Only two 745s stopped today at Norwich so 18 are out & about somewhere.So the question being avoided, how many 745's (both 0 and 1) are out of use a day, and why?
Only two 745s stopped today at Norwich so 18 are out & about somewhere.So the question being avoided, how many 745's (both 0 and 1) are out of use a day, and why?
So the question being avoided, how many 745's (both 0 and 1) are out of use a day, and why?
Speed upgrades would have meant that the service would only need 9 745s, and some of the services were planned for 720s.And how is the shortfall in 745/0s caused by Covid?
The additional 755s were for additional services (such as Lowestoft to London direct) which never happened.Fewer 755s (if there are spare units to be used on Norwich services)
Is it? Even if they only replaced some of the fleet they'd have still ordered too few 745/0s as they'd still be going of the plan to speed up the services.But isn't that the flaw with such sweeping "big bang" fleet renewals, rather than just replacing stock as it's life expired, that circumstances change.
Speed upgrades would have meant that the service would only need 9 745s, and some of the services were planned for 720s.
Probably a better question is how many diagrams are there per day allocated for both intercity and stansted units - and how many are actually being substituted by 755 or 720 units?
Based on @dk1 Reply above, there are two Norwich diagrams that would usually be allocated to 745's that now seem to have pairs or triple 755's allocated to them. And it seems at least one of the Stansted diagrams per day - still only 2 to 3 off peak vice 4 originally - are being filled by 720's.
But there were no speed upgrades planned or even proposed (there still aren’t). The journey time improvement would have come from a timetable recast. And that hasn’t happened because of Covid.
![]()
Rail upgrade between Norwich and London worth �2.5bn to the east - but Norwich in 90 at least a decade away
Faster Norwich to London trains will boost East Anglia's economy by �2.5bn, experts have estimated – but only five minutes are expected to…www.edp24.co.uk
![]()
Rail upgrade between Norwich and London worth �2.5bn to the east - but Norwich in 90 at least a decade away
Faster Norwich to London trains will boost East Anglia's economy by �2.5bn, experts have estimated – but only five minutes are expected to…www.edp24.co.uk
Travelling to London on Sunday with Hare fare tickets. If 755s don't run to London on Sundays I presume those trains with no 1st class (08:25 from Norwich) are usually Stansted units without tables. Is that correct?They do not get uncoupled once in service. They are prepped as one train then remain together on a 745 diagram. Both the 06:28 and 07:26 are formed thus returning at 09:00 and 10:00 respectively and stay on those circuts all day.
== Doublepost prevention - post automatically merged: ==
Saturdays are similar with no Sundays yet.
yes that unit proceeds ontoTravelling to London on Sunday with Hare fare tickets. If 755s don't run to London on Sundays I presume those trains with no 1st class (08:25 from Norwich) are usually Stansted units without tables. Is that correct?
Travelling to London on Sunday with Hare fare tickets. If 755s don't run to London on Sundays I presume those trains with no 1st class (08:25 from Norwich) are usually Stansted units without tables. Is that correct?
Thank you @pokemonsuper9 & @dk1 .
Going as a family of 4 (only £44 rtn, excellent value) so may wait until 9 for a table instead. Before your previous post I was hoping it would be a 755 rather than a 745/1.
Whichever train we take it will be the first time my youngest has been further south than Ipswich on the GEML so she is really looking forward to the trip and going through Ipswich tunnelYou’re most welcome mate. One of the reasons for using 755s has been mentioned internally as tables but it’s causing some horrendous overcrowding. Surely seats come first.
Whichever train we take it will be the first time my youngest has been further south than Ipswich on the GEML so she is really looking forward to the trip and going through Ipswich tunnel![]()
That was due to the MTIN reliability nosediving after GA cut back on maintenance awating the new fleets.In some ways Covid bailed them out from a chronic rolling stock shortage.
In the months leading up to covid there was up to 100 short forms a day.
