An update on WNXX yesterday of the Class 93s progress, 001 is at Worksop and available to the 'rail industry' for inspection, 002 is on test in Romania while 003 to 008 are either completed or being completed, it seems that there are rumours that potential users could include DRS and Trans Pennine, mind you there are potential rumours that my wife is getting one to do the shopping at Waitrose, we shall see with the passing of time
The TPE one has been a long standing rumour and gathered pace when it was announced the Trans Pennine route would be electrified.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

43096

On Moderation
Joined
23 Nov 2015
Messages
18,728
An update on WNXX yesterday of the Class 93s progress, 001 is at Worksop and available to the 'rail industry' for inspection, 002 is on test in Romania while 003 to 008 are either completed or being completed, it seems that there are rumours that potential users could include DRS and Trans Pennine, mind you there are potential rumours that my wife is getting one to do the shopping at Waitrose, we shall see with the passing of time
So reading between the spin, there’s nothing signed up yet. If I was ROG I would be very, very concerned.
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,284
Location
Back in Sussex
So reading between the spin, there’s nothing signed up yet. If I was ROG I would be very, very concerned.

It does seem rather airy fairy but I guess Star Capital don't intend throwing their investors money into the four foot, to me it's only right that any ongoing negotiations are not in the public domain until contracts are ready to be signed, although someone will no doubt spill the beans on social media fairly soon
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,728
It does seem rather airy fairy but I guess Star Capital don't intend throwing their investors money into the four foot, to me it's only right that any ongoing negotiations are not in the public domain until contracts are ready to be signed, although someone will no doubt spill the beans on social media fairly soon
You’d have thought they would have contracts all-but-signed-up before placing an order with Stadler.
 

92002

Established Member
Joined
27 Mar 2014
Messages
1,251
Location
Clydebank
An update on WNXX yesterday of the Class 93s progress, 001 is at Worksop and available to the 'rail industry' for inspection, 002 is on test in Romania while 003 to 008 are either completed or being completed, it seems that there are rumours that potential users could include DRS and Trans Pennine, mind you there are potential rumours that my wife is getting one to do the shopping at Waitrose, we shall see with the passing of time
Presumably once they are accepted and are in numbers the plan could be to tender for the Caledonian Sleeper contract when it's up for renewal.
 

Richard Scott

Established Member
Associate Staff
International Transport
Railtours & Preservation
Joined
13 Dec 2018
Messages
4,575
Presumably once they are accepted and are in numbers the plan could be to tender for the Caledonian Sleeper contract when it's up for renewal.
Looks likely 99s in pipeline for Caledonian Sleeper.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,728
Presumably once they are accepted and are in numbers the plan could be to tender for the Caledonian Sleeper contract when it's up for renewal.
GBRf have just signed a 7-year contract to provide traction for the Caledonian Sleepers, so they'll have a bit of a wait.
 

Put Kettle On

Member
Joined
2 Apr 2019
Messages
57
Location
Here & there , but mainly there .
Last edited:

Speed43125

Member
Joined
20 Jul 2019
Messages
1,172
Location
Dunblane

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,300
Nonetheless, I agree we probably have to accept there isn't any obvious publicly visible work lined up for the 93s.
apart from moving EMUs around the country. The talk I heard explained that the practicalities of the current system (loco, fitted head of freight wagons, unbraked EMU plus the same in reverse order, and slow linespeed taking paths and massively heightened crew costs) means that there really are big savings to be made from a loco which can couple up, work the EMU brakes and go wherever it needs to go at linespeed. Was it in the Merseyrail stock thread that the formation and logistics of a recent move were described?
Even when the current deliveries are completed there will then be fleets going for overhaul.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,728
apart from moving EMUs around the country. The talk I heard explained that the practicalities of the current system (loco, fitted head of freight wagons, unbraked EMU plus the same in reverse order, and slow linespeed taking paths and massively heightened crew costs) means that there really are big savings to be made from a loco which can couple up, work the EMU brakes and go wherever it needs to go at linespeed. Was it in the Merseyrail stock thread that the formation and logistics of a recent move were described?
Even when the current deliveries are completed there will then be fleets going for overhaul.
Those savings are wiped out by the cost of using brand new locos.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,300
Those savings are wiped out by the cost of using brand new locos.
Really? Even if your loco depreciation [edit: On your life-expired non EMU-compatible locos] is nil (with no enhanced maintainance cost either) I can't believe that all the shunting and slow speed running (and consequent crew costs) will outweigh the price of using the new locos. I would guess that slow-speed paths are charged at a premium rate on congested lines too.

