• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

How could Crossrail (Elizabeth Line) services be improved/extended?

Status
Not open for further replies.

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,375
If the Maidenhead terminators go to Henley that means they’re unable to go to Reading in the peak which will probably cause some trouble
There is 6tph as far as Maidenhead in the evening peak.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,351
The Elizabeth line was predominantly funded for and by Londoners.
Absolute rubbish. London City taxes and business rates come from very highly paid people taking my savings to the casino and gambling with them - taking a hefty cut whether they lose money or not. I have no choice about any of these aspects of how my savings are managed - or how much of the national taxation that I pay gets funnelled into Westminster council via the rates paid by parliament and the civil service offices.

== Doublepost prevention - post automatically merged: ==

Old Oak Common is about 0.5 miles from Willesden Junction so you’d need some teleportation or huge track curvature and demolition to get that to work!
so? The walkways/travellators at Manchester airport and even at Birmingham International (to the conference centre) must be a lot more than 880 yards.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,375
I think they are dedicated to recovery, for when the Heathrow tunnels are closed.
A train used platform 5 at Hayes & Harlington this evening.

Keeping Hayes & Harlington and West Drayton free for such issues seems a good idea.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,012
Location
London
so? The walkways/travellators at Manchester airport and even at Birmingham International (to the conference centre) must be a lot more than 880 yards.

That’s all within the same owned structure. There’s a few industries, other railway lines and the Grand Union Canal to navigate, not to mention wrangling compulsory purchase orders.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,654
A train used platform 5 at Hayes & Harlington this evening.

Keeping Hayes & Harlington and West Drayton free for such issues seems a good idea.
Keeping two very similar platforms spare for what-ifs feels excessive caution. One could be used in regular practice (there are all the turnbacks at Westbourne Park - and future state will have 4 x OOC platforms to help in troubled times) - another could do some peak extras at minimum. They'd still be useful and available for contingencies. This route actually has many options for such things.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,012
Location
London
Keeping two very similar platforms spare for what-ifs feels excessive caution. One could be used in regular practice (there are all the turnbacks at Westbourne Park - and future state will have 4 x OOC platforms to help in troubled times) - another could do some peak extras at minimum. They'd still be useful and available for contingencies. This route actually has many options for such things.

But as has been said time and time again these are not the issue - the issue is the line capacity east of Airport Junction when you include freight. Having extra platforms is beneficial, for example any problem at Heathrow allows a diversionary backup. Contingency capacity should never be sniffed at.
 

JSBark

Member
Joined
11 Aug 2023
Messages
13
Location
Brockley
Building transport infrastructure in the green belt has always been allowed, hence Cobham Services etc.
Absolutely. And as the anti Green belt lobby fail to grasp, good transport links across the Green Built mean it doesn’t stifle growth / economic development. It enables it to be planned in sustainable locations.
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,908
Location
London
They've started rolling out USB on trains starting with Unit 345003.
If it counts at an improvement on the service from some demands commuters have made.
20230909_053821.jpg345003 Unit.jpg
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,275
I wonder how often such USB sockets (like the ones on the 710s) are used, as they're hardly convenient to use unless you have a VERY long lead and can take the seat next to them.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,375
I wonder how often such USB sockets (like the ones on the 710s) are used, as they're hardly convenient to use unless you have a VERY long lead and can take the seat next to them.
The ones on a 710 don't produce very much current, to the extent they are almost useless. Hopefully the 345 ones are better.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,012
Location
London
The ones on a 710 don't produce very much current, to the extent they are almost useless. Hopefully the 345 ones are better.

Looks like you'd still need a very long lead, or be standing.
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,908
Location
London

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,275
Southeastern reinstating some of the removed trains in the timetable would be a much cheaper and quicker improvement.
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,908
Location
London
Plus cheaper than making the Elizabeth line go to Ebbs with all its complications, I'd be thinking SE could manage one or two HS1 services from St Pancras to either Cannon Street or Charing Cross an hour via Woolwich Line thru either Lewisham or Greenwich. I'm sure even with its complications it would be more feasible.
 

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,132
Location
Selhurst
St Pancras to Cannon Street? That would require a reversal at Gravesend
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,908
Location
London
St Pancras to Cannon Street? That would require a reversal at Gravesend
Yeh basically asking for a split at Gravesend with one half going on to Cannon Street or Cross and the other to Faversham or Rainham
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,623
Location
Northampton

Thoughts?
Would be nice if money was no object, but unfortunately the budget didn't stretch far enough to put Crossrail in between the North Kent tracks at Abbey Wood (Plumstead sidings may also have had a hand in that) and so you'd need a flat junction, which introduces a massive performance risk at a very, very bad place in the network. You'd also have to thread the paths through to Dartford and build an extra link/terminating infrastructure in the Northfleet/Ebbsfleet area (terminating at Dartford is the long-term option AIUI). I personally think extension of at least some of the Abbey Wood services to Dartford eventually would be very sensible, but in the shorter term upping the North Kent circulars and improving north-south bus (/light-rail) links from Southeast London to Abbey Wood/Woolwich would be a better all-round improvement.
St Pancras to Cannon Street? That would require a reversal at Gravesend
Unless you went the long way round via Ashford :lol:
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,654
The first step should be reverting to an even 6tph/10 min service via Greenwich. And find another spot for the Rainham on TL - Epsom semi-fast seems a popular vote for this.

