Railperf
Established Member
- Joined
- 30 Oct 2017
- Messages
- 3,683
We keep pointing out that the GEML timetable - based on timings for older & slower trains - is slack enough for most trains to be able to coast around and easily keep time. Of course being an intensively used two track railway - any serious incident - infrastructure related or train breakdown - causes bad delays.GA are always near the top for on time arrivals. Are the regionals getting full now given the big uplift in seats available
== Doublepost prevention - post automatically merged: ==
the 755's have transformed the regional services. Just the service frequency lets it down. Would be good to see half-hourly frequency. And a speed up - where possible from 75mph to 90mph top speeds.Absolutely. The Norwich to Sheringham, Cambridge & East Suffolk routes excel. I cannot speak for Ipswich/Cambridge but from what I witness it’s very buoyant.
The two hourly Peterboro - Ipswich service frequency is ridiculously poor. A faster more frequent service would probably tempt more people onto those trains.
Last edited:
