There is a useful discussion of the options for GWR with EMU in the speculative discussions section: A GWR Intercity EMU?
IF the line was retimed to 110 then what would be the actual cost? Could an extra path be squeezed out of the line?
I recognise having trains limited to 110 is not ideal, but other routes seem to manage.
IF the line was retimed to 110 then what would be the actual cost? Could an extra path be squeezed out of the line?
I recognise having trains limited to 110 is not ideal, but other routes seem to manage.