As for future state, it feels like Dartford is the logical place to aim for. Would need its own island platform most likely.

Two options - four tracks east of Abbey Wood or truncate the Greenwich line there - but note that it would need (maybe?) to also turn 2tph via Blackheath if that line is to survive.

But eventually it should take over some existing paths beyond Dartford and free up extra loopers or Dartford local terminators, to increase inner frequency. \\

If the Bakerloo went to Hayes, there might even be more paths to play within future out of LB, although of course two Hayes are fast line and no doubt would serve precious Sevenoaks immediately.
 

Basil Jet

On Moderation
Joined
23 Apr 2022
Messages
1,090
Location
London
I notice that a surface alignment from Dartford to the corner of Bluewater Shopping Centre and Darent Valley Hospital looks like it could be contracted with no demolition.. but it might be hilly enough to need a tunnel.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,012
Location
London
There is passive provision to extend to Dartford, even if requires knocking through the lower concourse at Abbey Wood.

Not happening this decade at least I’d expect though.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,654
Could another cheapo solve be an east-facing bay at Abbey Wood, to feed. It could run another 2-4tph to Dartford and beyond - or it could take over some services which could be reallocated. I.e. the Rainham 2tph. And have Abbey Wood as an intermediate terminus.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,623
Location
Northampton
There is passive provision to extend to Dartford, even if requires knocking through the lower concourse at Abbey Wood.

Not happening this decade at least I’d expect though.
If it requires knocking through something it isn't really passive provision is it?
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,908
Location
London
The track at platform 3 imo could be used as a single working thru Abbey Wood station and then onto a two track provision just after the station towards Dartford, the track there already is being used as a temp train stabling siding for some later service or faulty trains.

Abbey Wood could still remain the main terminus of the Elizabeth Line but just have a less frequent thru service I.e Dartford to Heathrow Terminal 4 and a Dartford to Reading service, vice versa.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,623
Location
Northampton
The track at platform 3 imo could be used as a single working thru Abbey Wood station and then onto a two track provision just after the station towards Dartford, the track there already is being used as a temp train stabling siding for some later service or faulty trains.

Abbey Wood could still remain the main terminus of the Elizabeth Line but just have a less frequent thru service I.e Dartford to Heathrow Terminal 4 and a Dartford to Reading service, vice versa.
Introducing a single line section into the passenger service, even for just 2tph each way to Dartford (although it'd more likely be 4tph each way) is a wonderful way to absolutely sink the performance figures for the core. Oh, and you'd need to make sure there wasn't an Abbey Wood turnback using the single platform when the Dartford trains needed it, and AIUI you'd need to resignal/redesign the protection for the transfer track to allow passenger use.
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,908
Location
London
All true, but I'm sure allowances of sorts could always be made if it ever(ofc highly doubtful) came to realisation.
 

MPW

Member
Joined
2 Dec 2021
Messages
268
Location
Orpington
The main aims of any significant project in the area should be:
1. Better transport/connections for Thamesmead area
2. Better local connections for dartford, blue water, ebbs fleet "garden city" to gravesend. These areas, along with medway, have large sprawls nowhere near a station.
3. Rail connection across Thames (longer term I guess)

All with the ultimate aim of driving greater housing density in growing area, and more importantly modal shift away from cars in area overrun currently.

I don't think extending EL to Dartford along existing tracks achieves any of that, and would compete for the same (non-existent) resources. Though it would like nice to have the purple go further east :)

== Doublepost prevention - post automatically merged: ==

The main aims of any significant project in the area should be:
1. Better transport/connections for Thamesmead area
2. Better local connections for dartford, blue water, ebbs fleet "garden city" to gravesend. These areas, along with medway, have large sprawls nowhere near a station.
3. Rail connection across Thames (longer term I guess)

All with the ultimate aim of driving greater housing density in growing area, and more importantly modal shift away from cars in area overrun currently.

I don't think extending EL to Dartford along existing tracks achieves any of that, and would compete for the same (non-existent) resources. Though it would like nice to have the purple go further east :)
And pretty unrelated so apologies for mentioning, but close LCY! No one wants to live under a flight path, so why build so much new housing directly under one!? Can't believe only greens have suggested it.
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,902
Location
London
I'm surprised it's taken them this long to put USB ports on the 345s although with USB C becoming more prevalent, they'll probably be replaced in the next year or two.
 
Status
Not open for further replies.

Top