devon_belle
Member
I've seen various posts in threads (recent and old) about problems with Clapham Junction station. In a world with a bit more rail funding, what would you realistically do to the station, assuming that you can close significant parts at the station for an extended period of time.
For passengers, first, I'd construct a new subway/footbridge on the London end, to alleviate congestion when crossing the station. Escalators onto either footbridge/subway would also be better for older/slower passengers who do not get the lifts.
P16 and P17 are hardly used, so I would remove them and use the space to slue the Brighton local lines into a more sensible formation which could have a higher approach speed. Also, moving the junction Up to beyond the London end of the station would hopefully mean no more extensive overlaps.
After the slueing, there could be room to ease the curvature out the other two SR and four (five) SWR tracks on this side of the station. I'm not proposing an increase to line speed, but installing an unplatformed through road if it would fit, since P8 can't really be used anyway. If I can fit in shallower curves to the platforms, maybe the unplatformed overtaking line would be more useful on the down SWR fast line? Either way, a faster entry speed to what is now P7 would be crucial. (P.s., is P8 ever used for overtaking?)
I think the Windsor/Overground side of the station works quite well at present. I don't know if there is use for a platform 0? If so, this could be included in my (generous) budget.
Just brainstorming! Interested to hear what people would do, and why my ideas are bonkers
For passengers, first, I'd construct a new subway/footbridge on the London end, to alleviate congestion when crossing the station. Escalators onto either footbridge/subway would also be better for older/slower passengers who do not get the lifts.
P16 and P17 are hardly used, so I would remove them and use the space to slue the Brighton local lines into a more sensible formation which could have a higher approach speed. Also, moving the junction Up to beyond the London end of the station would hopefully mean no more extensive overlaps.
After the slueing, there could be room to ease the curvature out the other two SR and four (five) SWR tracks on this side of the station. I'm not proposing an increase to line speed, but installing an unplatformed through road if it would fit, since P8 can't really be used anyway. If I can fit in shallower curves to the platforms, maybe the unplatformed overtaking line would be more useful on the down SWR fast line? Either way, a faster entry speed to what is now P7 would be crucial. (P.s., is P8 ever used for overtaking?)
I think the Windsor/Overground side of the station works quite well at present. I don't know if there is use for a platform 0? If so, this could be included in my (generous) budget.
Just brainstorming! Interested to hear what people would do, and why my ideas are bonkers