Makes you wonder how they coped with pairs and triples of 170s pre 2004 (and occasionally after that).You’re most welcome mate. One of the reasons for using 755s has been mentioned internally as tables but it’s causing some horrendous overcrowding. Surely seats come first.
Single 170 on the 15:00 ex-LivSt to Yarmouth. Remember only 2 coaches of standard class & a buffet counter/conductors office to boot. Trains were much less busy then.That was due to the MTIN reliability nosediving after GA cut back on maintenance awating the new fleets.
Makes you wonder how they coped with pairs and triples of 170s pre 2004 (and occasionally after that).
Yes but they got it seriously wrong and the rolling stock shortage, already bad, was about to get worse before COVID saved their bacon due to the original rolling stock plan being unrealistic and running late.That was due to the MTIN reliability nosediving after GA cut back on maintenance awating the new fleets.
Makes you wonder how they coped with pairs and triples of 170s pre 2004 (and occasionally after that).
Well, there was plenty of unofficial 110mph running with Class 86's in the early days - in fact most of the RPS GEML fastest times featured loco hauled speeds well in excess of 100mph.That was often spoken about in the media back then but Network Rail & anybody in the know never expected anything above 100mph. Although weekend timings are faster some of those on weekdays have actually reduced by 5 or so minutes and that is with excessive dwell times en-route.
Well, there was plenty of unofficial 110mph running with Class 86's in the early days - in fact most of the RPS GEML fastest times featured loco hauled speeds well in excess of 100mph.
A triple 755 consist comprised of 2 X 755/4 and a single 755/3 isn't too bad,but the triple 755 made up of 2x 755/3 with a single 755/4 is tight. Worse still, the double 755/4 consist is woefully short of seats but still better than no train at all.You’re most welcome mate. One of the reasons for using 755s has been mentioned internally as tables but it’s causing some horrendous overcrowding. Surely seats come first.
Different from today where I guess the whole cab displays would be lighting up like mad, followed by an unpleasant invite in to the managers officeFlordon Dip was superb. Some said it was punching 120mph with coaches oscillating & tables shaking. Great days.
Thanks for the clarification.But there were no speed upgrades planned or even proposed (there still aren’t). The journey time improvement would have come from a timetable recast. And that hasn’t happened because of Covid.
The current journey is only averaging 60-70mph, getting more of the mainline to 100mph would be a much better spend of cash.That was often spoken about in the media back then but Network Rail & anybody in the know never expected anything above 100mph. Although weekend timings are faster some of those on weekdays have actually reduced by 5 or so minutes and that is with excessive dwell times en-route.
Thanfully i can confirm that the Stadlers don't oscillate and the tables dont shake at 120mph lolFlordon Dip was superb. Some said it was punching 120mph with coaches oscillating & tables shaking. Great days.
A timetable recast to take into account the newer rolling stock better performance and actual SRT's should do the trick..been promised for some time..not looking likely for a while yet.Thanks for the clarification.
The current journey is only averaging 60-70mph, getting more of the mainline to 100mph would be a much better spend of cash.
Wouldn’t be possible with the current fleet.Different from today where I guess the whole cab displays would be lighting up like mad, followed by an unpleasant invite in to the managers office
Thanks for the clarification.
The current journey is only averaging 60-70mph, getting more of the mainline to 100mph would be a much better spend of cash.
Depends on if you're measuring infrastructure speed or pathing speed/ reality of congestion but the point is the same,Wouldn’t be possible with the current fleet.
== Doublepost prevention - post automatically merged: ==
Not really as it’s already 100mph Norwich to Chelmsford, 85 to Shenfield then 90 to Maryland. Any change on that would be very negligible.
Depends on if you're measuring infrastructure speed or pathing speed/ reality of congestion but the point is the same,
Ipswich Mainline drivers and conductors signed Class 321s too.Liverpool Street Anglia drivers signed them. Also most Senior Conductors & some conductors did too.
Ipswich Mainline drivers and conductors signed Class 321s too.
Liverpool Street drivers have Class 720 work today.