The current journey is only averaging 60-70mph, getting more of the mainline to 100mph would be a much better spend of cash.
Thereisnt really anywhere left that can easily go to 100. London side of Chelmsford it’s 90 for signal spacing to get the 2 min headways, country side of Chelmsford it’s 100 except for Colchester (90, but everything stops), Manningtree for the station, junction and Cattawade viaduct, Ipswich for the tunnel and station (but everything stops) the down at Stowmarket (90) for the loop pointwork and the station and the approaches to Trowse.
Even if you made Manningtree 100, at considerable expense (it would need a new alignment round the back of Manningtree, and a new viaduct) it would save a half minute at most, and nothing for anything stopping there.
As ever with the Norwich services, by far the cheapest and best value solution to speeding up the Norwich services is to take out stops.
