HS2 to the Elizabeth Line

Status
Not open for further replies.

tigerroar

Member
Joined
30 May 2010
Messages
528
Location
Gloucester
With all of the talk that HS2 might never reach Euston, is there any reason why it can't feed into the Elizabeth Line and serve central London that way?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,412
With all of the talk that HS2 might never reach Euston, is there any reason why it can't feed into the Elizabeth Line and serve central London that way?
Apart from the fact that the Elizabeth line was built for completely different purposes, using a shedload of taxes raised locally in London, and does those very well you mean?
 

tigerroar

Member
Joined
30 May 2010
Messages
528
Location
Gloucester
That last bit isn't making sense to me, but if you're going to suggest taxes then was Crossrail paid for solely by Londoners?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,334
With all of the talk that HS2 might never reach Euston, is there any reason why it can't feed into the Elizabeth Line and serve central London that way?
That is what it is doing. Old Oak Common will be an interchange between HS2 and the Elizabeth Line, with Paddington terminators extended to terminate at Old Oak Common.

[Clearly there is no possible rolling stock that could work on both HS2 and the Elizabeth Line even if they could physically be linked up.]
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,412
That last bit isn't making sense to me, but if you're going to suggest taxes then was Crossrail paid for solely by Londoners?
A significant part certainly was. The Elizabeth line was built for a reason. That shouldn't be sacrificed to bail out the current shower of so-called leaders.

== Doublepost prevention - post automatically merged: ==

That is what it is doing. Old Oak Common will be an interchange between HS2 and the Elizabeth Line, with Paddington terminators extended to terminate at Old Oak Common.

[Clearly there is no possible rolling stock that could work on both HS2 and the Elizabeth Line even if they could physically be linked up.]
True enough.
 

tigerroar

Member
Joined
30 May 2010
Messages
528
Location
Gloucester
That is what it is doing. Old Oak Common will be an interchange between HS2 and the Elizabeth Line, with Paddington terminators extended to terminate at Old Oak Common.

[Clearly there is no possible rolling stock that could work on both HS2 and the Elizabeth Line even if they could physically be linked up.]

Have they built the rolling stock already?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,334
Have they built the rolling stock already?
345s, yes. HS2 stock, no.

Only 345s can work the Elizabeth Line, due to signalling, passenger loads, configuration of the doors, and lots of other reasons.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
With all of the talk that HS2 might never reach Euston, is there any reason why it can't feed into the Elizabeth Line and serve central London that way?
24tph on the Elizabeth line and 24tph (proposed for hs2)means this wouldn't go well,, plus the hs2 trains are underground at Old Oak Common and the Elizabeth lines aren't.

Also HS2 trains will he longer than the Elizabeth line platforms.
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,566
Location
Wales
Surely the whole point of the OOC interchange is to provide a convenient connection for central London. Small comfort to those of us for whom Euston would be more convenient, never mind the ultimate convenience of direct service onto HS1, but I suppose that we should just count ourselves lucky to be getting any link at all.
 

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
Pigs will fly before I see an HS2 service from Crewe to Custom House
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,274
With all of the talk that HS2 might never reach Euston, is there any reason why it can't feed into the Elizabeth Line and serve central London that way?
There’s one big reason why not, and you’re not the first to miss it. The HS2 tracks will be at the bottom of a huge box, with the Elizabeth Line passing over them at the eastern end. It’s just not physically possible to have a track connection there.

But suggestions of either running into Paddington or onto Crossrail have been made already, in the thread here:
 
Last edited:

tigerroar

Member
Joined
30 May 2010
Messages
528
Location
Gloucester
345s, yes. HS2 stock, no.

Only 345s can work the Elizabeth Line, due to signalling, passenger loads, configuration of the doors, and lots of other reasons.
So they build the HS2 rolling stock to be compatible with these features.

== Doublepost prevention - post automatically merged: ==

There’s one big reason why not, and you’re not the first to miss it. The HS2 tracks will be at the bottom of a huge box, with the Elizabeth Line passing over them at the eastern end. It’s just not physically possible to have a track connection there.

But suggestions of either running into Paddington or onto Crossrail have been made already, in the thread here:
But the whole thing isn't finished yet. They've barely started. It's a huge hole in the ground right now isn't it? If they can change plans to omit Euston they can change the plans to alter OOC.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,374
Location
belfast
So they build the HS2 rolling stock to be compatible with these features.
The requirements for Crossrail and for HS2 are inherently incompatible though; you can't design a train that is both suitable for long-distance journeys like London-Glasgow and for tube-style journeys like on the Elizabeth line.

You're also ignoring the point that it is physically impossible to build such a connection at OOC, at least without knocking down most railways in the area, so that the rolling stock point is moot anyway
 

tigerroar

Member
Joined
30 May 2010
Messages
528
Location
Gloucester
24tph on the Elizabeth line and 24tph (proposed for hs2)means this wouldn't go well,, plus the hs2 trains are underground at Old Oak Common and the Elizabeth lines aren't.

Also HS2 trains will he longer than the Elizabeth line platforms.
Well as the trains aren't yet built, build them to fit the EL platforms.