Anyway, I wouldn't think many of our UK fleet replacements would have been justified on your criteria as we haven't had a step-change in service levels since the Pendolinos were introduced, so all could probably have been done with old locos!

I suppose we shall see which is the correct answer when the 93s are available for traffic.
 
Last edited:

43096

On Moderation
Joined
23 Nov 2015
Messages
18,728
Really? Even if your loco depreciation is nil (with no enhanced maintainance cost either) I can't believe that all the shunting and slow speed running (and consequent crew costs) will outweigh the price of using the new locos. I would guess that slow-speed paths are charged at a premium rate on congested lines too.
Depreciation is not nil if ROG own the asset! How else do you think the capital cost is accounted for?
 

SuperLuke2334

Established Member
Joined
23 Oct 2021
Messages
1,898
Location
Welsh Marches
Sorry to bump this thread, can someone please remind me what the power output for each traction mode is... e.g. AC, battery and diesel?

And does the diesel work with the batteries or as a separate mode?
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,300
Sorry to bump this thread, can someone please remind me what the power output for each traction mode is... e.g. AC, battery and diesel?

And does the diesel work with the batteries or as a separate mode?
Try Wikipedia. It's all in the first paragraph!
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
ROG website says


Yet it cant use its own motive power to move this engine
The engine might not be cleared by the relevant people to be used on the mainline, even if dragged.
Knowing ROG if they could have moved it themselves I’m sure they would have.
 

The_Train

Established Member
Joined
2 Jun 2018
Messages
5,247
Would a move to Loughborough Works be for some form of planned mod work as opposed to just storage would we suspect?
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
Would a move to Loughborough Works be for some form of planned mod work as opposed to just storage would we suspect?
Who knows until it’s announced what it’s there for!
That’s could be its base for testing?
No one knows!
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,596
Location
South Staffordshire
Who knows until it’s announced what it’s there for!
That’s could be its base for testing?
No one knows!
Exactly. AFAIK it hasn't raised it's pan on NR metals yet, although 93002 is rumoured to have been active in Romania.

Too much premature speculation in my view
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
Exactly. AFAIK it hasn't raised it's pan on NR metals yet, although 93002 is rumoured to have been active in Romania.

Too much premature speculation in my view
Exactly!

Everyone has there own thoughts, opinions about why things are happening, thinking they know better than anyone else.

Until the operator in question announces there plans, we are are in the dark, and just need to wait.

People judging ROG should be aware it may not even be ROG involved with the plans for the loco at the moment, it could be the builder/financier who are In control of what is happening.
 

The_Train

Established Member
Joined
2 Jun 2018
Messages
5,247
Jeez, I only asked a question. It appears the answer to my question was "we don't know" but thanks for taking so much of your time to go on the attack both :rolleyes:
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,284
Location
Back in Sussex
nor were the 700's but they were hauled through the tunnel

You'd have to ask Network Rail about that then, there are, obviously, different rules for different traction types, take Stadler 756s which are hauled via HS1 without barriers while Stadler 777s travel via the classic lines needing an array of barrier and brake force wagons



** Update 19th August **


Reported on WNXX that 93001 has been returned to Worksop from Loughborough by road
 