Or just 231s? Or is the entire fleet required to run Rhymney-Penarth services?
I believe nearly the entire fleet is in use on Rhymney line services so would make sense to get the 756s doing something in service ASAP and free up the 150s
 

Jez

Established Member
Joined
22 Jan 2011
Messages
2,342
Location
Neath
I believe the Penarth-Rhymney line requires 9 diagrams. Most of which are 231s (with the odd Sprinter sometimes used) so with a couple of 231s for maintenance each day that is the entire fleet.

It would make sense to put any 756's that are ready for service on the Rhymney route and move the 231s to where they are meant to be going, Maesteg, Ebbw Vale and Cheltenham, once the remaining 170s have gone if they want to free up more Sprinters.
 
Joined
22 Jun 2013
Messages
610
I believe the Penarth-Rhymney line requires 9 diagrams. Most of which are 231s (with the odd Sprinter sometimes used) so with a couple of 231s for maintenance each day that is the entire fleet.

It would make sense to put any 756's that are ready for service on the Rhymney route and move the 231s to where they are meant to be going, Maesteg, Ebbw Vale and Cheltenham, once the remaining 170s have gone if they want to free up more Sprinters.
Except that the Rhymney line doesn't have any OHLE in place so would be tricky.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,731
Location
Selby
Except that the Rhymney line doesn't have any OHLE in place so would be tricky.
The diesel generators in the 756s produce more power than a 2-car Sprinter and about the same as a 3-car Pacer – sure, the train is probably a bit heavier, but with electric traction is that not enough to keep to time on those slow branch lines?
 
Joined
22 Jun 2013
Messages
610
756s are bi mode. No technical reason why they couldn't run entirely on diesel as an interim measure.
The diesel engine is for back up only, could not run the whole line on diesel/battery. These are the tech. details (from Wikipedia page);

  • On AC power:
  • 2,600 kW (3,500 hp)
  • On battery power:
  • 1,300 kW (1,700 hp)
  • On diesel power:
  • 480 kW (640 hp)
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
6,042
I believe the Penarth-Rhymney line requires 9 diagrams. Most of which are 231s (with the odd Sprinter sometimes used) so with a couple of 231s for maintenance each day that is the entire fleet.

I realise that availability is never going to be 100% but I'm surprised that maintenance would take 2 units out of a fleet of 11 out of service every day.
 

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
I don't recall seeing anything that the 756 diesels are explicitly for backup only, so in the absence of anything to contrary assuming that they could run indefinitely on diesel seems reasonable enough.

That said, even though the 756 diesel does generate 54 kW more power than both engines on a 150 combined, they may still struggle a bit given that a 756 will weigh a fair bit more, and not all of the engine output will make it to the traction system.

Fuel capacity will almost certainly also be a limiting factor to diagramming flexibility.
 

Jez

Established Member
Joined
22 Jan 2011
Messages
2,342
Location
Neath
I realise that availability is never going to be 100% but I'm surprised that maintenance would take 2 units out of a fleet of 11 out of service every day.
2 units was a guess based on how many are usually taken out for maintenance from a fleet of trains..

Perhaps just 1 is taken out daily.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,844
Location
Croydon
756s are bi mode. No technical reason why they couldn't run entirely on diesel as an interim measure.
Not really enough diesel power.
The diesel generators in the 756s produce more power than a 2-car Sprinter and about the same as a 3-car Pacer – sure, the train is probably a bit heavier, but with electric traction is that not enough to keep to time on those slow branch lines?
I think it is the lack of overhead wires that will limit the 756s.
Pretty poor if a bi-mode can’t run a two hour round trip on diesel.
Not enough diesel power compared to a 231 - just 25% iirc.

The power car on a flirt has space for four power modules.
On a 231 all four modules are diesel engine modules.
On a 756 only ONE module is a diesel engine and three modules are batteries.
That is if I remember correctly but I am sure it was a lot less diesel power on a 756 than on a 231 because I remember being disappointed that 756s won't be as powerful on diesel as a 231. Blame the batteries !.
 
Last edited:

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,908
Location
Cambridge
And it’s so ironic, serviceable 756s waiting for Caerphilly wires and Pontypridd wires waiting for serviceable 398s.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,731
Location
Selby
So why not use the 756s on the lines through pontypridd?
Until the wires are switched on (which I don't think has happened yet) it's no better. Even when the wires are switched on, are the Rhondda lines cleared for 756s as there was never any plan to run them there? Is the power supply sufficient for them, when I would imagine they will draw more current than the 398s?
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,159
Why don’t they just start the 756’s on the Radyr to Coryton service which already has live wires on the City Line in west Cardiff?
 

markymark2000

On Moderation
Joined
11 May 2015
Messages
5,138
Location
Great Britain
Why don’t they just start the 756’s on the Radyr to Coryton service which already has live wires on the City Line in west Cardiff?
That would be a waste of a train. The city line doesn't carry enough passengers to 1/4 fill a 153, let alone a 4 carriage train. Complete waste.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,159
That would be a waste of a train. The city line doesn't carry enough passengers to 1/4 fill a 153, let alone a 4 carriage train. Complete waste.
I was just thinking that it would be somewhere to use a modern train which was also partly wired and would help with crew familiarisation ready for the longer trips to the heads of the valleys. It would also get rid of smelly unreliable diesels in high population areas. Selective door opening would be used for the shorter platforms. It might also boost passenger numbers once people realise that they have modern trains. More members of the public would also see that an improvement has at long last happened. I thought that some of the 756’s had three cars rather than four?
 
Last edited:

SuperLuke2334

Established Member
Joined
23 Oct 2021
Messages
1,898
Location
Welsh Marches
That would be a waste of a train. The city line doesn't carry enough passengers to 1/4 fill a 153, let alone a 4 carriage train. Complete waste.
Pretty sure the 3-car 756s were for Coryton. But yes I get your point. I imagine they want to try and induce growth with the South Wales Metro.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,908
Location
Cambridge
That would be a waste of a train. The city line doesn't carry enough passengers to 1/4 fill a 153, let alone a 4 carriage train. Complete waste.
How is it a waste when the alternative is having them sat around doing jack? We’ve established they can’t run on Rhymney yet. Mind you, aren’t they intended for the unelectrified Vale of Glamorgan?
 

SuperLuke2334

Established Member
Joined
23 Oct 2021
Messages
1,898
Location
Welsh Marches
How is it a waste when the alternative is having them sat around doing jack? We’ve established they can’t run on Rhymney yet. Mind you, aren’t they intended for the unelectrified Vale of Glamorgan?
They are, as well as Barry Island and Penarth, however whether some parts of them are due to be electrified or not I don't know...
 

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,635
Location
wales
I was just thinking that it would be somewhere to use a modern train which was also partly wired and would help with crew familiarisation ready for the longer trips to the heads of the valleys. It would also get rid of smelly unreliable diesels in high population areas. Selective door opening would be used for the shorter platforms. It might also boost passenger numbers once people realise that they have modern trains. More members of the public would also see that an improvement has at long last happened. I thought that some of the 756’s had three cars rather than four?
And mean more dmus available for other services or to be on standby on Bidston services up north
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,874
Pretty poor if a bi-mode can’t run a two hour round trip on diesel.
Tri-mode. Not bi-mode - don't forget the batteries replacing some of the diesel generators in the middle power module/vehicle.

Indeed, the diesel engine is just a backup in case the batteries run out in a tunnel.
Or between Cardiff and Barry/Barry Island/Penarth/Bridgend which are currently not planned to be wired (because those lines still belong to Network Rail and are therefore the responsibility of the UK Government unlike the Core Valley Lines which have transfered to Welsh Government control).

And it’s so ironic, serviceable 756s waiting for Caerphilly wires and Pontypridd wires waiting for serviceable 398s.
It will be ironic once the Pontypridd wires are ready, but are they yet?

How is it a waste when the alternative is having them sat around doing jack? We’ve established they can’t run on Rhymney yet. Mind you, aren’t they intended for the unelectrified Vale of Glamorgan?
Yes, they are meant to be the main (only) stock for the Vale Of Glamorgan. From what I recall around the time of the franchise announcements, KeolisAmey's winning bid promised 100% electric operation on the Welsh Government's bit of track (Core Valley Lines) through the batteries and pantographs on the 756s and 398s. Use of the diesel engine on the 756s north of Cardiff was therefore not part of the plan, but no such commitments were made for the Vale Of Glamgorgan so at the time I assumed that that batteries on the 756s did not have sufficient range to do Cardiff to Bridgend (via Barry) and back so the diesel engine was required for that. I do however also recall reading later that the 756s may in fact be able to go the distance without firing up the diesel at all, but I don't think it was certain.
 