And unless those 24tph are all rammed to capacity, simple, make them both 12tph and share the load.

== Doublepost prevention - post automatically merged: ==

The requirements for Crossrail and for HS2 are inherently incompatible though; you can't design a train that is both suitable for long-distance journeys like London-Glasgow and for tube-style journeys like on the Elizabeth line.

You're also ignoring the point that it is physically impossible to build such a connection at OOC, at least without knocking down most railways in the area, so that the rolling stock point is moot anyway
why is it physically impossible? If it's because it's underground then have them keep tunnelling to link up with the EL tunnel at Paddington.

And the train doesn't have to be compatible. As long as it has certain doors lining up with the platform doors what else would it need?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,334
And the train doesn't have to be compatible. As long as it has certain doors lining up with the platform doors what else would it need?
A pointy nose for a start unless you want HS2 trains to only go 90mph.

While you could have a train that aligns with only some of the platform access doors, the Elizabeth Line needs trains that can carry a large number of passengers standing, and fast access. If some of the doors can't be used, the dwell times will be longer and your idea of 12 trains from Shenfield to Birmingham and 12 trains from Heathrow to Abbey Wood will fail.

Therefore, the trains on the Elizabeth Libe have to have the configuration of a 345. I guess you could build a special 345 with a pointy nose but the seating arrangement isn't suitable for a high speed route.

They've barely started. It's a huge hole in the ground right now isn't it? If they can change plans to omit Euston they can change the plans to alter OOC.
That doesn't matter. The construction in that hole in the ground is all planned out. It takes many years to make those plans and the outline can't just be changed without causing a huge delay and costing a few extra billion.

They also haven't given up on going to Euston either. Indeed, the machinery to build the tunnels from Old Oak Commin to Euston is going to have to be installed very soon even if actual construction work isn't starting for some time.
 
Last edited:

stuu

Established Member
Joined
2 Sep 2011
Messages
3,766
Well as the trains aren't yet built, build them to fit the EL platforms.
Hs2 trains are going to be 400m long. EL trains are ~200m long. Losing half the capacity of HS2 is not a good idea
And unless those 24tph are all rammed to capacity, simple, make them both 12tph and share the load.
They are
why is it physically impossible? If it's because it's underground then have them keep tunnelling to link up with the EL tunnel at Paddington.
That would cost billions, delay everything by a decade, as no planning permission or design is in place, and close the EL for a considerable time
And the train doesn't have to be compatible. As long as it has certain doors lining up with the platform doors what else would it need?
Its just a bad idea all round. Running a metro train to Birmingham on a brand new high speed line is not a good idea
 

350401

Member
Joined
5 Feb 2009
Messages
310
I've been to the OOC site for a tour, and I can tell you it is physically impossible to join the two lines given the depth of the HS2 station box, and where the Elizabeth line. You'd be looking at a DLR style ski-ramp to get from the box up to street level. If you didn't have the box, and built at ground level, it could be do-able but you'd have to level a lot more of Acton - certainly the houses between the Victoria crossover box and the station box.
 

SynthD

Established Member
Joined
4 Apr 2020
Messages
2,034
Location
UK
This would be far more of a sabotage to either services than the issue that caused the suggestion.
 

tigerroar

Member
Joined
30 May 2010
Messages
528
Location
Gloucester
I've been to the OOC site for a tour, and I can tell you it is physically impossible to join the two lines given the depth of the HS2 station box, and where the Elizabeth line. You'd be looking at a DLR style ski-ramp to get from the box up to street level. If you didn't have the box, and built at ground level, it could be do-able but you'd have to level a lot more of Acton - certainly the houses between the Victoria crossover box and the station box.
tunnel through to Paddington then!

and it wouldn't be a metro train to Birmingham, they'd be EL length trains built to HS2 standards. Passengers would only be allowed to join the train at EL stations en route to Brum.

And are all northbound inter City services going to go via HS2 instead of Euston, thus 24tph?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,334
and it wouldn't be a metro train to Birmingham, they'd be EL length trains built to HS2 standards. Passengers would only be allowed to join the train at EL stations en route to Brum.
How is that going to be managed? Your suggestion reduces the capacity of the Elizabeth Line to do what it is intended to do. Would the HS2 trains extend to Abbey Wood or Shenfield?

tunnel through to Paddington then!
I don't see how that reduces costs. As someone pointed out above, building the junction would require the Elizabeth Line to be shut for some time.

And are all northbound inter City services going to go via HS2 instead of Euston, thus 24tph?
HS2 will not have 24 trains an hour. 18 is the limit, and needed 11 platforms at Euston plus the eastern leg to provide the appropriate number of destinations.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
tunnel through to Paddington then!
How would it connect at Paddington, you already have the EL portal? Where would these services terminate, you'd need at least 7 platforms to turn around the HS2 services.

And you'd need to fit these services in with existing Elizabeth line services, which wouldn't be possible.
they'd be EL length trains built to HS2 standards.
And HS2 is planned to send 400m trains to the big cities...
And are all northbound inter City services going to go via HS2 instead of Euston, thus 24tph?
img_59_1.jpg
 