I'd be amazed if anyone could make Barry Island look anything other than dilapidated and run down, frankly.
By seaside standards I wouldn’t have said it’s *that* bad. There’s a lot worse places IMO.
I'd be amazed if anyone could make Barry Island look anything other than dilapidated and run down, frankly.
A lot of things that are managed by the Welsh Government or pseudo agencies of them are a disaster at present in my opinion.
I would say it is not an apparently out of control project on the scale of Crossrail/Elizabeth-line which was nothing to do with anything Welsh. Now the Elizabeth line is up and running it is apparent that it is very popular and all the past delays are forgotten. No pain without gain. In the case of the Valleys lines falling foul of Victorian engineering that is probably not very well documented at all and geological features that are more unreliable since global warming gave us so much more rain then prolonged drought.I think the point that is being made is that to discover an embankment problem so late in the work, or so it would appear, after several extensions to the finish date asks the question how could this be discovered so late? Or on the other hand why do you keep giving new completion dates, surely you should be at a stage when you know what is left to do and the issues that may affect this work. I can see why the travelling public would not be impressed.
Well this AM on the Merthyr Line was magic....... Got there for the 5:35am bus replacement, and the guy waiting for the train said there are trains. The board said trains were running, the TFW app did and National rail did! I mentioned announcement on Twitter but nowhere else it appears, except belatedly buried in Journey check on the TFW website. Loads did not get on the first bus as they were waiting for the trains. One woman I talked do on the bus back was late for work by one hour as she believed the trains were running. That is a poor state of affairs and one TFW person gave the 'wrong times' for the bus replacements, until I pointed it out, and they corrected them! The only good thing I suspect is people will know tomorrow but the handling of all this has been appalling!
On the Cadoxton board towards Cardiff this morning, it had Barry Island as the destination, and delayed, as National Rail screwed that up something rotten! It is a good job I check everything as it is so hard to trust them to make things known when engineering work over runs like this!
TfW Journeycheck saysYes, the old ramp is not fit for H&S and wheelchair access etc. So they have build a level access which is not yet active. I believe it will be next week perhaps Thursday, according to a poster in Pontypridd Railway Station - but that could yet change!
Quakers Yard: Station Closed
Quakers Yard station will be closed from 05:00 on 16/06/2023 until further notice due to urgent repairs to the railway.
Additional Information
Rail replacement bus will be servicing Quakers Yard to Merthyr Vale and Abercynon for connecting trains.
Last Updated:20/06/2023 08:08
I had a walk down to the station at Quakers Yard yesterday to see what was going on. A large army of people were busy working on the down platform. When I asked I was told the work would take some days and to take the bus. I guess like everything else here it will be finished when it's finished.When I travelled up last Saturday we went through on the new line alongside the new platform at Quaker's Yard. Don't know if the down trains use the old line or if the new up line is now the default in both directions.
== Doublepost prevention - post automatically merged: ==
Work has started on extending the double track section at Tirphil on the Rhymney line. A new point is in place about a mile north of the existing end of the double track and the formation is being prepared in between. It should give just enough time for a 15 minute return journey to Rhymney with 2 stops at Pontlottyn to achieve the 4 tph to Rhymney in the Metro plan. There won't be much turnaround time at Rhymney.
2tph Coryton to Penarth and 2tph Caerphilly to Penarth. If the loop at Rhiwbina hadn't been dropped you'd get 4tph on the Coryton branch.I don't think that all the Penarth trains will be to/from Coryton (otherwise they would just get 2 tph).
I do not believe there has ever been direct track between Coryton and Radyr. The line used to extend from Coryton north to Treforest where it should have but didn't join up with the Taff Vale.
Was supposed to be at rhiwbina at the moment now only going to be 2tphIs a loop planned on the Coryton line? If not, 2tph max.
The other branches have a section of double track immediately south of the terminus, implying trains will pass very close to it, allowing more turnaround time. Is that not planned for the Rhymney branch?Work has started on extending the double track section at Tirphil on the Rhymney line. A new point is in place about a mile north of the existing end of the double track and the formation is being prepared in between. It should give just enough time for a 15 minute return journey to Rhymney with 2 stops at Pontlottyn to achieve the 4 tph to Rhymney in the Metro plan. There won't be much turnaround time at Rhymney.
Do we know where this is likely to be situated? Do Dingle Road or Penarth have the space to implement a double track or is it going to be one of these dynamic passing loops?There is a passing loop planned for Penarth to allow an increase in capacity
I believe it's being finalised but will have to be a dynamic one somewhere, as you say there is no room in the actual stations.Do we know where this is likely to be situated? Do Dingle Road or Penarth have the space to implement a double track or is it going to be one of these dynamic passing loops?
Thanks for the info BobI believe it's being finalised but will have to be a dynamic one somewhere, as you say there is no room in the actual stations.

Be fun as they've recently installed all new wiring where the loop was supposed to be. I suspect once the line gets extended from Coryton to Radyr it might be once putting a loop at Coryton againThe loop at Rhiwbina was dropped as decisions on spending priorities had to be made
The Metro programme as it stands is a 1st phase
When completed, requests for add ons, to enhance/extend can be considered
The new Cancer Hospital being built to replace Velindre provides an an opportunity to extend the line beyond Coryton to the new Hospital site - at which point a Loop at Rhiwbina is back on the table
With short and fixed intervals between trains on the shared sections, the timetable essentially fixes the amount of time between when each train goes up each branch and when it comes back. This dictates the locations of double track sections and passing loops, and which outer termini need a second platform.Yes but there is a proposal for a new bay platform at Rhymney which may mean that as one train runs in the other departs. It begs the question however as to why the need to extend the Tirphil loop.
Officially what’s being constructed now is Phase 2.The Metro programme as it stands is a 1st phase
Would be interesting to know what these regs are and when they came into effect, and how exactly the bridge fell foul of them.56xx I am on the down train. It uses the old one going down but uses the new returning. Quakers Yard is an issue as the bridge fell foul of new building regs. That is what I overheard from the driver and the guard. What a waste of money they said. QUITE!
Thanks for that @Markdvdman . The points and new signalling must be in operation now.56xx I am on the down train. It uses the old one going down but uses the new returning. Quakers Yard is an issue as the bridge fell foul of new building regs. That is what I overheard from the driver and the guard. What a waste of money they said. QUITE!
AIUI the signalling on Merthyr and Aberdare is now exactly as indicated on https://traksy.uk/live/M+57+QUAKRSY with the routes appearing correctly as wellThanks for that @Markdvdman . The points and new signalling must be in operation now.
I cycled down the Taff Trail last week when there were no trains. The new bridge, as well as serving the station also replaces a foot crossing giving access to the Taff Trail, which was about 30 metres north of the original platforms.
The bridge is now signposted as New Access to Taff Trail on the Edwardsville side. I asked the workmen if I could take my bike over the bridge and they said yes the bridge is ok but I have to take the bike down the steps as the ramp was faulty. So it may be the gradient of the ramp is the problem.
There have to be flat sections at regular intervals, double handrails, maximum gradients etc. which the ramp may have fallen foul of.
There will be a 2nd platform before Penarth station, just before the road bridge on the left. Trains will drop passengers off there before continuing to the current platform. Passengers may stay on if they require level access.I believe it's being finalised but will have to be a dynamic one somewhere, as you say there is no room in the actual stations.
There will be a 2nd platform before Penarth station, just before the road bridge on the left. Trains will drop passengers off there before continuing to the current platform. Passengers may stay on if they require level access.
From the Amey/TfW plan it looks like the track will be doubled after Dingle Road station.
This is all planned for 2024.