• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Restoration of the Peak Line

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bartsimho

Member
Joined
17 Jan 2023
Messages
623
Location
Chesterfield
There have been various suggestions for a 'third line' around New Mills South Jn-Chinley. This might serve a number of purposes, such as allowing New Mills Central terminators to extend to Chinley; enabling returning empty stone trains to be held between Eastbound and Westbound tracks before Chinley North Junction; or allowing Chinley to be used as a more effective turning point in either direction in cases of engineering work on either side.

It is worth noting that the original quadrupling only took place in 1929 to facilitate greater use of Gowholes Yard as a freight staging point or for attaching banking locomotives for heavier trains towards Millers Dale. Neither of these functions is really relevant today.
Neither of those functions might be relevant today but functions can change over time and nearly 100 years is enough for it to change. Especially as we have moved towards a high frequency passenger railway since then. So does this old idea have legs in the new world. I say it does.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,714
Location
Hope Valley
Neither of those functions might be relevant today but functions can change over time and nearly 100 years is enough for it to change. Especially as we have moved towards a high frequency passenger railway since then. So does this old idea have legs in the new world. I say it does.
As a regular user of the Hope Valley Line (through to/from Manchester and Sheffield) I often experience delay around Chinley and agree that a suitably-configured ‘third line’ would be very useful. However, this is only loosely connected to the Peak Line concept.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,487
Location
A typical commuter-belt part of north-west England
As a regular user of the Hope Valley Line (through to/from Manchester and Sheffield) I often experience delay around Chinley and agree that a suitably-configured ‘third line’ would be very useful. However, this is only loosely connected to the Peak Line concept.
How much in cost factor terms and project time allowance do you envisage for this "suitably configured third line" at 2023 prices?
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,714
Location
Hope Valley
Well, the works at Dore and Bamford have recently been reported as costing £137million and have taken about 25 years to fructify.

Hopefully Chinley to New Mills South might avoid the need for statutory powers but is a bit longer.
 