We know that the British loading gauge is quite restrictive compared to many other standard gauge railways in the world, in part because it was the first railway in the world and did not get bombed to oblivion in the same vein as European railways in World War 2 and therefore did not have the opportunity to rebuild itself. The consequences may be smaller trains compared to European counterparts, along with the lack of double-decker fleets, but this is something we accept as a minor cost compared to the prohibitive one of going through the trouble of rebuilding the infrastructure with little actual gains. However, I am curious to know why South Africa decided to opt for the British loading gauge measurements when it constructed it's Gautrain network that began operations in 2010.
How come despite using standard gauge tracks instead of the usual Cape gauge tracks the South Africans opted for the British loading gauge when building a brand new railway separated from the rest of the network instead of a wider loading gauge so trains could be ordered off shelf and be roomier for passengers instead of being bound to the same restrictions in rolling stock designs of British trains such as the tapered bodyshell shape, narrower dimensions, and lack of double-deck capabilities should they ever desire? Is it purely cost-related or is there more to it than that?
How come despite using standard gauge tracks instead of the usual Cape gauge tracks the South Africans opted for the British loading gauge when building a brand new railway separated from the rest of the network instead of a wider loading gauge so trains could be ordered off shelf and be roomier for passengers instead of being bound to the same restrictions in rolling stock designs of British trains such as the tapered bodyshell shape, narrower dimensions, and lack of double-deck capabilities should they ever desire? Is it purely cost-related or is there more to it than that?