually trolley was announced as static so had to go to it, which makes you wonder why don't just back to buffet cars.
XC just seem to have bonkers policies for passenger reassurance and maximising catering revenue
Am I right the believe Avanti currently still have 18 221s with 2 out of the 20 already being returned as GC currently have those 2 sets. I'm wondering have any more sets been returned or are they still using them.You can be sure that if that was the intention then it would have been in the press release. Ministers wouldn't miss an opportunity like that to trumpet a potential improvement even if it's a year or so away (indeed, I doubt the 7 sets will be released until the 805/807s are ready anyway).
Also there are rumours GC maybe getting an additional 5 221s on top of the 2 sets they already have. I'm not sure if the numbers add up as I suppose speculation.GC have said nothing at all on the subject of taking any further 221s so any guess they're taking 8 more is complete speculation.
Correct, Avanti require their 18 remaining 221s until after the 80x units start to enter service.Am I right the believe Avanti currently still have 18 221s with 2 out of the 20 already being returned as GC currently have those 2 sets. I'm wondering have any more sets been returned or are they still using them.
With XC getting additional sets I assume this not going to happen until the 80x come on line??
Can't really see how GBR will be any better?
There is nothing to bid for. The service is specified centrally and run by the existing operator.Why no bidding? Was the bidding competition not the point of privatisation?
A railway planned and specified by a national body is what most people think of when they say that they want nationalisation.Can't really see how GBR will be any better?
They are only cutting costs to the bone because revenue has reduced.GBR won't be better until a new Government stops trying to cut costs to the bone.
A railway planned and specified by a national body is what most people think of when they say that they want nationalisation.
They are only cutting costs to the bone because revenue has reduced.